Official casework recordDismissedCurrent release

Appeal 3199889

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a 4.0m deep rear single storey extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary and Procedural Matters

    The description of development in the banner heading above is taken from the original prior approval notification form submitted by the appellant. The appeal form provided a more detailed description of the dimensions of the proposed extension: “Application for prior approval in respect of the proposed erection of a single storey rear extension with the following dimensions: extends beyond the rear wall of the original dwellinghouse by 4 metres; the maximum height of the enlarged part of the dwellinghouse will be 3 metres; the height of the eaves of the enlarged part of the dwellinghouse will be 2.7 metres.”

    As well as the rear extension for which prior approval was sought, the drawings submitted by the appellant also showed a new porch on the front elevation of the dwelling. The Council therefore refused to grant prior approval for the extension, stating that “the application cannot be considered under the prior approval process” as a front porch is not within the scope of Schedule 2, Part 1, Class A of The Town and Country Planning (General Permitted Development) (England) Order 2015 (hereafter “the GPDO”).

    It will be evident from the information set out in the banner heading above that this appeal is somewhat “long in the tooth”; almost four years have passed since the Council issued its decision on 6 April 2018, and the appeal was submitted on the same day. The “start letter” confirming that the appeal was valid and setting out the appeal timetable was sent out to the main parties on 16 March 2020, nearly two years after the appeal was originally submitted, although there is nothing before me to explain why this took such a long time.

    The Planning Inspectorate case officer contacted the main parties in late June [address] to arranging access for an Inspector to carry out a site visit. Given the passage of time, they also asked the parties to comment on whether there had been any relevant changes in circumstances at the appeal site since the determination of the original application. The Council responded1 that on 26 April 2018 it had granted a Lawful Development Certificate (“LDC”) in respect of a hip-to-gable and rear roof extension, two front rooflights, and an enclosed porch2, and on 14 May 2018 had determined that prior approval was not required for a single storey rear extension, the description of which was the same as that set out in paragraph 2 above3.

    Site visits were scheduled for July 2020, but the Inspector was not able to access the appeal property’s rear garden. The case officer contacted the appellant on 30 July 2020 to attempt to reschedule a site visit, although this did not take place. From that point until March 2022, when I was appointed to determine the appeal, it appears to have been in a state of “suspended animation”.

  3. Section 04

    Reasons

    [site address] is the end property in a short terrace of four dwellings. The appellant arranged for me to gain access to the rear garden, from where I was able to see that a single storey rear extension had been completed. I also saw from the street that the works described in the April 2018 LDC, including a front porch, had been completed.

    Permitted development rights granted through the GPDO are subject to a number of conditions and limitations, including those set out at paragraph A.4 of Part 1, Class A, of Schedule 2. [name].4(10) states that development must not begin before one of three events occurs. These are: (a) the receipt by the developer from the local planning authority of a written notice that their prior approval is not required; (b) the receipt by the developer from the local planning authority of a written notice giving their prior approval; or (c) the expiry of 42 days following the date on which the [necessary information] was received by the local planning authority without the local planning authority notifying the developer as to whether prior approval is given or refused.

    The requirements of paragraph A.4(10) are, effectively, pre-conditions, and development will not benefit from permitted development rights if one of (a), (b) or (c) has not occurred. There is no dispute that the Council’s decision refusing prior approval was issued within the correct timeframe, and there is therefore no question of there being a “deemed consent” for the extension. In this case, prior approval was clearly refused, but the development has, 1 E-mail from [name], Merton Council, to Planning Inspectorate, 1 July 2020. 2 [name]: 18/P0967 3 [name]: 18/P1409 notwithstanding what appear to be some minor variations from the submitted drawings, been commenced and completed.

    The appellant has stated that the application was made for the rear extension only, and that this had been communicated to the Council; I have not addressed that matter here, as it could not alter my conclusion. I also note the appellant’s comments about the proposal according with the development plan. However, there is no statutory requirement to have regard to the development plan in relation to prior approvals, and again this point could not alter my

  4. Section 05

    overall conclusion.

    It is important to note that the Council’s later decision in May 2018 that prior approval for a single storey rear extension was not required does not, indeed cannot, alter my conclusion in this appeal. Permitted development rights only apply when the development, and the implementation of that development, fully accords with the limitations and conditions set out in the GPDO.

    As it is a prerequisite that prior approval is granted (or stated not to be required) before work commences, it is not possible for prior approval to be granted retrospectively in respect of the February 2018 application through this appeal. It therefore follows that the appeal should be dismissed.

    Given the background to this case, it is also worth adding a further final observation. Just as the later grant of prior approval for a rear extension cannot alter my conclusion here in respect of the February 2018 application for prior approval, so my conclusion in this appeal does not affect the Council’s issuing of an LDC in April 2018, its May 2018 decision that prior approval for a single storey rear extension was not required, or any development carried out lawfully as a result of those decisions. As a result, while it is clearly not satisfactory that it has taken the time it has for this appeal to be determined, the practical effects of this long delay are likely to be negligible for both the appellant and the Council.

  5. Section 06

    Conclusion

    For the reasons set out above, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 155No official casework-database value to compare
    Extracted decision date · page 1
    31 March 2022Matches the official casework database
    Extracted site visit dates
    21 March 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3199889
Application reference
18/P0947
Lead case reference
Not recorded
Planning authority
London Borough of Merton
Planning authority code
E09000024

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
3. Refused prior approval of permitted development rights
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
18 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
6 April 2018
Valid date
19 April 2018
Start date
16 March 2020
Planning authority decision date
6 April 2018
Appeal decision date
31 March 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
13218
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21