Skip to main content
Official casework recordNotice varied and upheldCurrent release

Appeal 3233490

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the use of the land from use for agriculture to land used for the stationing of a mobile home and touring caravans for residential occupation on the Land edged in red on the plan attached to the enforcement notice.

  1. Section 02

    Decision

    It is directed that the enforcement notice be corrected by the substitution of the following allegation for the allegation in the enforcement notice: ‘Without planning permission, the material change of use of the land edged red on the plan attached to the enforcement notice from a residential use to a mixed use of residential and use as a transit site for travellers which comprises the stationing and residential use of touring caravans.’

    It is also directed that the following requirements are substituted for the requirements of the enforcement notice: a) Cease the use of the land as a transit site for travellers which comprises the stationing and residential use of touring caravans; b) Remove from the Land the touring caravans and any material associated with the residential use of touring caravans and; c) Remove from the Land any resulting debris.

    It is also directed that the time for compliance with the requirements of the notice is increased from 2 months to 3 months. Subject to these corrections and variation the appeal is dismissed and the enforcement notice is upheld.

  2. Section 03

    Application for costs

    Prior to the Inquiry, an application for costs was made by the appellant against the Council of the London Borough of Bromley for an appeal1 that was withdrawn before the opening of this Inquiry. This application will be the subject of a separate Decision from the Costs branch of the Planning Inspectorate.

  3. Section 04

    Appeal site

    The appeal site is a parcel of land accessed off [site address] which is a one way road that gives access to the A20 trunk road. It contains a residential property, a mobile home that is accepted to be ancillary to the authorised residential use of the site, a stable block and a barn and a toilet block that serve an area of hardstanding to the south of the site which is used as a transit site for gypsy and traveller touring caravans.

    The entrance drive to the site originally served the whole property but aerial photographs show that sometime between 2015 and 2017, it had been split into 2 arms, one serving the top half of the site and the house and the other giving access to the hardstanding and adjacent toilet block to the south. Additional fencing had also been erected along the driveway providing a clearer definition between the 2 areas.

  4. Section 05

    Procedural matters

    At the Inquiry it was confirmed that the Council now accepts that the residential mobile home on the land, which is occupied by the appellant’s daughter, is authorised and the wording of the enforcement notice should be reflected to reflect this. Following this concession, the appellant has withdrawn the appeal on ground (c). The suggested change to the wording of the allegation in the notice is as follows: ‘Without planning permission, the material change of use of the land to a transit site for travellers for the stationing and residential use of touring caravans.’

    There was discussion at the Inquiry about the ‘red line’ area on the enforcement notice plan. The Council suggested that it could either stay as it is at present, that is around the whole of the appellant’s land ownership, or be amended to delineate a new planning unit that encompasses the southern area of hardstanding on which the transit site is situated and the access way to it .

    However, the appellant’s case is that it is the whole site, including the areas closer to the house, on which the touring caravans have been sited over the years and it seems to me that there is no reason to redraw the site plan ‘red line’. Should the appeal fail, the authorised residential use of the site would not be affected, nor would any authorised ancillary uses. In order to make this clear, I propose to amend the allegation, with slightly modified wording to that suggested to mention the mixed use, and delete the requirement to remove the mobile home. All authorised residential uses would therefore be unaffected.

    Following the amendments, the appellant also confirmed that the appeal originally made on ground (f) was also withdrawn. 1 Ref: APP/G5180/C/19/3233491

  5. Section 06

    [name]

    I therefore consider that the main issues in this case are now: On ground (d): whether the alleged breach of planning control is immune from enforcement action through the passage of time and If this ground fails then on ground (g): whether the time for compliance is reasonable.

  6. Section 07

    Reasons

    The appellant’s case is that, from 2003, he has always had touring caravans occupied by members of the gypsy and traveller community staying on the site on a transitory basis. He says he erected the toilet block and laid the hardstanding to the rear of the site to facilitate this use between 2006 and 2007 and submits that this is evidence that the use was active by this date.

    Aerial photographs show that the hardstanding and barn were present in April 2007, but do not show the toilet block. There are no aerial photographs available that show the site between 2007 and 2011 and the toilet block first appears in the photograph from 2012 when, apart from this, the site still appears to be in a similar condition to that in 2007.

    By 2013, it can be seen that further works were being undertaken to provide a more formal layout of pitches on the southern hardstanding with the addition of individual electricity supplies. In 2014, for the first time in the aerial photographs, there are multiple caravans seen on this area.

    After this date, each aerial photograph shows a number of caravans stationed on the southern part of the site and the Council submits that this marks the time when the use first commenced and that the 10 years continuous use necessary for immunity from enforcement action had therefore not been achieved by the time the notice was issued in 2019.

    It is for the appellant to provide precise and unambiguous evidence to demonstrate that, at any time during the 10 years prior to the issue of the enforcement notice, the Council could have taken enforcement action against the use. However, it seems to me that there is little evidence to show that the use was anything other than sporadic until 2014. Every aerial photograph produced by the appellant to support his case prior to this date fails to show caravans to the south of the site. Whilst there are caravans on the hardstanding close to the house in 2006, this is outside the relevant period and may well have been those owned by the appellant himself.

    There is very little evidence to show that any caravans using the site prior to 2014 were actually stationed on an organised transit site and were not merely in use by family or friends legitimately visiting the appellant. Such a use would be ancillary to the residential use of the site and would not have triggered a change of use that could be enforced against.

    Although the appellant claims that the photographs are only a snapshot in time and do not necessarily demonstrate that the use had not been taking place at other times, they nevertheless represent the main basis of his case and do not show an active transit site prior to 2014. It is not necessary for the Council to produce evidence of its own to counteract that of the appellant, if on the balance of probabilities, the appellant’s evidence is ambiguous or imprecise.

    [name] have been provided with some letters from travellers claiming to have stayed at the site over the last 10 years, they are not dated, give little specific detail and do not in my view, contribute greatly to the available evidence in favour of the appellant’s case.

    If the Council officers had visited the site at the times the pre-2013 aerial photographs were taken, they would have found no evidence to confirm the transit site use. The electricity to the southern hardstanding was not installed until 2013 and even though the toilet block was in position, it would have been within the authorised residential site. Therefore, it could not necessarily have been enforced against if there was no evidence to show that it was part of an unauthorised mixed use. The appellant stated that he, too, would travel during the summer months in the earlier part of the relevant period and that the gates to the site would be locked if no-one was there, preventing any travellers from using the site at these times.

    It seems to me that the appellant has failed to demonstrate that, had the Council visited the site prior to 2014, officers would have been more than likely to find a transit site in operation. I accept that the use of such a site may be sporadic but, if it is hoped to gain immunity from enforcement, the burden of proof is firmly on the appellant and it is for him to provide convincing evidence to support his claims. Where there are gaps in the chronology of the evidence, it is not necessary for the Council to provide contrary information to support its own understanding of the situation.

    Here, there are clear gaps in the evidence and nothing in the way of supporting documentation to show precise dates or levels of occupation of the site throughout the relevant period. I therefore consider that the appeal on ground (d) has not been supported by sufficient evidence to meet the level of proof required to demonstrate 10 years continuous use.

  7. Section 08

    Ground (g)

    At the Inquiry both parties agreed that the time for compliance should be varied to 3 months. I will therefore vary the notice accordingly.

  8. Section 09

    Conclusions

    For the reasons given above, I find that it has not been shown, on the balance of probabilities, that the site was in the continuous mixed use enforced against for at least 10 years prior to the issue of the enforcement notice and I therefore conclude that the appeal should not succeed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 62No official casework-database value to compare
    Extracted decision date · page 1
    5 July 2021Matches the official casework database

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3233490
Application reference
Not recorded
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Enforcement Notice
Procedure
Inquiry
Development type
Change of use
Appeal type reason
LPA's service of an Enforcement Notice
Appeal reason
Not recorded
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Notice varied and upheld
Decision category
Dismissed
Received date
18 July 2019
Valid date
24 September 2019
Start date
27 May 2020
Planning authority decision date
Not recorded
Appeal decision date
5 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
4
Enforcement grounds
c,d,f,g

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
145
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
20 August 2026 at 16:25