Appeal 3248271

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

detached building for the maintenance of plant and machinery associated with the storage before and after processing and processing of waste materials which is the subject of a Certificate of [name] dated 9 September 1998 (retrospective).

  1. Section 02

    Decision

    The appeal is allowed and the planning permission Ref 16/02366 for a detached building for the maintenance of plant and machinery associated with the storage before and after processing and processing of waste materials which is the subject of a Certificate of [name] dated 9 September 1998 (retrospective) at [site address] , granted on 11 September 2019 by the Royal Borough of Windsor and Maidenhead Council, is varied by deleting condition 1 and substituting for it the following condition: The building hereby approved shall be used only for the servicing and maintenance of plant, machinery and vehicles used in conjunction with the lawful use of the site as a waste processing facility or any other lawful use of the site.

  2. Section 03

    Application for costs

    An application for costs made by Fowles Crushed Concrete Limited against the Royal Borough of Windsor and Maidenhead was initially withdrawn by letter dated 4 February 2021 but has subsequently been reinstated. This is the subject of a separate Decision. Costs Decision APP/T0355/W/20/3248271

  3. Section 04

    Procedural Matter

    The appeal was due to be considered at a Hearing. The appellant and the Council concurred that this would not be necessary if an agreed replacement planning condition is substituted for the condition the subject of this appeal. The agreed replacement condition is: The building hereby approved shall be used only for the servicing and maintenance of plant, machinery and vehicles used in conjunction with the lawful use of the site as a waste processing facility.

  4. Section 05

    Main Issue

    The main issue is whether the disputed condition satisfies the tests for planning conditions, particularly in relation to the period of time the building has been in existence.

  5. Section 06

    Reasons

    The appeal relates to a detached building approximately 25m long, 16m wide and 8.7m high. It is located in the northern part of a large site used as a waste processing facility. At the time of my visit the building was in use for the maintenance of vehicles and plant used on the site and for the storage of tools.

    The tests for planning conditions are set out in Paragraph 55 of the National Planning Policy Framework: “Planning conditions should be kept to a minimum and only imposed where they are necessary, relevant to planning and to the development to be permitted, enforceable, precise and reasonable”.

    The planning application form claimed that the building was erected in July/August 2015. As such, it would have existed for more than 4 years and become lawful when the Council took its decision on the application in September 2019. At the time of the decision, as the building was lawful, it would have become immune from enforcement action. Enforcement action requiring the removal of the building, as operational development, could not be taken due to the passage of more than 4 years since the building’s construction. Therefore, the inclusion of a clause in condition 1 requiring the building to “be completely removed from the application site” when no longer required for specified purposes would fail the test of being enforceable. The condition as drafted also fails the test of being necessary to make the development acceptable. If it had not been imposed, it would not have been necessary to have refused permission for a proposal to use the building in connection with the lawful use of the site.

    The condition as drafted states the approved building “shall be used only” for purposes specified in the condition. It precludes the building being used for other purposes which could arise from a non-material change of use not requiring a grant of planning permission. The appellant has provided an illustration of a possible change to the existing lawful use as a waste processing centre “to a use comprising the importation of land won minerals and the processing of such minerals in some manner as to render them more beneficial as builders’ materials”. The condition would not only preclude the building being used for purposes in connection with this or other similar alternative lawful uses but would also require its removal in these circumstances. In these respects, the condition would fail the test of being reasonable. Costs Decision APP/T0355/W/20/3248271

    The condition as drafted refers to the “lawful use of the site as a waste transfer/sorting facility”. The evidence before me confirms that the lawful use also includes the processing of waste products. There is also ambiguity about whether the phrase “servicing and maintenance of plant and machinery” also includes vehicles. In this respect the condition repeats a phrase on the planning application form. However, it would be entirely appropriate for vehicles used on site to be serviced and maintained in the same way as other plant and machinery operated in accordance with the lawful use of the site. It would be possible to rectify and clarify these matters through the substitution of the replacement planning condition in paragraph 3 above, agreed by the appellant and the Council in setting aside the need for an appeal hearing.

    Notwithstanding the parties’ cooperation in negotiating this replacement condition as a compromise on their starting positions on this appeal, this condition would still preclude the use of the building in association with an alternative lawful use of the wider site. An expanded condition to include “or any other lawful use of the site”, as suggested as another option by the appellant, would address this concern. Planning Practice Guidance advises that conditions restricting future changes of use may not pass the test of reasonableness or necessity.1

    It is usually not possible to rely just on the description of a development to control or restrict that development. A planning condition may be necessary to do this. A planning condition that reiterates the description of a development, in this case the building and its use, would also enable the Council to pursue a different and unacceptable unauthorised use of the building through a breach of condition notice, should it be expedient to do so.

    Whilst the appellant favours the complete removal of the disputed condition without substitution, in my judgement the appellant’s alternative preferred condition, if a condition is to remain, is warranted under all the circumstances of the case.

  6. Section 07

    Other Matters

    Several residents have raised objections to the appeal in relation to the building being detrimental to the openness of the Green Belt. Indeed, the reason for the condition as imposed by the Council related to Green Belt concerns. However, as the building is now lawful its impact on the Green Belt cannot now be challenged. The Green Belt does not need to be safeguarded against the contingency of one lawful use being replaced by another. Moreover, the building is not unduly large in relation to the size of the site and height of processed material and it is relatively well screened from outside the site.

    Some have questioned why repairs to machinery cannot be undertaken outside. I think it reasonable that such repairs and the storage of associated tools and equipment takes place under cover with protection from adverse weather conditions.

    Others have objected on the grounds of flooding; I concur with the findings of the Council that the application demonstrates that the building will not affect flood flow and storage capacity as the structure is floodable and therefore flood storage will not be affected. 1 PPG paragraph 21a-[phone] Costs Decision APP/T0355/W/20/3248271

    Several residents have objected to the impact of lorries coming to and from the site and to noise and dust arising from waste processing operations. But these activities are in accordance with the lawful use of the site and measures are in place to control the entry and exit of vehicles at the site in the interests of highway safety.

  7. Section 08

    Conclusion

    I have concluded that the condition is only necessary and reasonable to clarify inclusion of vehicle maintenance in the building’s use and that its use should be in conjunction with the lawful use of the site as a waste processing facility or any other lawful use of the site. I shall replace the condition the subject of the appeal with one to confirm these matters.

    For the reasons given, the appeal should succeed, and the planning permission varied as set out in the formal decision.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 89No official casework-database value to compare
    Extracted decision date · page 1
    2 July 2021Matches the official casework database
    Extracted site visit dates
    28 April 2021 (page 1)
  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 89No official casework-database value to compare
    Extracted decision date · page 1
    2 July 2021Matches the official casework database
    Extracted site visit dates
    28 April 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3248271
Application reference
16/02366
Lead case reference
Not recorded
Planning authority
Royal Borough of Windsor and Maidenhead
Planning authority code
E06000040

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor general industry/storage/warehousing
Appeal type reason
4. Grant planning permission for the development subject to conditions to which you object
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
7.6 hectares
Floor space
400 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
4 March 2020
Valid date
4 March 2020
Start date
31 December 2020
Planning authority decision date
11 September 2019
Appeal decision date
2 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
82
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21