Appeal 3260569
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Without planning permission: Installation of 2 x [name] to the front of the ground floor unit.
Section 02
Decision
The appeal is allowed and the enforcement notice is quashed.
Section 03
Application for Costs
An application for costs was made by [name] against the Council of the London Borough of Camden. This application is the subject of a separate
Section 04
Preliminary Matters
By a letter dated 15 July 2021, arrangements were made for me to inspect the site, accompanied by a representative of the Council and the appellant. No one attended to represent the Council. Given that the items which are the subject of the appeal are plainly visible from the public highway and having tried to contact the Council (via the case officer) to find out if a Council representative was on their way, I determined the most suitable course of action was to proceed with my visit.
My attention has been drawn to an earlier enforcement notice, dated 11 February 2020. But this is not before me for consideration in this appeal.
Section 05
Reasons
An appeal on ground (b) is that those matters stated in the notice have not occurred as a matter of fact. An appeal on ground (c) is that that those matters (if they occurred) do not constitute a breach of planning control. These are both legal grounds of appeal. As such, the burden of proof is on the appellant (and not the Council) to make out their case, to the standard of the balance of probabilities, ie whether something is more likely than not.
Section 06
Ground (b)
The Council alleges that 2 jumbo umbrellas have been installed to the front of the ground floor unit. This is entirely consistent with my observations at my site visit. It is the appellant’s view that the umbrellas do not constitute an “installation”. But this is a point which goes to the appellant’s ground (c) appeal, which I address below. Consequently, the appeal on ground (b) fails.
Section 07
Ground (c)
In an appeal on ground (c), the matters stated in the notice may not constitute a breach of planning control if what is alleged in the notice is not “development”, as defined by section 55 of the 1990 Act.
Section 55 of the 1990 Act defines “development” as including the carrying out of building, engineering, mining or other operations in, on, over or under land, or the making of any material change in the use of any buildings or other land.
The dispute in this case is focussed on whether the umbrellas constitute a building operation for the purposes of section 55. Case law has identified three primary factors as decisive of what constitutes a building: size, permanence and physical attachment to the land. None of these alone is necessarily decisive and greater weight may be given to one factor over the others.
Whilst the umbrellas are large, there is no evidence they were not brought onto the site in an assembled form and slotted into their bases. The umbrellas are easily unfurled or collapsed by the turning of a handle. The base of each umbrella is mounted on wheels and so, despite their weight, each umbrella may be moved around relatively easily. This was obvious at my site visit. Legs may be lowered from each corner of each base, for support. But in my judgement, this does not undermine their moveability.
The umbrellas rest by their own weight and are otherwise not physically attached to the ground. Heaters attached to the umbrellas may be easily plugged into/detached from electrical points set within the decking on which the umbrellas stand. The umbrellas have not resulted in any permanent physical alteration to the land.
I place considerable weight on the ease with which the umbrellas may be wheeled around and so taking into account the above points, I am satisfied that neither umbrella constitutes a building and so neither umbrella is a building operation for the purposes of section 55, noted above.
I have taken into account the Council’s point that the umbrella bases have been seen in the same layout throughout March to December 2019. But this does not necessarily mean they constitute development. Moreover, in my judgement it makes no difference whether the umbrellas are moved from their bases, or from the forecourt and put inside the building.
My attention has been drawn to other appeal decisions referred to in the Council’s submission. The appeal decisions dating from 2016 concerned wooden structures. Based on the information provided, I am not satisfied these are comparable to the umbrellas before me or that the circumstances of these cases are the same as those in the case before me.
The parasols which were the subject of the first 2003 appeal decision referred to by the Council were fitted into sunken fixing points. The “marquee”/”sunbrellas” which were the subject of the second 2003 appeal decision referred to by the Council were anchored in a concrete footing. I am not satisfied these circumstances are comparable to those in the case before me. Therefore, the other appeal decisions I have been referred to have not changed my overall conclusion in this case.
I conclude the appeal on ground (c) succeeds.
Section 08
Conclusion
For the reasons given above, I conclude that the appeal succeeds on ground (c) and the enforcement notice is quashed. In these circumstances, the appeal on ground (a) and the application for planning permission deemed to have been made under section 177(5) of the 1990 Act do not fall to be considered.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 69No official casework-database value to compare
- Extracted decision date · page 1
- 6 September 2021Matches the official casework database
- Extracted site visit dates
- 27 July 2021 (page 1)
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 69No official casework-database value to compare
- Extracted decision date · page 1
- 6 September 2021Matches the official casework database
- Extracted site visit dates
- 27 July 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3260569
- Application reference
- Not recorded
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Camden
- Planning authority code
- E09000007
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Enforcement Notice
- Procedure
- Written Representations
- Development type
- Major retail and services
- Appeal type reason
- LPA's service of an Enforcement Notice
- Appeal reason
- Not recorded
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Quashed On Legal Grounds
- Decision category
- Other
- Received date
- 5 October 2020
- Valid date
- 5 October 2020
- Start date
- 11 January 2021
- Planning authority decision date
- Not recorded
- Appeal decision date
- 6 September 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- 3
- Enforcement grounds
- a,b,c
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 2688
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25