Skip to main content
Official casework recordNotice varied and upheldCurrent release

Appeal 3261848

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

, without planning permission, the erection of a two-storey rear extension, the erection of a detached garage and the erection of fence and gates along the front of the property and that is in excess of 1 metre high.

  1. Section 02

    Main issues

    The main issues are: • The effect of the two-storey extension on the living conditions of neighbours in terms of outlook and sense of enclosure. • The effect of the fence on the character and appearance of the area.

  2. Section 03

    Living conditions

    [site address] and [address] form a semi-detached pair of dwellings. The rear part of [address] has an ‘L’ shaped plan form with a small detached outbuilding on the common boundary. The appeal property had a single-story rear extension that met this outbuilding, so there has been a degree of enclosure to the immediate rear of [address] for some time.

    [address] has obscure glazing in a back door and a ground floor bathroom window, both facing the appeal property. [name] have no doubt the two-storey extension has reduced the natural light to the bathroom, it is not a habitable room and the outlook from it is therefore of limited significance.

    Views from a rear facing kitchen window are framed by the bathroom, the outbuilding, and the two-storey extension. Although the kitchen is small, and regardless of how it may be used now, it has the potential to accommodate a small dining area. It is reasonable to take account of this, and the possibility of habitation, when assessing the effect of the two-storey extension.

    There is a first-floor window directly above the kitchen window. Although this window receives more light, the two-storey extension has reduced the outlook from it. While the appellant refers to a letter from a former occupier to suggest this is a bathroom window, the letter does not say where the bathroom was and, as noted, there is a ground floor bathroom.

    The two-storey rear extension projects significantly further than the single-storey extension did and reaches the rear boundary. As a result, it intrudes in the outlook from rear facing windows in [address], is overbearing, and increases the sense of enclosure.

    The appeal site previously contained mature trees that affected the outlook from [address]. However, as those trees have been felled, an accurate comparison with the current situation is not possible. Even so, there would have been a degree of outlook through and beneath the branches and, as the trees were deciduous by all accounts, there would have been seasonal variations. Furthermore, photographic evidence shows that the largest tree, a weeping willow, was significantly further away from [address] than the two-storey extension. This would have reduced its effect in terms of outlook and sense of enclosure.

    Consequently, the two-storey extension impacts upon a neighbouring land use by reason of visual intrusion and it has not been demonstrated that an appropriate level of residential amenity has been secured.

  3. Section 04

    Character and appearance

    Roadside dwellings in the area are interspersed with agricultural land and tend to have open road frontages or low hedges. While some modern dwellings have high hedge boundaries, these are set back from the road, which helps to maintain a degree of openness.

    The sense of openness and the predominance of hedge boundaries are important components of the rural character of the area. In contrast, the fence forms a hard boundary with an urbanising effect. It has not been demonstrated that it would contribute to the landscape character of the location.

  4. Section 05

    Conclusion on ground (a)

    For the reasons given, the two-storey extension has an adverse effect on living conditions for occupiers of [address] and is contrary to policies 2 and 3 of the South East Lincolnshire Local Plan 2011-36. For the separate reasons given, the design of the fence is inappropriate to the local area and is also contrary to policy 3.

    Accordingly, the two-storey rear extension and fence are unacceptable and the appeal on ground (a) must fail.

  5. Section 06

    The appeal on ground (f)

    For the appeal to succeed on this ground, the appellant must demonstrate that the steps required to comply with the notice are excessive and that lesser steps could overcome the alleged breach of planning control. The breach of planning control to which the notice’s requirements apply is the erection of a two-storey rear extension and a fence along the front of the property exceeding 1 metre in height. The purpose of the notice is to remedy the breach.

    The appellant has indicated that, if the notice is upheld, he will erect a replacement extension and a new fence, both within the parameters permitted by the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the Order). It is therefore submitted that a fallback exists, and the notice should be varied to require the extension to be reduced in size and the fence to be reduced in height, such that they are permitted by the Order.

    While this variation is suggested in good faith, it presents 2 practical difficulties in respect of the two-storey extension. The first is that reducing the extension would not remedy the breach of planning control if a 2-storey rear extension, as described in the notice, would still exist. Secondly, the changes that would need to be made for the extension to correspond to what the Order would have permitted have not been identified, neither has it been demonstrated that such changes are structurally feasible. Consequently, and in view of the nature and extent of work that might be required, the variation that would follow from the appellant’s argument would make the notice imprecise. This is unacceptable because it would not be certain how to achieve compliance.

    In contrast, there can be certainty about the suggested reduction in the height of the fence. Class A of Part 2 of Schedule 2 to the Order provides, subject to limitation A.1(a)(ii), that a replacement fence not exceeding 1 metre in height adjacent to [site address] would be permitted development. If the notice were varied to require a similar result, it would be sufficiently clear for the appellant to know how to comply.

    Consequently, requirement (b) is excessive and the appeal on ground (f) succeeds to the extent that the notice should be varied to allow the option of reducing the height of the existing fence such that it does not exceed 1 metre.

  6. Section 07

    The appeal on ground (g)

    It is not disputed that the two-storey extension could be demolished within the 6-month period stated in the notice. However, it contains a kitchen and bedroom and demolition would therefore disrupt the appellant’s household. The suggested alternative of 9 months would provide greater flexibility and may reduce the likelihood of disruption during school term times.

    In addition to his stated intention of building a permitted development rear extension, the appellant may apply for planning permission for an alternative scheme. The 6-month period stated in the notice should be sufficient for an application to be submitted and determined and the Council has confirmed that a revised timescale could be agreed if appropriate, as allowed by section 173A(1)(b) of the Act.

    However, both courses would involve the construction of a replacement extension. The time required for this should be considered, if only to make it more likely that demolition and construction could be undertaken as a single project, thus minimising disruption to the appellant’s family.

    The appeal on ground (g) therefore succeeds and the notice should be varied accordingly.

  7. Section 08

    Conclusions

    For the reasons given above, I conclude that the appeal on ground (a) should not succeed and the appeals on grounds (f) and (g) should succeed. I shall uphold the enforcement notice with variations and refuse to grant planning permission on the application deemed to have been made under section 177(5) of the Act.

  8. Section 09

    Formal Decision

    The appeal succeeds on grounds (f) and (g) and it is directed that the enforcement notice be varied in section 5 b) by: • The insertion of the words “or reduce the fence to not exceed 1 metre in height” after the words “Demolish the fence”; and • The insertion of the words “or reduction in height” after the words “that demolition”.

    It is further directed that the notice be varied in section 6 by the deletion of the words “six months” and the substitution of the words “9 months”.

    Subject to these variations the appeal is dismissed, the enforcement notice is upheld and planning permission is refused on the application deemed to have been made under section 177(5) of the Act.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 214No official casework-database value to compare
    Extracted decision date · page 1
    9 July 2021Matches the official casework database
    Extracted site visit dates
    8 June 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3261848
Application reference
Not recorded
Lead case reference
Not recorded
Planning authority
Boston Borough Council
Planning authority code
E07000136

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Enforcement Notice
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
LPA's service of an Enforcement Notice
Appeal reason
Not recorded
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Notice varied and upheld
Decision category
Dismissed
Received date
23 October 2020
Valid date
23 October 2020
Start date
17 December 2020
Planning authority decision date
Not recorded
Appeal decision date
9 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
3
Enforcement grounds
a,f,g

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
437
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
20 August 2026 at 16:25