Skip to main content
Official casework recordAllowedCurrent release

Appeal 3261988

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the removal of condition 1 (temporary permission) attached to planning permission 20/0096 to operate no later than 1 year from the date of permission granted planning permission for a limited period Ref 20/0096, dated 28 May 2020.

  1. Section 02

    Decision

    I allow this appeal and grant planning permission for the use of premises as a childrens home for up to 4 children (between the ages of 6-18) at [site address] effective from 28 May 2021 in accordance with application Ref 20/0425 is dated 23 July 2020 subject to the following conditions:

    The use hereby permitted shall be for a limited period being the period of 2 years from 28 May 2021.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan and Proposed Layout Plan.

    The use hereby permitted shall at all times operate in accordance with the Management Plan received by the Council on 27 February 2020 which includes the following provisions: • Therapy to be provided by in-house staff; • No education in lieu of mainstream schooling to be provided on-site; • Shift changeovers to be staggered to ensure that off-street parking provision is not exceeded; • Neighbouring properties to be advised of management contact details in case of complaints; and • Children to abide by [name] to be made available in writing upon request.

    The property shall only be occupied on a residential basis by no more than 4no. children aged 6-18yrs either: • placed by Blackpool Council; • placed by another Authority with the prior written agreement of Blackpool Council.

  2. Section 03

    Preliminary Matters

    A temporary one-year planning permission was granted by the Council on the basis that there was an accepted need for children’s home provision in the area emphasised by the pandemic. The Council came to a view that the urgent need for this type of accommodation outweighed the concentration of children home provision in the local area for a time limited period. This temporary planning permission expired on 28 May 2021 which is after the date on which the Council refused the application to vary the disputed condition.

  3. Section 04

    Main Issue

    The main issue is the effect of the continued use of the appeal property as a children’s home having regard to the character of the area, living conditions of neighbouring residents and the provision of children’s homes.

  4. Section 05

    Reasons

    Saved Policy BH24 of the Blackpool Local Plan 2001/2016 (Local Plan) sets out that development of residential institutions, community care residential developments and other similar uses will be permitted in appropriate premises and locations subject to a number of criteria. The policy also explains that to protect the character and amenities of residential areas and to avoid any undue concentration no community residential uses meeting specialist needs will be permitted within 400 metres of existing properties meeting similar needs. A similar approach is proposed in the emerging plan, but I attach little weight to this given its stage of preparation and as I do not know whether there are any unresolved objections to it. This does not, however, change the development plan status of the Local Plan.

    The general location of the property, outside of the defined Inner Area and in a settled residential area is suitable for use as a children’s home. The property is also of a suitable size and format to accommodate up to 4 children. While residents are concerned about the proposed uses effect on the amenity of the local area, and the incident reported, planning conditions could be used to prevent unacceptable impact. It would also be for the Council to ensure children are suitably placed with their best interests in mind. Regardless, the proposal breaches saved Local Plan Policy BH24 as there is already a property in a similar use within 400 metres of the appeal site. The proposal would therefore result in an over concentration of this type of housing which would be detrimental to the character of the area when judged against this policy even if they are regulated by OFSTED and provide for children of Blackpool.

    Existing policies should not be considered out-of-date simply because they were adopted or made prior to the publication of the of the National Planning Policy Framework (the Framework). In my view, saved Policy BH24 is broadly consistent with Framework paragraphs 61, 91 and 92 given what it seeks to support and deliver. This is the provision of residential institutions, community care residential developments and other similar uses considering local need, the suitability of the premises and location, the character of the area and living conditions of residents. Whilst the wording differs, the objectives of the policy and Framework broadly align.

    Applying a buffer around certain uses and preventing the addition of further uses within that buffer will, at some point, limit how many similar uses can ‘fit’ within a particular spatial area. The Council’s map generally shows greater provision of children’s homes in the south of the Borough. While the appellant makes a point about the potential effect of planning permissions being granted in the north of the Borough, there is no reason why, looking at the 400 metre rule in isolation, the Borough’s accepted need for this type of housing could not be met or aided by provision outside of the Inner Area in the North or in areas unaffected by the 400 metre buffer even if the scope for this is more limited in the south. At present, the 400 metre rule does not seem to be preventing the Council from meeting its duty to place children within the local area.

    I am mindful that uses of the nature applied for should be located within stable and secure neighbourhood environments. This, alongside other factors such as the geography of Blackpool, existing provision of homes across the Borough, compatible land uses and potential deprivation, could, notwithstanding the 400 metre rule, mean that Council’s policy approach is inflexible and would not address the accepted need for this type of housing. However, there is no substantive assessment to show how these factors and any others could collectively affect the provision of such uses across the Borough. Without this I cannot agree with the appellant that saved Local Plan Policy BH24 is out of date or inconsistent with the Framework given other areas could potentially accommodate this use in Blackpool without contravening the 400 metre buffer.

    While the appeal property may not have been used extensively over the temporary period granted by the Council, the evidence before me points to a clear and demonstrable need for this type of housing provision in Blackpool as it has the highest number of looked after children per 10,000 people in the country. Added to this, not every existing provider in Blackpool works with the Council to offer places to children. The upshot is that around 75% of children are placed in homes outside of Blackpool. This is recognised by the Council who outlines that it has a multi-pronged strategy to address the need for childcare. Time will tell whether this strategy brings about the change being sought whilst meeting the need for childcare provision as it will take time to achieve so that children’s welfare and upbringing is not compromised.

    There are no details before me of how quickly the Council anticipates seeing results of their efforts, and I am mindful of the complex challenges that face the care system and of the present day accepted need. Furthermore, the pandemic is still ongoing and its effects fluctuate, even if the general picture has shifted compared to when the Council granted planning permission in

    It is also unclear at this stage whether the pandemic will have any greater bearing on the need for childcare provision in the Borough.

    Therefore, the continued use of the appeal property would help meet this need albeit modestly even if it wouldn’t necessarily bring children with a Blackpool connection currently placed elsewhere back to Blackpool or addressing the need of children with the most complex and challenging requirements and behaviours. Any future placement at the site would be made by, and in conjunction with, the Council.

    Balanced against this is the conflict that the proposal would have with saved Local Plan Policy BH24 due to the concentration of uses within a relatively small area, which affects the balance of dwelling houses and children homes in the local community. This leads me to consider that the proposal could harm the character of the area. Hence, a permanent planning permission for the use would not be appropriate. However, I conclude that this conflict would be outweighed to the extent that it would be appropriate to grant a further temporary planning permission. The reasons for this are due to the uncertain effects of the pandemic, the need for this type of accommodation, the time that the Council’s strategy could take to come to fruition, and for the appellant to secure appropriate alternative premise.

    No specific period of time has been suggested by either party, but it seems reasonable and proportionate to me to grant a 2 year permission to allow for progress on all these matters whilst providing stability for the appellant and children. I note the appellant’s point about being unable to secure full registration with OFSTED without a permanent planning permission, but the Council’s Advice Note states that OFSTED requires an operator to demonstrate that planning permission is either granted or not required before it will register a property. While a temporary planning permission may not be what the appellant has sought through this appeal, it is a planning permission.

  5. Section 06

    [name]

    While personal details of a previous occupier such details should be handled with care and sensitivity, any issues relating to this lie outside of the scope of this appeal.

  6. Section 07

    Conditions

    A condition limiting the length of the planning permission is necessary for the reasons set out above and in the interests of certainty. The start of this period is backdated from the date on which the temporary planning permission previously granted expired. An approved plans condition is necessary also in the interests of certainty. To ensure residents living conditions are not adversely affected a condition to secure the Management Plan is necessary as is a condition limiting how the use can operate and at what scale. The latter is also necessary to ensure the scheme helps meet the identified need.

  7. Section 08

    Conclusion

    For these reasons, the proposal conflicts with the development plan as a whole but the material consideration relating to need indicates that I should take a different decision other than in accordance with this. While my decision does not follow that of the Council, I have considered the appeal on its planning merits alone which has required careful consideration and balancing of the effects of the proposal against the need for this type of accommodation.

    For the reasons given above I conclude that the appeal should succeed. I will grant a new planning permission subject to conditions. The permission will take effect from the date when the previous permission expired.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 245No official casework-database value to compare
    Extracted decision date · page 1
    5 July 2021Matches the official casework database
    Extracted site visit dates
    15 June 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3261988
Application reference
20/0425
Lead case reference
Not recorded
Planning authority
Blackpool Borough Council
Planning authority code
E06000009

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
2. Refused permission to vary or remove a condition(s)
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Other
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.2 hectares
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
26 October 2020
Valid date
26 October 2020
Start date
25 November 2020
Planning authority decision date
5 October 2020
Appeal decision date
5 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
157
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21