Appeal 3262156
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
construction of No.1 3 bedroom dwelling and detached garage.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The planning application was reported to the Council’s Planning Committee on 10 November 2020 in order to provide an indication of the Council’s decision had the application not been appealed on the grounds of non-determination.
The development plan includes the Braintree District Local Plan Review (2005) (Local Plan) and the Braintree District Council Core Strategy (2011). The emerging development plan is the Publication Draft Local Plan (2017). The plan is in two sections. Local Plan 2013-2033 Section 1 is a strategic plan for [name] and was adopted by the Council in February 2021.
The Council refers to policy CS 9 of the [name] in its reasons for refusal. However, adoption of Section 1 had the effect of superseding policy CS 9. Section 2 of the Publication Draft Local Plan is currently the subject of examination. Although the Draft Local Plan has reached an advanced stage there is no certainty that the policies within the document would be adopted. Only limited weight may therefore be accorded to its relevant policies at present.
The Council initially indicated that it could not demonstrate a required 5-year housing land supply, quoting a figure of 4.52 years for 2020-2025. Following its latest review, the Council now considers that it can demonstrate a housing land supply of 5.34 years. The appellants were consulted on the Council’s submission and provided comments on matters which they considered to be relevant to the application subject to appeal.
Section 04
[name]
The main issues are: • whether the proposal would be in a sustainable location having regard to development plan policies; • the effect on the character and appearance of the countryside, and • the effect on highway safety.
Section 05
Reasons
The appeal site is a plot of lawned garden land used in association with No. [site address] . No.20 and neighbouring dwellings are former Land Settlement Association houses which generally had large plots of land used for small scale farming.
Section 06
Whether a sustainable location having regard to development plan policies
The appeal site is located in the open countryside and outside any settlement envelope as defined in the adopted Local Plan. The proposed dwelling would conflict with Local Plan policy RPL 2 which confines new development to areas within town development boundaries and village envelopes. It would also conflict with [name] policy CS 5 which indicates that outside such areas development will be strictly controlled to uses appropriate to the countryside in order to protect and enhance its landscape character, biodiversity, and amenity.
The host dwelling is part of a ribbon of development along one side of [address]. Policy RLP 16 of the Local Plan supports the filling of a gap for a single dwelling, between existing dwellings in hamlets and small groups of dwellings. A hamlet is defined as having a nucleus of ten or more dwellings. The appellants have referred to the site being within the ‘established built-up hamlet of [address]/[name]. The policy does not apply to proposals for individual isolated dwellings, or the extension of ribbon development, and will not apply to gaps which could accommodate more than one dwelling.
The appeal proposal would not involve an isolated dwelling. However, it cannot be supported under the terms of Local Plan policy RLP 16 because it would extend the ribbon development along [address]. The site could also occupy more than a single dwelling. Moreover, it could set a precedent whereby the Council could find applications for other plots of land in similar circumstances in the locality difficult to resist.
The appellants consider that the site is part of the Land Settlement Association original linear development, and the proposal would continue this characteristic, rather than constituting ribbon development. Nevertheless, the association of dwellings with large plots of land is typical of this form of development and that would be significantly eroded by the proposal.
The appellants advise that the site is around 400 m, or [address], from the settlement of [site address] and that there is a length of around 100 m where pedestrians have to use a grass verge. [site address] has a school, church, village store, small supermarket, public houses, takeaways, and other services. It also provides access to bus services which have connections to Braintree, Colchester, Halstead, and Sudbury.
[address] has a 50 mph speed restriction. There is no footway on [address] outside the appeal site. Although there is a grass verge it is narrow at this point and pedestrians would be close to passing vehicles. There is no street lighting near the site and from the submissions it appears that pedestrians use torches when walking in the evenings. The narrow grass verge near the appeal site would not be ideal for low mobility users or use by families with young children. In this situation it is likely that any future occupiers of the proposed building would be reliant on private transport to reach services, public transport, and facilities in [site address] as the safest and most practicable option. I therefore find that the proposal would not be located in a sustainable location which would have easy access to public transport, or convenient pedestrian access to services and facilities in [site address] , contrary to [name] policy CS 7.
Section 07
Character and appearance
The dwelling would be set back from [address] and would be accompanied by a cart shed. It would not appear unduly prominent because of the screening effect of existing frontage vegetation. Other dwellings in the vicinity have dormer windows and clearly the dwelling has been designed in terms of form, scale and use of external materials to reflect the character and appearance of other Land Settlement Association dwellings.
Although the Council considers that the design would represent a pastiche, I find that the proposed dwelling would not conflict with the building design requirements of Local Plan policy RLP 90. However, in terms of siting and layout, the proposed dwelling would harm the open character of the setting of No. [site address] which is a feature of the layout and pattern of development of the Land Association Houses. It would fail to integrate into the local landscape and would harm the character and appearance of the countryside, contrary to Local Plan policy RLP 80 and [name] policy CS 8.
Section 08
Highway safety
Essex County Council is the highway authority and its supplementary guidance: Development Management Policies (2017) is relevant. The submitted location plan indicated visibility splays for the access to the site of 2.4 x 100 m in either direction. The Highway Authority has indicated that visibility splays of 160 m in either direction should be provided unless a speed survey is carried out which demonstrates that actual speeds of passing traffic at the site would allow a lesser visibility splay.
The appellant has submitted a revised drawing which indicates that a visibility splay of 2.4 x 160 m can be achieved in a northerly direction and a splay of 2.4 m x 120 m in a southerly direction towards the village. I note the representation regarding the [name] for Roads and [name] TD41/95 and the potential slowing of traffic from the south as it leaves the 30 mph zone at the village and approaches up the road slope. It appears to me that it is likely that the revised visibility splays would be acceptable with no consequent decrease in highway safety. However, the matter would require to be resolved through a speed survey to ensure no conflict with policies DM1 and DM4 of Essex County Council’s Development Management Policies.
Section 09
Other Matters
In responding to the Council’s revised housing land supply calculations, the appellants have drawn my attention to the significance of windfall development and examples of housing granted permission on appeal at Bulmer and Gestingthorpe. In both these cases the failure of the Council to demonstrate a 5 year housing land supply was a significant matter. I note that the Council submitted a more recent appeal decision for [address], Bulmer in which a development including two proposed houses was dismissed. I have determined the appeal before me based upon the individual merits of the proposal and its particular site circumstances, including its inclusion within the original Land Settlement Association development.
Section 10
Conclusion
The proposed development would provide some benefits through employment at the construction stage and would add to the housing supply. Nevertheless, these benefits from a single dwelling would be limited.
Even if the council were unable to demonstrate a five year housing land supply, I conclude that the adverse impacts of granting permission would significantly and demonstrably outweigh the benefits from the proposal.
I have taken all other matters raised into account, including the use of garden land and lack of harm to the amenity of neighbours. However, for the reasons given above I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 108No official casework-database value to compare
- Extracted decision date · page 1
- 6 September 2021Matches the official casework database
- Extracted site visit dates
- 4 May 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3262156
- Application reference
- 20/01309/FUL
- Lead case reference
- Not recorded
- Planning authority
- Braintree District Council
- Planning authority code
- E07000067
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 8. Failed to give notice of its decision within the appropriate period (usually 8 weeks) on an application for permission or approval
- Appeal reason
- Failure
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.24 hectares
- Floor space
- 165 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 28 October 2020
- Valid date
- 30 November 2020
- Start date
- 27 January 2021
- Planning authority decision date
- Not recorded
- Appeal decision date
- 6 September 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 2689
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25