Appeal 3262723
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
, without planning permission erection of timber enclosure comprising canopy and timber panels.
Section 02
Decision
The appeal is dismissed and the enforcement notice is upheld.
Section 03
Preliminary Matters
I sought clarification from the Council as to whether it intended to submit evidence that was referred to in its enforcement report but not provided with representations on the appeal. I subsequently received a number of photographs, a Planning Contravention Notice1, and an email from a neighbouring resident. The appellant was offered opportunity to comment. No response was received.
The appellant and local residents have made representations regarding the need for and effects of the alleged timber enclosure; the appellant has also offered to modify the structure to remedy any harm it may cause. However, I am unable to consider the merits of the development because the appellant has not made an appeal on ground (a), which is that planning permission should be granted for what is alleged in the notice.
The appellant suggests that what took place on the site amounted to the repair of an existing structure rather than erection of a timber enclosure. While that argument could amount to a hidden appeal on ground (b) and/or (c) – that what is alleged did not occur or was not in breach of planning control – I find in this case that the question of what happened is best addressed in the context of time and ground (d), as discussed below. 1 Dated 30 October 2019
Section 04
The Appeal on Ground (d)
Ground (d) is that, on the date that the enforcement notice was issued, it was too late for the Council to take enforcement action. The onus is on the appellant to demonstrate that the operations involved in the erection of the alleged timber enclosure comprising canopy and timber panels were substantially completed, on the balance of probabilities, four years before the date of issue of the notice. The material date is 29 September 20162.
The Council accepts the appellant’s claim that, more than four years ago, there was a canopy structure where the alleged enclosure now stands. However, the appellant does not dispute that ‘repairs’ were carried out less than four years before the notice was issued. The question, then, is whether the repair works were significant enough to amount to the ‘erection of a timber enclosure’ as alleged as a matter of fact and degree.
The appellant’s case is that, when he took over the ground floor business at No [site address] in January 2017, the canopy at the rear of the shop was in a hazardous state of repair and had to be brought up to a sound and acceptable condition. He took advice from a roofer who then lived in the same building, and, says that the structure had the same footprint and height as before and after the repairs were carried out.
The appellant’s neighbours and customers have also made representations to the effect that a structure has been in place for over 10 years with the same size, shape, footprint and appearance. For example, it is suggested in an email from the roofer that the roof was simply changed for one that is water-tight and the building is the same now as it was prior to the work in January 2017.
However, there is no other evidence as to what works were undertaken to ‘repair’ the pre-existing structure. That is important because a building may be completely new even if it is identical to one that was previously on the land. Moreover, works to an existing building may be significant enough – as a matter of fact and degree – that the outcome is construction of a new building. Yet the appellant has not given me any precise or unambiguous evidence as to which parts of the enclosure, if any, were on the site more than four years ago.
The Council states that they were informed in 2017 that a timber canopy was under construction. The Council has provided case notes written by an Officer at that time, and they refer to the site owner telling the Council the canopy replaced an existing smaller canopy. The Council says that the alleged enclosure is indeed bigger than the pre-existing canopy - although the footprint and height are the same - because the new roof is flat rather than sloped thereby having a greater volume.
Photographs submitted by the Council confirm that the roof of the pre-existing structure initially sloped down at a steep angle and then at a more moderate angle from the main back wall of the host building. In contrast, the roof of the alleged enclosure projects out on a continuous plane from the rear elevation of the main building.
Looking at all of the evidence before me, it is plain that works were carried out in 2017 which resulted in changes to the form of the roof and volume of the enclosure attached to the main building. The appellant has not demonstrated 2 s171B(1) of the Town and Country Planning Act 1990 that, on the balance of probabilities, the works did not amount to the erection of an enclosure as alleged – or, therefore, that the development was substantially completed by 29 September 2016.
I conclude that it has not been shown that, on the date that the enforcement notice was issued, it was too late for the Council to take enforcement action. The appeal on ground (d) does not succeed.
Section 05
The Appeal on Ground (g)
The ground (g) appeal is that the six months given to comply with the notice is too short. However, a period of 18 months, as suggested by the appellant, is disproportionate having regard to the nature and extent of the works, and, as such, is unjustified.
I accept that it might take longer than usual to procure any necessary services or support from a builder in the circumstances created by the COVID-19 pandemic. Nevertheless, a period of six months would be a proportionate response to the breach of planning control and balance any issues arising from the current pandemic.
The appeal on ground (g) fails.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 263No official casework-database value to compare
- Extracted decision date · page 1
- 1 October 2021Matches the official casework database
- Extracted site visit dates
- 10 August 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3262723
- Application reference
- Not recorded
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Hammersmith and Fulham
- Planning authority code
- E09000013
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Enforcement Notice
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- LPA's service of an Enforcement Notice
- Appeal reason
- Not recorded
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Notice upheld
- Decision category
- Dismissed
- Received date
- 6 November 2020
- Valid date
- 13 November 2020
- Start date
- 8 January 2021
- Planning authority decision date
- Not recorded
- Appeal decision date
- 1 October 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- 3
- Enforcement grounds
- b,d,g
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 4076
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25