Appeal 3263527

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

engineering operations comprising the ongoing formation (through movement of material such as soil, rubble, rocky fill and loose rock, its deposit, compaction and moulding) of an artificial, man- made platform feature without the benefit of planning permission.

  1. Section 02

    Decision

    It is directed that the enforcement notice is varied by: The deletion of the words “Remove all material deposited on the Land since 2015 and now comprising the platform feature described above, and reinstate the Land to the contour levels in place prior to the deposition of the material, resulting in the final landform of the Land blending with that of the surrounding land” and substitute the words “Remove all material deposited on the Land since 2015 and now comprising the platform feature described above, and reinstate the Land to the contour levels and condition in place prior to the deposition of the material” of requirement (ii); and The deletion of requirements (iii), (iv) and (v) in paragraph 5: [name] DO. Subject to these variations, the appeal is dismissed, and the enforcement notice is upheld.

  2. Section 03

    Ground (b) appeal

    This ground is that engineering operations comprising the ongoing formation of an artificial, man-made platform feature has not in fact occurred. The burden of proof is on the appellant and the test is the balance of probability.

    The appellant claims that the soil, rubble, rocky fill and loose rock has been generated by the implementation of 2 planning permissions and complying with the approved landscaping scheme. He goes on to claim that the material excavated could not be removed from the property as that would constitute a mining operation, for which planning permission has not been granted. Rather than creating stockpiles of materials, the appellant advises that he has temporarily stored the materials along the access track that leads between the higher and lower land in his ownership.

    There is no dispute that the deposited material has been generated by the implementation and compliance with the 2 planning permissions. It would be reasonable to assume that excavated stone and soil, waste materials and debris associated with the implementation and compliance with the 2 planning permissions would be stored ready for disposal or re-use. The material has instead been deposited, moulded and compacted to form the platform feature.

    The appellant alleges that the deposited material is being stored “immediately adjacent to the historic and existing access route leading down to lower land”1. I saw during my site visit that the artificial, man-made platform feature has encompassed the access route referred to by the appellant, and it provides a relatively smooth, shallow graduated surface leading down into the lower field. Regardless of whether the artificial, man-made platform is temporary or not, the materials deposited have been moulded and compacted to provide access into the lower field. I therefore find that the materials are not just being stored, as the appellant claims.

    It is clear from the evidence that the amount of material deposited is substantial, and it would be reasonable to assume that heavy machinery would have been required to deposit, mould and compact the material to form the artificial, man-made platform. Such work would constitute an engineering operation, which s55(1) of the 1990 Act confirms is development requiring planning permission. I have not been made aware that planning permission has been granted for this development or that it was included in either of the 2 planning permissions that generated the material. Furthermore, the appellant has not claimed that the artificial, man-made platform benefitted from planning permission granted under Article 3(1) of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Even if he had, there is insufficient evidence before me to determine whether the works could have been permitted development.

    For the reasons given above, I find that the matters alleged have occurred and the appeal on ground (b) fails.

  3. Section 04

    Ground (f) appeal

    Having regard to the requirements set out in section 5 of the notice, its purpose is to remedy the breach of planning control. To succeed on this ground, the appellant must show that the requirements of the notice exceed what is necessary to remedy the breach.

    The appellant argues that step (ii), requiring the removal of “all material deposited on the Land since 2015” is ambiguous and unclear as to what would be required, given that the material cannot be removed from the holding. However, step (ii) states “Remove all material deposited on the Land since 2015 and now comprising the platform feature [my emphasis]”. Furthermore, the Land edged red on the plan attached to the notice does not encompass the extent of the appellant’s land holding. As such, the deposited material recovered from compliance with step (ii), could be stored elsewhere on the holding until the excavated material can be re-used on the holding and arrangements can be made for the disposal of the waste material. In terms of the reinstatement of the land contours, the appellant is best placed to know what these were. I find step (ii) to not be ambiguous and it is clear what the appellant is required to do.

    S173(4)(a) of the 1990 Act states that the breach of planning control can be remedied by “restoring the land to its condition before the breach took place”, amongst other things. Steps (iii), (iv) and (v) impose a specific planting plan for the Land and a long-term maintenance scheme for that planting. These 1 Page 2 of the appellant’s Grounds and Facts document steps go beyond what is required to restore the Land to its condition before the breach took place and I shall delete them.

    While step (ii) secures the reinstatement of the Land’s former contours, it should be varied to include returning the Land to its condition before the breach took place. Also, for clarity, it is unnecessary for step (ii) to include the words “resulting in the final landform of the Land blending with that of the surrounding land”. Given the minor nature of these variations, it would be no more onerous than those first issued, and no injustice would be caused. Accordingly, the appeal on ground (f) succeeds in so far as the notice is varied.

  4. Section 05

    Ground (g) appeal

    Compliance with the varied notice requires potentially complex operations to be carried out. The appellant claims that a time constraint should not be imposed as discussions need to take place with the Council to determine where the deposited material can be moved to.

    S173(9) requires the notice to specify the period at the end of which any steps are required to have been taken or any activities are required to have ceased. The compliance period for step (i) is one day, which given the nature of the operations, is reasonable. While there may be a need to bring specialist equipment to site in order to comply with step (ii), 9 months does not fall short of what is reasonable to secure the removal of material deposited on the Land since 2015 that comprises the platform feature, and the reinstatement of the Land to its former contour levels and condition prior to the breach of planning control occurred. This period is also sufficient to accommodate any discussion between the appeal parties. On this basis, the appeal fails on ground (g).

  5. Section 06

    Overall conclusion

    From the evidence before me, I conclude that the alleged breach of planning control set out in the enforcement notice is correct. The appeal on ground (b) fails. For the reasons given above, requirement 2 shall be varied and requirements (iii), (iv) and (v) shall be deleted. The periods of compliance associated with requirements (i) and (ii) are however reasonable. I shall vary the enforcement notice prior to upholding it. The appeal on ground (f) succeeds to that extent.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 294No official casework-database value to compare
    Extracted decision date · page 1
    2 July 2021Matches the official casework database
    Extracted site visit dates
    25 May 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3263527
Application reference
Not recorded
Lead case reference
Not recorded
Planning authority
Peak District
Planning authority code
E26000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Enforcement Notice
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
LPA's service of an Enforcement Notice
Appeal reason
Not recorded
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Notice varied and upheld
Decision category
Dismissed
Received date
19 November 2020
Valid date
19 November 2020
Start date
18 January 2021
Planning authority decision date
Not recorded
Appeal decision date
2 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
3
Enforcement grounds
b,f,g

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
94
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
20 August 2026 at 16:25