Appeal 3263527
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
engineering operations comprising the ongoing formation (through movement of material such as soil, rubble, rocky fill and loose rock, its deposit, compaction and moulding) of an artificial, man- made platform feature without the benefit of planning permission.
Section 02
Decision
It is directed that the enforcement notice is varied by: The deletion of the words “Remove all material deposited on the Land since 2015 and now comprising the platform feature described above, and reinstate the Land to the contour levels in place prior to the deposition of the material, resulting in the final landform of the Land blending with that of the surrounding land” and substitute the words “Remove all material deposited on the Land since 2015 and now comprising the platform feature described above, and reinstate the Land to the contour levels and condition in place prior to the deposition of the material” of requirement (ii); and The deletion of requirements (iii), (iv) and (v) in paragraph 5: [name] DO. Subject to these variations, the appeal is dismissed, and the enforcement notice is upheld.
Section 03
Ground (b) appeal
This ground is that engineering operations comprising the ongoing formation of an artificial, man-made platform feature has not in fact occurred. The burden of proof is on the appellant and the test is the balance of probability.
The appellant claims that the soil, rubble, rocky fill and loose rock has been generated by the implementation of 2 planning permissions and complying with the approved landscaping scheme. He goes on to claim that the material excavated could not be removed from the property as that would constitute a mining operation, for which planning permission has not been granted. Rather than creating stockpiles of materials, the appellant advises that he has temporarily stored the materials along the access track that leads between the higher and lower land in his ownership.
There is no dispute that the deposited material has been generated by the implementation and compliance with the 2 planning permissions. It would be reasonable to assume that excavated stone and soil, waste materials and debris associated with the implementation and compliance with the 2 planning permissions would be stored ready for disposal or re-use. The material has instead been deposited, moulded and compacted to form the platform feature.
The appellant alleges that the deposited material is being stored “immediately adjacent to the historic and existing access route leading down to lower land”1. I saw during my site visit that the artificial, man-made platform feature has encompassed the access route referred to by the appellant, and it provides a relatively smooth, shallow graduated surface leading down into the lower field. Regardless of whether the artificial, man-made platform is temporary or not, the materials deposited have been moulded and compacted to provide access into the lower field. I therefore find that the materials are not just being stored, as the appellant claims.
It is clear from the evidence that the amount of material deposited is substantial, and it would be reasonable to assume that heavy machinery would have been required to deposit, mould and compact the material to form the artificial, man-made platform. Such work would constitute an engineering operation, which s55(1) of the 1990 Act confirms is development requiring planning permission. I have not been made aware that planning permission has been granted for this development or that it was included in either of the 2 planning permissions that generated the material. Furthermore, the appellant has not claimed that the artificial, man-made platform benefitted from planning permission granted under Article 3(1) of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Even if he had, there is insufficient evidence before me to determine whether the works could have been permitted development.
For the reasons given above, I find that the matters alleged have occurred and the appeal on ground (b) fails.
Section 04
Ground (f) appeal
Having regard to the requirements set out in section 5 of the notice, its purpose is to remedy the breach of planning control. To succeed on this ground, the appellant must show that the requirements of the notice exceed what is necessary to remedy the breach.
The appellant argues that step (ii), requiring the removal of “all material deposited on the Land since 2015” is ambiguous and unclear as to what would be required, given that the material cannot be removed from the holding. However, step (ii) states “Remove all material deposited on the Land since 2015 and now comprising the platform feature [my emphasis]”. Furthermore, the Land edged red on the plan attached to the notice does not encompass the extent of the appellant’s land holding. As such, the deposited material recovered from compliance with step (ii), could be stored elsewhere on the holding until the excavated material can be re-used on the holding and arrangements can be made for the disposal of the waste material. In terms of the reinstatement of the land contours, the appellant is best placed to know what these were. I find step (ii) to not be ambiguous and it is clear what the appellant is required to do.
S173(4)(a) of the 1990 Act states that the breach of planning control can be remedied by “restoring the land to its condition before the breach took place”, amongst other things. Steps (iii), (iv) and (v) impose a specific planting plan for the Land and a long-term maintenance scheme for that planting. These 1 Page 2 of the appellant’s Grounds and Facts document steps go beyond what is required to restore the Land to its condition before the breach took place and I shall delete them.
While step (ii) secures the reinstatement of the Land’s former contours, it should be varied to include returning the Land to its condition before the breach took place. Also, for clarity, it is unnecessary for step (ii) to include the words “resulting in the final landform of the Land blending with that of the surrounding land”. Given the minor nature of these variations, it would be no more onerous than those first issued, and no injustice would be caused. Accordingly, the appeal on ground (f) succeeds in so far as the notice is varied.
Section 05
Ground (g) appeal
Compliance with the varied notice requires potentially complex operations to be carried out. The appellant claims that a time constraint should not be imposed as discussions need to take place with the Council to determine where the deposited material can be moved to.
S173(9) requires the notice to specify the period at the end of which any steps are required to have been taken or any activities are required to have ceased. The compliance period for step (i) is one day, which given the nature of the operations, is reasonable. While there may be a need to bring specialist equipment to site in order to comply with step (ii), 9 months does not fall short of what is reasonable to secure the removal of material deposited on the Land since 2015 that comprises the platform feature, and the reinstatement of the Land to its former contour levels and condition prior to the breach of planning control occurred. This period is also sufficient to accommodate any discussion between the appeal parties. On this basis, the appeal fails on ground (g).
Section 06
Overall conclusion
From the evidence before me, I conclude that the alleged breach of planning control set out in the enforcement notice is correct. The appeal on ground (b) fails. For the reasons given above, requirement 2 shall be varied and requirements (iii), (iv) and (v) shall be deleted. The periods of compliance associated with requirements (i) and (ii) are however reasonable. I shall vary the enforcement notice prior to upholding it. The appeal on ground (f) succeeds to that extent.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 294No official casework-database value to compare
- Extracted decision date · page 1
- 2 July 2021Matches the official casework database
- Extracted site visit dates
- 25 May 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3263527
- Application reference
- Not recorded
- Lead case reference
- Not recorded
- Planning authority
- Peak District
- Planning authority code
- E26000006
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Enforcement Notice
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- LPA's service of an Enforcement Notice
- Appeal reason
- Not recorded
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Notice varied and upheld
- Decision category
- Dismissed
- Received date
- 19 November 2020
- Valid date
- 19 November 2020
- Start date
- 18 January 2021
- Planning authority decision date
- Not recorded
- Appeal decision date
- 2 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- 3
- Enforcement grounds
- b,f,g
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 94
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25