Appeal 3263607
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Use of existing structure in rear garden for shisha smoking and associated alterations.
Section 02
Decision
The appeal is allowed and planning permission is granted for Use of structure in rear garden for shisha smoking and associated alterations at [site address] in accordance with the terms of application, Ref 2020/01318/FUL, dated 27 May 2020, subject to the attached schedule of conditions.
Section 03
[name]
Since the time the appeal was submitted, the Council has granted planning permission to enlarge the size of the undercover outdoor drinking pergola the subject of this appeal, including other alterations. These works appear to be complete. However, I have made my assessment of the proposal on the basis of the structure shown on the drawings and details submitted with the appeal.
Section 04
Main Issue
The main issue is the effect of the proposal on the living conditions of local residents.
Section 05
Reasons
[site address] is an imposing three storey building with public house use on the ground floor and located on [address] in Hammersmith. Its large beer garden area is a typical outside drinking and eating space with tables and chairs located within two covered pergolas, and additional seating within the central core of the space. It is positioned close to residential properties although high external walls surround the site.
The only space to be used as the shisha smoking area is the pergola that contains a bar within, and currently operates as a semi-enclosed smoking area.
The noise impact assessment was undertaken over a consecutive two day period during February 2020 and assessed the background noise levels at that time, and the predicted levels of noise associated with the shisha area based on it being occupied by up to fifteen people, with a model of eight people talking simultaneously as a worse-case scenario. It concluded that the proposal would not lead to harm arising to the nearest noise sensitive receptor.
As pointed to by the Council, there would be an expectation that the background noise levels would be greater in the summer months particularly due to increased activity in the beer garden. However, in that case, there would be a very likely expectation that noise associated with the shisha lounge would be absorbed into the higher background noise levels.
Also, there is no evidence provided by the Council to demonstrate there is a limitation to the number of people who can use the beer garden area at any one time. The numbers of customers using the shisha area can be controlled by way of condition.
Overall, I am satisfied that the outcome of the noise assessment is robust and the effect on the living conditions of local residents would not be harmed as a consequence of the proposal, in this regard.
The structure has previously been used as an unrestricted smoking shelter and odour from cigarette smoke from customers would have been dispersed into the atmosphere. The smoking of shisha pipes as an activity would also generate odour into the atmosphere, usually of the fragrant variety. The submitted odour assessment has been undertaken with a considerably larger number of users to the numbers intended to use the space. It would therefore represent a worst-case scenario.
[name] appreciate personal smell sensitivity is individual to each subject, given the nature of residential occupants close to the appeal site, the odour assessment concludes that the effects of odour from the use, at the identified sensitive receptor locations, to be negligible. There is nothing before me to contradict these findings. I am of the view that its associated odours would lead to no detrimental harm to the living conditions of local occupiers.
To conclude, I have found that the proposal would not lead to an intensification of the use of the existing beer garden and that noise and odour levels would lead to no detriment to the living conditions of local residents. It would therefore meet the objectives of the Hammersmith and Fulham Local Plan 2018 Policies CC11 and CC13 in their combined aims for development to protect amenity from polluting uses. However, with regards to Policy HO11, I find no direct relevance to this policy as it relates to new housing development.
Section 06
Conditions
I have considered planning conditions in light of the Planning Practice Guidance and Paragraph 55 of the National Planning Policy Framework. In addition to the standard time limit condition, a condition relating to the approved plans is necessary to provide certainty.
It would not be appropriate to impose a two years temporary permission for the proposal as I have found that it would be an acceptable permanent use. Further, a suggested condition in relation to no alterations to the external appearance of the public house building, or alterations to the existing pergolas including no additional plant, is not relevant as this has no bearing on the proposal before me.
The number of customers occupying the area can be limited to fifteen individuals due to the size of the space and the conclusions drawn from the assessments undertaken, in the interest of protecting the living conditions of local residents.
The recommended hours of use by the Council are unreasonably restrictive given the existing hours of use of the beer garden, its unrestricted numbers of patrons, and the outcomes of the submitted assessments. Therefore, as it has been confirmed by the appellant that the beer garden closes one hour before the main public house at 23:00, I therefore impose the same closing hours to the shisha area with an opening time of 12:00, as suggested by the appellant.
Section 07
Other Matters
Objectors to the proposal raise a number of other concerns. Issues regarding a raised platform within the beer garden, and that a structure can be seen from outside the site and from residential properties, are not within my scope to comment upon. Neither is other odours generated at the site and complaints regarding existing noise levels. Nor am I able to comment on whether or not shisha smoking is considered a ‘pub recreation’.
The site may be close to the boundary with a designated Conservation Area, however there is nothing before me to suggest that the proposal would lead to harm arising to its character or appearance. Further, there is no evidence to bring me to the conclusion that pollution from traffic and smoking in the area is at a maximum level, or the bearing this would have on the proposal before me.
Despite an objector’s concerns relating to the accuracy of the location of the closest residential properties, nonetheless, I am satisfied that I have seen the site and its surroundings during my site visit.
There is nothing before me to suggest that shisha smoking would encourage unhealthy behaviours within individuals, nor is there any evidence provided to say that its proximity to education or nursery centres would be problematic.
A letter of representation explains that the premises is intended to be changed into a different use. This would be for the Council to investigate under the circumstances.
The appellant raises complaints regarding the Council’s service. This should be in the first place directed to them, as is not within my remit to comment.
Section 08
Conclusion
There are no material considerations that indicate the application should be determined other than in accordance with the development plan. For the reasons given above, I therefore conclude that the appeal should be allowed.
Section 09
Schedule of Conditions
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: 1:1250 site location plan, Dwg. No:211-PROP-02 [name].
No more than 15 customers shall occupy the shisha area hereby approved at any one time.
The hours of use of the shisha area shall be restricted to between 12:00 and 23:00 Monday to Sunday, including Public Holidays. End of Schedule
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 296No official casework-database value to compare
- Extracted decision date · page 1
- 6 July 2021Matches the official casework database
- Extracted site visit dates
- 24 May 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3263607
- Application reference
- 2020/01318/FUL
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Hammersmith and Fulham
- Planning authority code
- E09000013
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 880 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 20 November 2020
- Valid date
- 11 December 2020
- Start date
- 2 February 2021
- Planning authority decision date
- 27 August 2020
- Appeal decision date
- 6 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 262
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25