Appeal 3264189
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
[name] rear extension and 1 nr dormer
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
The name of the appellant is as shown on the application form. Whilst the appeal form is in the name of the appellant’s agent, I note the email correspondence to confirm both the agent and appellant’s names. As there is no change from either of these and no objection from either party I consider it appropriate to use the applicant’s name as shown on the original application form.
I note that the plans were amended during the consideration of the planning application. The description of proposed development in the banner heading above is taken from the appeal form and decision notice as it more accurately reflects the plans before me, and those listed in the Council’s decision notice, than that shown on the application form. I have therefore made my decision on the basis of these plans.
The proposals include the insertion of a dormer roof extension to the rear of the property. The Council raises no concern regarding this element of the development, and there are no references to this in the appellant’s documents and as such I shall not consider this matter further.
Section 04
Main Issue
The main issue is the effect on the character and appearance of the area, with particular reference to the relationship with protected trees on the site.
Section 05
Reasons
The appeal site is a detached dwelling located at the end of [address], a residential cul-de-sac. A number of mature trees are located in the garden, within the site boundaries, to the south and east of the dwelling. The trees are protected by a Tree Preservation Order (TPO). These are mainly limes, with an ash and oak, and at my site visit I was able to see that the lime trees appear to form two lines of trees leading off beyond the appeal site to both the north-west and south-west. These trees are uniform in placing and general height and age, resulting in an important feature which contributes to the character and appearance of the area. The dwellings along [address] appear to have these mature trees in their gardens, with a defined line of trees visible as seen from the rear gardens, as well as the street. I was also able to see that there were recreation fields and footpaths directly to the rear of these dwellings.
Section 197 of the Town and Country Planning Act 1990 places a duty on Councils to ensure, whenever it is appropriate, that in granting planning permission for any development, adequate provision is made, by the imposition of conditions, for the preservation and planting of trees.
The appeal dwelling includes a patio area and detached garage building, and I was able to verify at my site visit that two of the lime trees are close to the existing dwelling and patio. The garden slopes gently downhill from the house and street level to the rear boundary. The development would be located to the rear of the dwelling, providing a single storey extension which would span the width of the dwelling.
The development would bring the built form closer to the existing trees in the garden. Both parties agree that the majority of the dwelling and its garden is located within the entirety of the root protection area of all trees, and those in the TPO. The Tree Survey confirms that “BS5837 (Section 3.7) 1 defines the RPA as a ‘layout design tool indicating the minimum area around a tree deemed to contain sufficient roots and rooting volume to maintain the tree’s viability, and where the protection of the roots and soil structure is treated as a priority’. In other words, the RPA represents the minimum area around each tree in which the ground should remain largely undisturbed.”
In particular, the development would be close to T3, indicated as a [name] tree in the tree survey report. [name] is described as “trees of moderate quality with an estimated remaining life expectancy of at least 20 years”. The tree survey report identifies T3 as a lime tree, described as...”Large, prominent tree. Large dead wood developing in crown which otherwise has good vitality. Upright form. Cavities in low pruning wounds do not appear significant to stability, but have habitat potential. Dense epicormic growth at base restricted inspection.” The report goes on to confirm that the tree has an expected retention span of 20+ years. The Council does not dispute the categorisation. It is proposed to remove the dead wood and epicormic growths from T3. 1 [name] 5837 2012 ‘Trees in Relation to design, demolition and construction – Recommendations’
The construction would require some excavation work to create the extension. The Council has raised concern about the lack of information with regard to specialist construction methods, mitigation and maintenance. In addition, the Council raise concern that, notwithstanding specialist excavation and construction methods, the proposal would increase the barriers to the root systems of the surrounding trees and would have a long-term detrimental impact upon tree health.
In the appellant’s grounds of appeal, it is stated that trial excavation would take place by hand, with small piles providing the foundation for the extension. This is confirmed by the design in the application documents, showing a suspended concrete slab over the existing patio and soil level. I acknowledge that the appeal site is at a location where there is the existing patio area, which may result in existing compaction, however I am not persuaded that this sufficiently mitigates for the potential harm to the root systems of the trees to sufficiently justify building within the RPA.
A number of protection measures are recommended including manual excavation, ground protection, and protective barriers. It is confirmed that the working area and access would be undertaken from the existing patio area, which would be fenced with tree protection fencing. Nevertheless, given the location within the RPA, I am not provided with the evidence to demonstrate that the construction and the extension would not cause long-term harm to the TPO trees.
Tree T2, also a lime and close to the dwelling, is proposed to have its epicormic growths removed and height reduced by approximately 6m. The Council ascertains that this work to T2 is unnecessary for the development to go ahead, and as such would require a separate TPO consent for these works to that particular tree. Even so, the proposed reduction of the T2 by 6m would significantly alter the appearance of this tree, and thus create a change in the uniform line of trees as seen from the nearby streets and footpaths.
Notwithstanding, it is possible that, with the development in place, the overshadowing and safety and maintenance issues that could arise may lead to pressure to cut back or remove the preserved tree in the longer term, as well to T3. I acknowledge the appeal documents show possible solutions to help with ongoing maintenance, such as bristle guards, however this does not overcome the concerns raised above.
Due to the heights of the trees and changes in the land levels at this particular area, the protected trees remain prominent in the local area. I have considered the effect of the development on the root protection area (RPA) of the protected trees during construction as well as afterwards. Whilst the proposed development would be located at the site of the existing patio area, the development would remain in the RPA.
I am not persuaded that the proposed development can afford the necessary protection to the protected trees both during construction and post construction due to its close proximity and interference in the RPA. I have considered the option of a condition to mitigate for the identified harm through protection measures during construction or replacement planting. However, I am not convinced that the potential harm to the RPA can be avoided, nor that there is sufficient space within the appeal site for any meaningful replacement planting and as such I am not persuaded that the development can be made acceptable through the use of a condition.
In conclusion, whilst I have no concerns with regard to the appearance of the proposed extension, I nonetheless find that there is conflict with Policies N6 and DG1 of the Local Plan2 which expect developments to (amongst other things) respect the character and appearance of the local area including avoiding the loss of important features which contribute to the character of the area and; to protect trees which contribute towards local amenity from any adverse impacts.
Section 06
Conclusion
For the above reasons, and having had regard to all other matters raised, I conclude that the appeal should be dismissed
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 171No official casework-database value to compare
- Extracted decision date · page 1
- 13 July 2021Matches the official casework database
- Extracted site visit dates
- 12 March 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3264189
- Application reference
- 20/01519/FULL
- Lead case reference
- Not recorded
- Planning authority
- Royal Borough of Windsor and Maidenhead
- Planning authority code
- E06000040
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 80 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 1 December 2020
- Valid date
- 9 December 2020
- Start date
- 21 January 2021
- Planning authority decision date
- 28 October 2020
- Appeal decision date
- 13 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 595
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21