Appeal 3265279
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘Alterations and improvements to the existing two storey dwelling, formation of a private drive and the erection of three bungalows with associated parking facilities’.
Section 02
Decision
The appeal is allowed and planning permission is granted for alterations and improvements to the existing two storey dwelling, formation of a private drive and the erection of three bungalows with associated parking facilities at [address], [site address] , in accordance with the terms of the application, Ref: 19/01937/FUL, dated 12 December 2019, subject to the conditions set out in the attached schedule.
Section 03
Preliminary Matters
I have taken the description of development from the decision notice and appeal form because the wording used reflects the amendments made to the proposal during the Council’s assessment of the planning application.
Since the Council issued its decision it has adopted Section 1 of the Tendring Local Plan 2013 – 2033 (TLP), which contains several strategic policies. There is nothing of substance before me to indicate this change should have a material bearing on the outcome of this appeal.
Section 04
Main Issue
The main issue in this appeal is the effect of the proposed development on the character and appearance of the area.
Section 05
Reasons
The appeal site encompasses a large stable/store, a residential property known as [address] and a small paddock flanked by hedges and trees. The existing dwelling is set back from the road behind a front garden and is situated in a discernible building line. The properties in this building line front onto [site address] and have residential gardens to the rear. This results in a frontage pattern of development with buildings framing the street.
The appeal scheme would result in three new homes being constructed behind the building line and in a backland location. This would jar with the clear frontage pattern of development along [site address] . In addition, there would be a long access road and the plots would be relatively small, failing to replicate the length or width of those in [site address] or [address]. In this respect, they would be relatively cramped when compared to others nearby. However, for reasons I go into, this would be hard to perceive and the plots would not be cramped in isolation due to the provision of adequate amenity space and parking.
The development in [address] is arranged in depth but this is a comprehensive addition accessed from a new road which the buildings all address. The presence of this development does not justify the appeal scheme.
Policy HG13 of the Tendring Local Plan 2007 specifically relates to backland development and states that this form of proposal will only be permitted where, amongst other things, it would be within a defined settlement and does not involve a tandem arrangement. The proposal would fail to meet both of these requirements and is therefore at odds with Policy HG13.
However, the Council have advised that the settlement boundary of the village is likely to be revised through the emerging local plan. The draft boundary would be extended to include the appeal site due, no doubt, to its location within the settlement as it is experienced on the ground. I therefore share the view of the Council that the location of the development outside the settlement boundary is a matter of limited weight against the proposal in this instance.
Although tandem in arrangement, there is no blanket ban on this type of development in national policy or guidance. Moreover, the proposal has been conceived so that the departure from the pattern of development would not be strident and would actually be quite subtle. In particular, the three dwellings would be modestly sized bungalows set back from the road. As a result, it would only be possible to achieve glimpsed views of the structures from public vantage points and mainly from directly outside the site.
Furthermore, there is already development in the site in the form of a large stable, which spans most of the width of the paddock and is of a similar size and location to where Plot 1 would be. The retention of existing boundary landscaping would also soften the presence of the development in views from nearby properties, which are either some distance away or with a reduced outlook due to a single storey scale. Retaining the existing boundary landscaping would also add a sense of maturity to the development.
The existing mature hawthorn hedge along the eastern boundary of the site, which from [name] plans appears to be outside the appellant’s ownership, would be retained and protected during construction as would the hedge adjacent to Artington. The lack of any objection from the Council’s Tree & [name] supports these findings.
The effect on the street scene of [site address] would be limited because the existing property, which would be retained, would screen much of the development. In addition, mature trees of amenity value would not be felled, and a new access would not have to be constructed because the existing long driveway to the stables could be extended and modified. Views along the access would be softened by positioning landscaping to the south of Plot 1 and through the retention of most of the hedge with Artington. Removing the wall along the site frontage to accommodate visibility splays would benefit the street scene, especially if replaced with soft landscaping.
There is a public footpath to the north of the site, and it is proposed to erect a fence along this boundary. That would result in a hard interface and the loss of soft landscaping, which if retained would screen much of the development in views from the footpath. Thus, a landscaping condition could be imposed to require approval of the details of the northern boundary of the development. This would enable further consideration to be given to retaining the existing landscaping and providing a planted interface with the public footpath.
In conclusion, the proposed development would be at odds with Policy HG13 because it would be located outside the settlement boundary and would be a form of backland tandem development. However, for the reasons given, the proposal overall would not harm the character and appearance of the area. It would therefore adhere to the underlying aims of the policy as well as the aspirations in the National Planning Policy Framework that development is sympathetic to local character. As a result, the conflict with Policy HG13 carries only limited weight against the appeal scheme in this instance.
Policy LP8 of the emerging Tendring District Local Plan 2013 – 2033 and Beyond has similar requirements to Policy HG13 in that it seeks to avoid tandem development. Consequently, there would be conflict with this aim and this weighs against the scheme as a material consideration. Nevertheless, the proposal overall would not harm the character and appearance of the area despite the tandem arrangement and therefore the conflict with emerging Policy LP8 also carries only limited weight.
Section 06
Other Matters
There would be adequate separation distance between the new and existing properties to ensure the new occupiers would not cause any harmful noise and disturbance, including from vehicle headlights. For similar reasons the proposal would not result in a harmful loss of light or outlook. I therefore share the view of the Council that the proposal would maintain and provide good living
Section 07
conditions.
The Local Highway Authority are satisfied the proposal would not prejudice highway safety and the balance of the evidence before me does not justify a departure from this expert view. Each dwelling would have two parking spaces, and this would be adequate given the number of bedrooms proposed.
I have seen nothing of substance, such as an evidenced based study, to demonstrate there are insufficient school places or that there is inadequate sewerage capacity or infrastructure generally. Surface water disposal would be primarily be dealt with through the building regulations in this instance. The appeal site is a closely grazed paddock and a well-managed domestic garden. I therefore share the view of the Council that there is unlikely to be harm to protected species. The existing hedgerows are the features most likely to support wildlife and they would be retained. Nothing of substance is before me to demonstrate the proposal would result in surface water flooding.
Given my findings and the specific nature of the site and proposal, the approval of the appeal scheme would not set an undesirable precedent. The safe demolition of the apparently asbestos clad stable would be secured through other legislation. There is nothing of substance before me to suggest that an implication of the appeal scheme would be a fall in house prices to the extent and scale that this would be a matter of public interest. There is no obligation in planning policy for the appellant to demonstrate a need for the proposal or to deliver the housing below the market value.
The delivery of three modest bungalows would support housing supply and choice, but only to a limited extent and at a point in time when the Council are able to demonstrate a five-year housing land supply. Similarly, the construction and subsequent occupation of the dwellings would provide modest support to the construction industry and the vitality of a rural community. Overall, these would be benefits of limited weight in favour of the appeal scheme.
A proposal should be determined in accordance with the development plan unless material considerations indicate otherwise. In this instance, the benefits of the proposal, although small in scope, would be sufficient to outweigh the limited conflict with the development plan.
Section 08
Conditions and Planning Obligation
I have considered the advice in the Planning Practice Guide and the conditions suggested by the Council. It is necessary in the interests of certainty, minimising surface water flooding and preserving living conditions and the character and appearance of the area, to ensure the development is undertaken in accordance with the submitted drawings. For similar reasons a landscaping scheme and tree and hedge protection is required. I have however secured landscaping and an [name] (AMS) as standalone conditions in the interests of precision and enforceability and because the submitted AMS relates to the proposal before it was amended. A revised AMS could also address the presence of an adjoining Holly tree in the garden of Artington. The landscaping scheme would need to address the surface of the driveway as an element of hard landscaping. The Council would be able to assess whether a gravel surface would be appropriate given the noise that could occur from vehicles passing over it. The Council can also ensure that surface water from hard surfaces is properly addressed.
To secure highway safety it is necessary to impose conditions relating to visibility, turning, the width of the drive, the design of the access, surface water and the size of the garages. With garages of this size it is unnecessary to secure separate cycle parking. It may be that the provision of visibility splays would require work to land outside the appellant’s control, but there is nothing before me to demonstrate there is no prospect of the appellant being able to reach agreement with the occupants of Artington and use their land to provide the required splays if necessary. A travel information pack is necessary in the interests of promoting sustainable transport.
Given the proximity of neighbouring dwellings, some of which are occupied by elderly residents, it is necessary to secure a construction management plan to minimise the disturbance that may be caused. I have altered the trigger point to avoid the need for a pre commencement condition. In this respect, the demolition works would be brief and would have limited effects. It is necessary to remove permitted development rights for roof extensions in the interests of safeguarding living conditions.
As the competent authority, I have carefully considered the Council’s initial Habitat Regulations Assessment. The appeal site is located within a zone of influence placed around relevant European sites as established in the [name] and [name] ([name]). There is no dispute that the population growth resulting from new housing within this zone would likely result in an increase in harmful recreational disturbance at the European sites. Accordingly, and when following a precautionary approach, the proposal, in combination with other plans and projects, would be likely to have a significant adverse effect. Hence, an appropriate assessment, in accordance with the Habitat Regulations1, is required to consider the implications of the proposal on the European sites in view of their conservation objectives.
The European sites have been designated because they include habitats that support rare bird species. The overarching conservation objectives for the relevant European sites is to avoid a deterioration of habitats and minimise disturbance, thereby ensuring the integrity of the sites is maintained. The appellant has confirmed a willingness to provide a financial contribution in line with the methodology in the [name], which is supported by Natural England as the Statutory Nature Conservation Body. The contribution would be pooled with others and used for access management and monitoring at the European sites in line with the [name].
The contribution would be secured through the submitted unilateral undertaking and would be directly related to the impacts of the proposal on the European sites. It is necessary to make the development acceptable and the contribution would be fairly and reasonably related in scale and kind to the development because it follows the methodology in the [name]. Moreover, there is no reason to doubt that the Council, as a responsible public body, will spend the money in the way it is intended. Accordingly, the contribution is an obligation that can be taken into account and therefore the proposal would not adversely affect the integrity of the European sites, the conditions of which need not deteriorate as a result of the proposal.
The planning obligation also includes clauses relating to the provision of a public open space contribution. This is necessary in order to adhere to the development plan and the contribution would be fairly and reasonably related in scale and kind to the development because it would follow a set methodology. I can therefore take the obligation into account. As a result, there would be no harm to the provision of open space.
Section 09
Conclusion
The prosed development would not adhere to the development plan but material considerations, including the Framework, indicate that the appeal should be determined otherwise than in accordance with the development plan. Accordingly, the appeal should succeed.
Section 10
Schedule of Conditions
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
The development hereby permitted shall be carried out in accordance with the following approved plans: - 1945/1 – Site Plan, 1945-3-D and 1945-2-D – [name], 1945-8-A - [name] 1 And 2, 1945-12- A – [name] 3, 1945-9-A - [name] 1 and 2, 1945-13-A - Amended Floor Plan Plot 3, 1945-7-A - Amended Garage Plans And Elevations Plots 1, 2 and 3, 1945-3-D - Amended Roof Plan, 1945-4-D - Amended Landscaping Plan, 1945-17 - Amended Existing Floor Plan ([address]) - 1945-18, [name] ([address]), 1945-19 - [name] ([address]), 1945-20 - [name] Elevations ([address]).
Notwithstanding the submitted details on the approved plans, no development shall commence beyond demolition until there shall have been submitted to and approved in writing by the local planning authority a scheme of hard and soft landscaping. Development shall be carried out in accordance with the approved details with all proposed landscaping being carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development, whichever is the sooner. Any existing or proposed trees or plants shown on the approved landscaping scheme which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
No development beyond demolition shall occur until an [name] (AMS) has been submitted to and approved in writing by the local planning authority. The AMS shall include details of tree and hedge protection during construction. The development shall be implemented in accordance with the approved AMS.
Prior to occupation of the development, the highway access at its centre line shall be provided with a visibility splay with dimensions of 2.4 metres by 43 metres in both directions, as measured from and along the nearside edge of the carriageway. Such vehicular visibility splays shall be provided before the access is first used by vehicular traffic and it shall be retained free of obstruction above 600mm at all times.
Prior to occupation of the development a vehicular turning facility within the site, of a design to be approved in writing by the Local Planning Authority, shall be constructed and surfaced and thereafter maintained free from obstruction at all times for that sole purpose.
Prior to the occupation of any of the proposed dwellings, the proposed private drive shall be constructed to a width of 5.5 metres for at least the first 6 metres from the back of [name] and provided with an appropriate dropped kerb crossing of the verge.
The vehicular access road shall be constructed at right angles to the highway boundary and to the existing carriageway and shall be provided, but not be limited to, the following: • Provision of a size 5 turning head; and • No unbound material shall be used in the surface treatment throughout.
There shall be no discharge of surface water onto the Highway.
Notwithstanding the approved drawings, the single garages should have a minimum internal measurement of 7m x 3m and the proposed double garage should have a minimum internal measurement of 7m x 5.5m.
Prior to occupation of the proposed dwelling, the Developer shall be responsible for the provision and implementation of a [name] for sustainable transport, approved by Essex County Council, to include six one day travel vouchers for use with the relevant local public transport operator free of charge.
No development beyond site clearance shall take place until a Construction Management Plan has been submitted to, and approved in writing by, the local planning authority. The approved plan shall be adhered to throughout the construction period. The Plan shall provide for: i. the parking of vehicles of site operatives and visitors ii. loading and unloading of plant and materials iii. storage of plant and materials used in constructing the development iv. wheel and underbody washing facilities v. measures to reduce noise and dust during construction and vi the hours of construction.
Notwithstanding the provisions of Article 3, Schedule 2, Part 1 of the Town and Country Planning (General Permitted Development) Order 2015 (as amended), no dormers shall be inserted in the east-facing roofslopes of Plots 2 and 3 and neither the east or west- facing rooflslopes of Plot 1 except in accordance with details which shall previously have been submitted to and approved, in writing, by the Local Planning Authority.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 316No official casework-database value to compare
- Extracted decision date · page 1
- 5 July 2021Matches the official casework database
- Extracted site visit dates
- 14 June 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3265279
- Application reference
- 19/01937/FUL
- Lead case reference
- Not recorded
- Planning authority
- Tendring District Council
- Planning authority code
- E07000076
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.33 hectares
- Floor space
- Not recorded
- Number of residences
- 3
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 15 December 2020
- Valid date
- 13 January 2021
- Start date
- 31 March 2021
- Planning authority decision date
- 22 June 2020
- Appeal decision date
- 5 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 165
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25