Appeal 3266226
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of front and rear roof extensions.
Section 02
Decision
The appeal is dismissed.
An application for costs was made by [name] against the London Borough of Hackney Council. This application is the subject of a separate decision.
Section 03
Preliminary Matters
In the period since the appeal was submitted the Government has published a revised version of the National Planning Policy Framework (The Framework). Also since the submission of the appeal the Mayor of London has published the adopted London Plan 2021 (LP 2021). This replaces the London Plan 2016 which is referred to in the appeal documentation. As an adopted plan I must consider the policies of the LP 2021. However, in respect of this appeal, Policy D3 is the principal relevant policy and this largely covers similar points to former London Plan Policies 7.4 and 7.6. Neither the new policies nor the revised Framework have brought me to any different decision on the appeal and therefore I have not considered it necessary to invite the appeal parties to comment on the new documents.
It should be noted that there is a concurrent appeal [name]/U5360/D/21/3268637 at the same property for the extension of the lower ground and ground floor levels and front and rear lightwells. However, as the two appeals have been submitted separately and deal with two distinct extension proposals I have dealt with them separately.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the host building and its surroundings on [address].
Section 05
Reasons
The appeal site is located on the north east side of [address], a tree lined street of 2 storey terraces constructed in brick and render some with basement and or loft accommodation. The terraced houses on the north east side have a rhythmical front bay detail with those towards the upper end of the road, as with the appeal property and its neighbour, having a half-timbered gabled top to the bay which provides an attractive form to the original roofscape along the street. No 9 and its neighbour at No 11 are largely unaltered on the frontage and read as an attractive pairing, whereas a considerable number of the properties have been altered to provide accommodation in the roof space and which is now proposed on the appeal property. Both rear facing and front facing box dormers have been used on a number of properties to achieve the necessary head height in the loft space.
The Hackney Residential Extensions and Alterations Supplementary Planning Document (SPD) has been prepared by the Council to achieve high quality in householder alterations including roof extensions. The SPD does allow for front roof extensions where the housing typology would allow roof extensions and where there is a precedence of roof extensions already and where the amenity and visual impact is acceptable. However in all cases the guidance is that high quality design should be employed, the conversion should not depart from or disrupt the existing roof form, and that additions to the roof form should be in scale with and proportionate to the existing roof.
[name] accept that the house typology has been altered in the street and that a large number of the front dormer extensions (approximately 18 in total) occupy the majority of the roof slope, most do not stretch from party wall to party wall and are set up from the eaves and some also down from the ridge. Two roof extensions indeed are more attractively designed with two individual dormers on the front roof slope which appear much more proportionate to the roof. I have been referred to an appeal decision on No [address] which was allowed and which the appellant considers justifies the proposal at No 9. However, from my observation on site I am not satisfied that it is entirely similar. The front box dormer at No 63 is set in from the party walls and the upstand from the eaves is greater than that proposed at No 9. The two are not therefore directly comparable and I will determine the appeal case on its own merits.
The appellant’s design, although with a very small upstand from the eaves (less than 0.5 metres), stretches from parapet wall to parapet wall and rises to the full height of the ridge. In combination with the similar rear dormer the proposal would convert what is an attractive pitched roof property into a flat roofed house with the box dormer extensions entirely subsuming the roof slopes. Moreover, the fenestration on the front facing dormer would be out of alignment with the window design in the lower floors and the right-hand window being a two light window further exaggerates the top-heavy effect of the dormer. As stated above, this particular pairing of properties (Nos 9 and 11) has retained the original form of the front facade and roof and the proposal, for the reasons above, would be unacceptable, notwithstanding what I accept is a heavily altered roofscape in [address].
In respect of the rear dormer, I accept there are some full width dormers in evidence to the rear of the terrace but nevertheless, cumulatively, with the other extensions permitted and proposed on this property the effect of the rear dormer would be disproportionate to the character and appearance of the rear elevation of the property.
The Framework at paragraph 130 requires that developments must be sympathetic to local character to create high quality buildings and spaces amongst other things and in these respects the proposal fails. Policy D3 of the LP2021 reflects the Framework in requiring development to respond to the existing character of a place and be of high quality, with architecture that pays attention to detail. The same is the case with Hackney Local Plan (HLP) Policy LP1 which requires all development to be of the highest architectural and urban design quality and to respond to local character and context and be compatible with existing townscape amongst other things. For the above reasons, the proposed dormers would have an unacceptable impact on the character and appearance of the host building and on the frontage the proposal pays little attention to detail and shows no attempt to design the dormer to be in keeping with the guidance in the SPD to the further detriment of the character and appearance of [address].
Section 06
Other Matters
I have had regard to the Public Sector Equality Duty contained in the Equality Act 2010 and I understand the appellant’s wish to achieve a larger family unit and make sustainable and effective use of housing land an objective which is encouraged by the Framework in Section 11. I acknowledge that this national policy objective makes the principle of house extensions acceptable. However, paragraph 124 in the same section of the Framework states that this should not be at the expense of maintaining an area’s prevailing character and setting. Sustainable and effective use of the dwelling or indeed the aspiration of the emerging Action Area Plan to increase the supply of large houses by providing additional accommodation at loft level would not therefore outweigh the harm to the character and appearance as a result of the proposal and in particular the impact on the street frontage.
Section 07
Conclusion
In reaching my decision I have had regard to the matters before me but for the reasons above the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 628No official casework-database value to compare
- Extracted decision date · page 1
- 21 September 2021Matches the official casework database
- Extracted site visit dates
- 27 August 2021 (page 1)
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 566No official casework-database value to compare
- Extracted decision date · page 1
- 21 September 2021Matches the official casework database
- Extracted site visit dates
- 27 August 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3266226
- Application reference
- 2020/3003
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Hackney
- Planning authority code
- E09000012
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 95 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 3 January 2021
- Valid date
- 3 January 2021
- Start date
- 24 March 2021
- Planning authority decision date
- 26 November 2020
- Appeal decision date
- 21 September 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 3466
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21