Appeal 3266241
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension; rear roof extension, and installation of three roof lights to front roof slope.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is whether the Council’s refusal to issue a certificate of lawfulness (‘LDC’) was well-founded. The development would be lawful if the proposed operations described in the application would fall within the provisions of the Schedule 2, Part 1 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (‘the GPDO’) if instituted on the date of the application.
Section 04
Reasons
The Council’s reason for refusal is not related to the roof extension in any way and only to the ground floor rear extension. The Council, in its delegated decision, set out the requirements and limitations from [name] and C and , based on the plans submitted with the application ([name]: 2131.1 [name], 2131.2. [name] and 2131.3.[name]) and was satisfied that the proposals in relation to the roof extension and roof lights met them. I have no reason to doubt the parties on the point and I am therefore satisfied that the proposals relating to the rear roof extension and three roof lights to the front roof slope would be permitted development pursuant to Schedule 2, Part 1, [name] and C of the GPDO.
The Council’s reason for refusal was that the proposed development falls outside of the provision of Schedule 2, Part 1 of the GPDO and is therefore unlawful. In particular, the Council stated that the rear ground floor extension required prior approval as it would exceed the permitted depth of 3 metres (contrary to Class A.1 f)(i)) and also that the eaves height would be over the permitted height of 3 metres (contrary to Class A.1 i)). The Council’s case is that the plans submitted with the LDC application show that the eaves would be at the height of 3.25 metres when measured from the natural ground level at the base of the outside wall of the proposed extension to the point where that wall would meet the upper surface of the roof which is in line with the Technical Guidance.
Article 2(2) of the GDPO explains that ‘any reference in this Order to the height of a building or of plant or machinery is to be construed as a reference to its height when measured from ground level’ – and that ‘ground level’ in this context means ‘the level of the surface of the ground immediately adjacent to the building or plant or machinery in question or, where the level of the surface of the ground...is not uniform, the level of the highest part of the surface of the ground adjacent to it’. The appellant’s case is that prior approval was sought and granted under Reference 202754PALHE and this was predicated on the correctly calculated eaves height measurement taken from the level of the surface of the ground immediately adjacent to the rear elevation of the host property.
The difference in opinion in this case arises from whether the height is measured from the outside wall of the host property or the outside wall of the proposed extension.
The Technical Guidance, which is an aid to interpretation and application of the Schedule 2, Part 1 of GPDO, explains that for the purposes of measuring ‘height’ from ‘ground level’, ‘the eaves of a house are the point where the lowest point of a roof slope, or a flat roof meets the outside wall.’ The roof proposed in this case is flat. The diagram accompanying the explanation of how to measure the height of eaves in the Technical Guidance1 clearly shows the eaves height measured on the outside wall of the extension rather than the host property. When measured in this way the height of the proposed eaves exceeds what is permitted under Class A.1 i) and would therefore not be lawful.
Prior notification was granted under Reference 202754PALHE but this was on a mistaken understanding of the provisions of Class A.1 i). The development subsequently undertaken is only lawful if it is in fact permitted development under the provisions of the GDPO and meets all of the conditions and limitations, irrespective of whether there has been a prior notification. In this case, the proposed operations would not be permitted development under Schedule 2, Part 1 Class A, because it would not comply with Class A.1 i) in terms of the proposed eaves height.
Section 05
Conclusion
For the reasons given above I conclude that the Council’s refusal to grant a certificate of lawful use or development in respect of a single story rear extension was well-founded and that the appeal should fail. However, I find that the Council’s refusal to grant an LDC in respect of rear roof extension and 1 Page 12 of MHCLG’s “Permitted development rights for householders - Technical Guidance (2019)” installation of three roof lights to front roof slope was not well-founded and the appeal should succeed in part. I will exercise accordingly the powers transferred to me in section 195(2) and (3) of the 1990 Act as amended.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 430No official casework-database value to compare
- Extracted decision date · page 1
- 26 July 2021Matches the official casework database
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3266241
- Application reference
- 203137CPL
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Ealing
- Planning authority code
- E09000009
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Lawful Development Certificate
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. The decision of the LPA refusing/refusing in part to grant a certificate of lawful use or development
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 3 January 2021
- Valid date
- 4 January 2021
- Start date
- 11 March 2021
- Planning authority decision date
- 20 October 2020
- Appeal decision date
- 26 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 1133
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25