Appeal 3266809
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
for the erection of a detached office with associated access and parking.
Section 02
Decision
The appeal is dismissed.
Section 03
Applications for costs
An application for costs is made by [name] against Bournemouth Christchurch Poole Council. This costs application is set out with a separate
Section 04
[name]
The main issues are the effect of the development on (1) the living conditions of those living in the flats at [address], and (2) highway/pedestrian safety.
Section 05
Living Conditions
The proposed office would be to the rear of No [address], which has previously been converted to flats. I note that planning application ref: 8/11/0482 conditioned that the bin and cycle store shown on the plans should be maintained at all times to serve the flats. However, the proposed office would be positioned where it would necessitate the removal of the outbuilding which could provide a cycle or bin store.
The issue is therefore whether the store is still required for the flats at No 118. This is a sustainable location, with some services and facilities within walking or cycling distance. As such, cycle use is positive. However, from my observations there is space within the curtilage of No 118 for the storage of bikes without the store building. There is also space within the curtilage of No 118 for bins to be stored in appropriate locations.
For these reasons the bin and cycle store is a positive feature, but not essential to support the living conditions of occupiers of those living within No 118 in these circumstances. For this reason, the proposal would not be harmful to the living conditions of neighbours to the site and is therefore in accordance with policies HE2 & KS12 of the Christchurch and East Dorset Local Plan Core Strategy (2014). These policies require development to have a minimal disturbance to neighbour amenity and provide adequate cycle parking.
Section 06
Highway/[name]
The proposed office would be accessed off [address], via a private lane between No 116 and No 118. This is a narrow lane, which also provides pedestrian access to one of the flats at No 118. The proposed office would likely increase traffic through this lane between [address] and the office parking spaces as proposed.
From my observations, more frequent traffic along this narrow lane for pedestrians (for the flats or the proposed office) would be hazardous, with no safe passing, even though I acknowledge it is a short lane in its length.
Furthermore, the visibility when exiting the lane onto [address] is not adequate. [address] is clearly a busy road and at the time of my site visit there was many pedestrians crossing the front of the lane along the public footpath. The access is narrow and with no clear visibility splays to account for pedestrians. As such, a significant intensification in use of this lane by vehicles could be hazardous, with there being no substantive evidence to the contrary.
There is also the issue of the turning space within the site if the office is constructed which appears tight. There is no tracking information before me, but this could result in vehicles having difficulty turning within the site and reversing down the access lane, exacerbating the issue of safety for pedestrians as there would be poorer visibility from a reversing vehicle.
I am aware that an office was previously approved (ref: 8/17/2519/FUL) in this location and that there were no highways concerns at that time. However, from my observations at the site coupled with the evidence before me with this appeal (including the [name] comments dated 17 September 2020) I conclude that this access to the proposed office is hazardous with there being a lack of detailed evidence to persuade me otherwise. It is my understanding that the previous approval has ‘time expired’, but also the lack of progress with the previous approved scheme suggests it is not a realistic fallback position.
For the reasons set out above and taking into account the fact there was a previous approval for the office using the existing access, it is my conclusion that the access would be substandard and potentially hazardous for pedestrians. The fact there was a previous approval for a similar development does not outweigh my concerns regarding pedestrian safety with any intensification of use of this lane by vehicles. The proposal is therefore contrary to policy KS11 of the Christchurch and East Dorset Local Plan Part 1 - [name], which requires that development to provide safe access to the existing transport network and allow safe movement of development related trips on the immediate network, amongst other things.
Section 07
Conclusion
The proposal would have economic benefits, with the provision of an office and employment. There would also be economic benefits through the construction process of the proposed development also, amongst other benefits. However, all the benefits cumulatively would be significantly and demonstrably outweighed by the safety concerns relating to the inadequate access and so the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 223No official casework-database value to compare
- Extracted decision date · page 1
- 8 July 2021Matches the official casework database
- Extracted site visit dates
- 10 May 2021 (page 1)
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 223No official casework-database value to compare
- Extracted decision date · page 1
- 8 July 2021Matches the official casework database
- Extracted site visit dates
- 10 May 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3266809
- Application reference
- 8/20/0643
- Lead case reference
- Not recorded
- Planning authority
- Bournemouth, Christchurch and Poole
- Planning authority code
- E06000058
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.02 hectares
- Floor space
- 70 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 13 January 2021
- Valid date
- 13 January 2021
- Start date
- 12 March 2021
- Planning authority decision date
- 26 November 2020
- Appeal decision date
- 8 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 377
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25