Skip to main content
Official casework recordDismissedCurrent release

Appeal 3266809

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

for the erection of a detached office with associated access and parking.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Applications for costs

    An application for costs is made by [name] against Bournemouth Christchurch Poole Council. This costs application is set out with a separate

  3. Section 04

    [name]

    The main issues are the effect of the development on (1) the living conditions of those living in the flats at [address], and (2) highway/pedestrian safety.

  4. Section 05

    Living Conditions

    The proposed office would be to the rear of No [address], which has previously been converted to flats. I note that planning application ref: 8/11/0482 conditioned that the bin and cycle store shown on the plans should be maintained at all times to serve the flats. However, the proposed office would be positioned where it would necessitate the removal of the outbuilding which could provide a cycle or bin store.

    The issue is therefore whether the store is still required for the flats at No 118. This is a sustainable location, with some services and facilities within walking or cycling distance. As such, cycle use is positive. However, from my observations there is space within the curtilage of No 118 for the storage of bikes without the store building. There is also space within the curtilage of No 118 for bins to be stored in appropriate locations.

    For these reasons the bin and cycle store is a positive feature, but not essential to support the living conditions of occupiers of those living within No 118 in these circumstances. For this reason, the proposal would not be harmful to the living conditions of neighbours to the site and is therefore in accordance with policies HE2 & KS12 of the Christchurch and East Dorset Local Plan Core Strategy (2014). These policies require development to have a minimal disturbance to neighbour amenity and provide adequate cycle parking.

  5. Section 06

    Highway/[name]

    The proposed office would be accessed off [address], via a private lane between No 116 and No 118. This is a narrow lane, which also provides pedestrian access to one of the flats at No 118. The proposed office would likely increase traffic through this lane between [address] and the office parking spaces as proposed.

    From my observations, more frequent traffic along this narrow lane for pedestrians (for the flats or the proposed office) would be hazardous, with no safe passing, even though I acknowledge it is a short lane in its length.

    Furthermore, the visibility when exiting the lane onto [address] is not adequate. [address] is clearly a busy road and at the time of my site visit there was many pedestrians crossing the front of the lane along the public footpath. The access is narrow and with no clear visibility splays to account for pedestrians. As such, a significant intensification in use of this lane by vehicles could be hazardous, with there being no substantive evidence to the contrary.

    There is also the issue of the turning space within the site if the office is constructed which appears tight. There is no tracking information before me, but this could result in vehicles having difficulty turning within the site and reversing down the access lane, exacerbating the issue of safety for pedestrians as there would be poorer visibility from a reversing vehicle.

    I am aware that an office was previously approved (ref: 8/17/2519/FUL) in this location and that there were no highways concerns at that time. However, from my observations at the site coupled with the evidence before me with this appeal (including the [name] comments dated 17 September 2020) I conclude that this access to the proposed office is hazardous with there being a lack of detailed evidence to persuade me otherwise. It is my understanding that the previous approval has ‘time expired’, but also the lack of progress with the previous approved scheme suggests it is not a realistic fallback position.

    For the reasons set out above and taking into account the fact there was a previous approval for the office using the existing access, it is my conclusion that the access would be substandard and potentially hazardous for pedestrians. The fact there was a previous approval for a similar development does not outweigh my concerns regarding pedestrian safety with any intensification of use of this lane by vehicles. The proposal is therefore contrary to policy KS11 of the Christchurch and East Dorset Local Plan Part 1 - [name], which requires that development to provide safe access to the existing transport network and allow safe movement of development related trips on the immediate network, amongst other things.

  6. Section 07

    Conclusion

    The proposal would have economic benefits, with the provision of an office and employment. There would also be economic benefits through the construction process of the proposed development also, amongst other benefits. However, all the benefits cumulatively would be significantly and demonstrably outweighed by the safety concerns relating to the inadequate access and so the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 223No official casework-database value to compare
    Extracted decision date · page 1
    8 July 2021Matches the official casework database
    Extracted site visit dates
    10 May 2021 (page 1)
  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 223No official casework-database value to compare
    Extracted decision date · page 1
    8 July 2021Matches the official casework database
    Extracted site visit dates
    10 May 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3266809
Application reference
8/20/0643
Lead case reference
Not recorded
Planning authority
Bournemouth, Christchurch and Poole
Planning authority code
E06000058

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.02 hectares
Floor space
70 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
13 January 2021
Valid date
13 January 2021
Start date
12 March 2021
Planning authority decision date
26 November 2020
Appeal decision date
8 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
377
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
20 August 2026 at 16:25