Appeal 3267030
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
conversion of traditional agricultural building into one dwelling, creating a small glazed extension and proposed double storey garage.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue in this appeal is the effect of the development on the efficiency of the [name] (JBRT)
Section 04
Reasons
The appeal site is allocated as being within the [name]. The building in question is a brick building, two-storeys in height, that was formerly used as a barn.
The appellant states that it was not necessary, under the terms of the 1973 Direction, to consult [name] (JBO) because the site is in the outer JBRT consultation zone and the proposed development is a change of use to a single dwelling. I do not agree with this, and having viewed the consultation zone map, I am satisfied that the appeal site is located just inside the inner zone. As it is located within the inner zone, and the proposed development is not one of the exceptions to consultation listed in the First Schedule of the Town and Country Planning ([name]) Direction 1973 (the Direction), under the terms of the Direction, the Council was correct to consult the University of Manchester (UoM) on this proposal.
The UoM response briefly describes the work of the JBRT, and the harm that can be caused to its efficient operation by equipment commonly found in residential dwellings. Reference is made to nationally and internationally agreed definitions of the level of harmful interference to radio astronomy.
The UoM states that it opposes development across a significant part of the consultation zone in order to protect the efficiency of the JBRT’s ability to receive radio emissions from space with a minimum of interference from electrical equipment.
The consultation zone covers a significant section of the Council area lying generally from the southeast to west of JBO. Within this area lie a number of settlements, including [name], Goostrey and parts of Congleton.
Of course, it is not just the appeal site which lies in this zone relative to JBO. The whole of Goostrey does so too. Equipment commonly, although not exclusively, found within residential properties causes radio frequency interference and that interference can disrupt, distort, corrupt and ultimately render unusable pulsar data.
Goostrey lies to the south west of [name] (JBO). Saved policy PS10 of the Congleton Borough Local Plan (the CBLP) states that proposals within the consultation zone will not be permitted where they can be shown to impair the efficiency of the [name]. Cheshire East Local Plan Local Plan Strategy (the CELPS) policy SE14 repeats this approach, going on to state that conditions may be used to mitigate identified impacts and that proposals are expected to consider their impact upon the elements that contribute to the significance and value of the JBO. Goostrey Neighbourhood Plan (GNP) policy SC2 adopts a similar approach to development that would impair the efficiency of the JBO operations.
In the past, measures to reduce electrical emissions from new developments were suggested by UoM, and I note that reference is made to this approach in Policy SE14 of the CELPS. However, the UoM also note that screening a house does nothing to reduce the radio interference caused by the outdoor activities of its occupants.
The Council refers to other appeal decisions in the area in order to support their position and I note the appellant’s comments in relation to these appeals. I am not familiar with these decisions or their locations and development context, and I note that the scale of development proposed in a number of these cases is different to the appeal before me, and in one case, very significantly larger. Whilst each proposal must be considered on their own merits, collectively, these decisions establish the considerable importance that has been given to the effect of development on the telescopes.
[name] objections to the proposals were set out in general terms in respect of the application, more detailed calculations setting out the methodology for how they were arrived at were submitted with the appeal submissions. The basis of these calculations and the methodology used has previously been considered at other appeals and accepted and the basis for the calculations has not been disputed in this instance.
The International Telecommunications Union (ITU) defines a level of interference which is considered as detrimental to radio astronomy and is expressed in the form of ITU recommendation ITU-RA-769.2. This is, I understand, the only internationally recognised standard for interference thresholds across the spectral bands used for radioastronomy.
The JBO submissions conclude that the proposals would be expected to produce levels of interference in excess of the ITU threshold for interference harmful to radio astronomy by a factor of 2.5. Together with the collective impact of existing development, the proposals would add to, albeit to a limited degree, existing high levels of radio interference.
Unlike the other policies cited in the refusal reason, the CELPS policy SE14 does consider the use of conditions in order to mitigate identified impacts. Those mitigation measures can only attempt effective mitigation and cannot be expected to mitigate all interference through escape from door and window openings and the use of outside space. As the levels of interference cumulatively already exceed the ITU thresholds by a significant factor, the additional impacts of the proposals along with the contribution that they would make to other sources of interference, are such that I cannot be satisfied that conditions would appropriately mitigate the impacts such that the proposals would avoid impairment to the efficient operation of the JBO.
Moreover, I have to take into account the University of Manchester’s objection to the appeal scheme, which identifies that interference would be likely to emanate from the appeal proposal despite any proposed mitigation. I must consider that, due to the international importance of [name] work, that this is nonetheless a matter which attracts considerable weight.
I must conclude that the proposal would, for the reasons set out and on the basis of the calculations submitted, be likely to impair the efficiency of the operation of the JBO. From all that I have read, in the evidence provided regarding the significance and importance of the research undertaken at JBO, I give the impact of the proposed development on the efficient operation of JBRT significant weight.
From the evidence before me, the proposed development would be likely to adversely affect the efficiency of the JBRT. Any impact caused by the appeal development would be in addition to impacts caused by existing developments in the area, which would therefore increase its significance. Consequently, for the reasons given above, the proposed development would conflict with Policy SE14 of the CELPS, Policy PS10 ([name] Zone) contained in the Congleton Borough Local Plan 2005 (CBLP) and with the Framework, in this regard.
Section 05
Other Matters
I have noted the appellants comments in relation to the fallback position of a C1 use, but agree with the Council that the size of the use is somewhat restrictive in terms of the proposed use, and also the use would not create the same issues as the appeal proposals, therefore I give the fallback position limited weight in my assessment.
Section 06
Conclusion
For the above reasons, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 221No official casework-database value to compare
- Extracted decision date · page 1
- 1 July 2021Matches the official casework database
- Extracted site visit dates
- 22 June 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3267030
- Application reference
- 20/2250C
- Lead case reference
- Not recorded
- Planning authority
- Cheshire East
- Planning authority code
- E06000049
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.08 hectares
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- Yes
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- No
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 15 January 2021
- Valid date
- 15 January 2021
- Start date
- 20 April 2021
- Planning authority decision date
- 11 August 2020
- Appeal decision date
- 1 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 33
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25