Appeal 3268025
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Single storey rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
The address on the plans refers to the site as being [address], while the application forms and the Council’s decision notice refer to [site address] . The address on the appeal form refers to [address], Surbiton, which I note from the application form refers to the applicant’s address rather than the site address. Both parties agree that the site is [site address] and I am satisfied that the appellant is the original applicant so I have used the address in the banner heading above.
The Council altered the description of the development from “Single storey rear extension” to “Prior approval for a single storey rear extension projecting from the rear of the original house by 5m.” I consider this to be a more accurate description of the appeal proposals and I have therefore considered the appeal on this basis.
Section 04
Main Issue
Whether the development would be permitted under Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO).
Section 05
Reasons
Where an application is made for a determination as to whether prior approval is required for development which exceeds the limits in paragraphs A.1(f) but is allowed by paragraph A.1(g) to Part 1, paragraph A.4(3) provides that the local planning authority may refuse the application where it considers that the proposed development does not comply – or that the developer has provided insufficient information to enable the authority to establish whether the proposed development complies with the conditions, limitations or restrictions that are applicable to such permitted development.
Permitted development rights granted through the GPDO are subject to a number of conditions and limitations, including those set out at paragraph A.4 of Part 1, Class A, of Schedule 2. [name].4(2) identifies the information that must be submitted with an application for prior approval in order to make it valid. The appellant has not questioned the date the application was validated by the Council, so the implication is that the information required by subparagraph 2 was provided on 10 December 2020.
[name].4(10) states that development must not begin before the occurrence of a number of the matters. Of those, paragraph A.4(10)(c) states the development must not begin before the expiry of 42 days following the date on which the information referred to in paragraph A.4(2) was received by the LPA without the LPA notifying the developer as to whether prior approval is given or refused. The expiry of 42 days following 10 December 2020 is 21 January 2021. The Council’s decision notice is dated 20 January 2021. Thus, I am satisfied that the Council’s decision was issued within the correct timeframe.
The GPDO 2015 was amended by the Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2017 through the insertion of paragraph A.1(ja): development is not PD where any total enlargement (being the enlarged part together with any existing enlargement of the original dwellinghouse to which it will be joined) exceeds or would exceed the limits set out in sub-paragraphs (e) to (j).
One of the limitations states that an extension would not be PD where it would extend beyond the side wall of the original dwellinghouse and would have a greater width than half the width of the original dwellinghouse. The Technical Guidance1 indicates that a wall forming a side elevation will be any that cannot be identified as being a front wall or a rear wall.
Both parties agree that the dwelling currently benefits from a small single storey projection and further infill extension. The proposal is to extend the dwelling by providing a single storey extension to the side and rear of the existing property. The proposed extension would span the full width of the appeal property. It appears to me that the proposal would also include a side extension to provide the utility room, although there is already a similar lean-to arrangement here, attached to the existing single storey rear projection. Therefore, the proposal would include an extension to a side elevation resulting in a width greater than half the width of the original dwellinghouse.
The appellant submits that the element which affects the side wall would be demolished to make way for the proposed development and as such should not form part of the assessment. Whilst the appeal documents refer to the demolition, the plans and the application forms do not confirm that demolition would take place and I have been supplied with no substantive evidence to suggest that the proposed development involves any demolition. 1 Technical Guidance: Permitted Development for Householders (2019); p22
It is further submitted by the appellant that the proposed extension should be assessed on the basis of Part g of A.1 rather than (j). My assessment is based on [name].1(g) in that the proposal would exceed the limits in paragraph A.1(f) but is allowed by A.(g) as set out above. Notwithstanding, the Council has made their assessment on the basis of the information before them, as have I, with insufficient evidence for me to reach a conclusion to the contrary.
As the proposal would include the extension to a side wall and would result in a development that is more than half the width of the original dwellinghouse, I conclude that the proposed development cannot be considered to be PD.
Consequently, the development does not constitute permitted development under Schedule 2, Part 1, Class A of the GPDO.
Section 06
Conclusion
For the reasons given above, and having had regard to all other matters raised, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 171No official casework-database value to compare
- Extracted decision date · page 1
- 27 August 2021Matches the official casework database
- Extracted site visit dates
- 11 June 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3268025
- Application reference
- DM2020/02085
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Sutton
- Planning authority code
- E09000029
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 28 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 1 February 2021
- Valid date
- 9 February 2021
- Start date
- 30 March 2021
- Planning authority decision date
- 20 January 2021
- Appeal decision date
- 27 August 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 2411
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21