Skip to main content
Official casework recordDismissedCurrent release

Appeal 3268025

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

Single storey rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matters

    The address on the plans refers to the site as being [address], while the application forms and the Council’s decision notice refer to [site address] . The address on the appeal form refers to [address], Surbiton, which I note from the application form refers to the applicant’s address rather than the site address. Both parties agree that the site is [site address] and I am satisfied that the appellant is the original applicant so I have used the address in the banner heading above.

    The Council altered the description of the development from “Single storey rear extension” to “Prior approval for a single storey rear extension projecting from the rear of the original house by 5m.” I consider this to be a more accurate description of the appeal proposals and I have therefore considered the appeal on this basis.

  3. Section 04

    Main Issue

    Whether the development would be permitted under Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO).

  4. Section 05

    Reasons

    Where an application is made for a determination as to whether prior approval is required for development which exceeds the limits in paragraphs A.1(f) but is allowed by paragraph A.1(g) to Part 1, paragraph A.4(3) provides that the local planning authority may refuse the application where it considers that the proposed development does not comply – or that the developer has provided insufficient information to enable the authority to establish whether the proposed development complies with the conditions, limitations or restrictions that are applicable to such permitted development.

    Permitted development rights granted through the GPDO are subject to a number of conditions and limitations, including those set out at paragraph A.4 of Part 1, Class A, of Schedule 2. [name].4(2) identifies the information that must be submitted with an application for prior approval in order to make it valid. The appellant has not questioned the date the application was validated by the Council, so the implication is that the information required by subparagraph 2 was provided on 10 December 2020.

    [name].4(10) states that development must not begin before the occurrence of a number of the matters. Of those, paragraph A.4(10)(c) states the development must not begin before the expiry of 42 days following the date on which the information referred to in paragraph A.4(2) was received by the LPA without the LPA notifying the developer as to whether prior approval is given or refused. The expiry of 42 days following 10 December 2020 is 21 January 2021. The Council’s decision notice is dated 20 January 2021. Thus, I am satisfied that the Council’s decision was issued within the correct timeframe.

    The GPDO 2015 was amended by the Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2017 through the insertion of paragraph A.1(ja): development is not PD where any total enlargement (being the enlarged part together with any existing enlargement of the original dwellinghouse to which it will be joined) exceeds or would exceed the limits set out in sub-paragraphs (e) to (j).

    One of the limitations states that an extension would not be PD where it would extend beyond the side wall of the original dwellinghouse and would have a greater width than half the width of the original dwellinghouse. The Technical Guidance1 indicates that a wall forming a side elevation will be any that cannot be identified as being a front wall or a rear wall.

    Both parties agree that the dwelling currently benefits from a small single storey projection and further infill extension. The proposal is to extend the dwelling by providing a single storey extension to the side and rear of the existing property. The proposed extension would span the full width of the appeal property. It appears to me that the proposal would also include a side extension to provide the utility room, although there is already a similar lean-to arrangement here, attached to the existing single storey rear projection. Therefore, the proposal would include an extension to a side elevation resulting in a width greater than half the width of the original dwellinghouse.

    The appellant submits that the element which affects the side wall would be demolished to make way for the proposed development and as such should not form part of the assessment. Whilst the appeal documents refer to the demolition, the plans and the application forms do not confirm that demolition would take place and I have been supplied with no substantive evidence to suggest that the proposed development involves any demolition. 1 Technical Guidance: Permitted Development for Householders (2019); p22

    It is further submitted by the appellant that the proposed extension should be assessed on the basis of Part g of A.1 rather than (j). My assessment is based on [name].1(g) in that the proposal would exceed the limits in paragraph A.1(f) but is allowed by A.(g) as set out above. Notwithstanding, the Council has made their assessment on the basis of the information before them, as have I, with insufficient evidence for me to reach a conclusion to the contrary.

    As the proposal would include the extension to a side wall and would result in a development that is more than half the width of the original dwellinghouse, I conclude that the proposed development cannot be considered to be PD.

    Consequently, the development does not constitute permitted development under Schedule 2, Part 1, Class A of the GPDO.

  5. Section 06

    Conclusion

    For the reasons given above, and having had regard to all other matters raised, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 171No official casework-database value to compare
    Extracted decision date · page 1
    27 August 2021Matches the official casework database
    Extracted site visit dates
    11 June 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3268025
Application reference
DM2020/02085
Lead case reference
Not recorded
Planning authority
London Borough of Sutton
Planning authority code
E09000029

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
3. Refused prior approval of permitted development rights
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
28 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
1 February 2021
Valid date
9 February 2021
Start date
30 March 2021
Planning authority decision date
20 January 2021
Appeal decision date
27 August 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
2411
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21