Skip to main content
Official casework recordDismissedCurrent release

Appeal 3268213

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as, “[name] (Retrospective Application)”.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Application for costs

    The appellant made an application for costs. This application for costs has been dealt with in a separate decision.

  3. Section 04

    Preliminary Matters

    The appeal scheme involves some retrospective development which at the time of the application had commenced and at the time of my site visit was substantially built.

    The appellant has presented me with another drawing, referenced ‘Proposed Section AA [name], to clarify that the proposed roof overhang would be cut back. However, in my view, this suggested cut back of the roof overhang is not readily apparent from [name] 01 ([name]), dated October 2017. The overhang part is shown on the ‘Proposed Section AA’ and there is no form of annotation, either words or measurements, to explain any form of cut back.

    As such, whilst intended as a clarification, I find that this additional drawing represents a material change to the scheme to that which was submitted to the Council. The ‘Procedural Guide: Planning appeals – England’ makes it clear that ‘the appeal process should not be used to evolve a scheme and it is important that what is considered by the Inspector is essentially what was considered by the local planning authority, and on which interested people’s views were sought’. Accordingly, I have determined this appeal on the basis of the ‘Proposed Section AA’ without the cut back clarification. To do otherwise would deprive those who should have been consulted on the change, the opportunity of such consultation.

    During the course of the appeal The London Plan was published1, which replaced all previous versions. The parties were provided with an opportunity to comment on its relevance to this appeal, and I have taken the comments received into account in my determination of this appeal.

  4. Section 05

    [name]

    The main issues are the effect of the proposal on the character and appearance of the host property and the surrounding area, and the effect of the proposal with respect to flood risk.

  5. Section 06

    Character and appearance

    The appeal site comprises a 2-storey semi-detached dwellinghouse situated in a residential area. It has a hipped roof and a 2-storey side element with a cat-slide roof, meaning that the design of the property is congruent with its neighbours and visually the property appears to have reduced mass in comparison with some of the other properties along [address]. Although some properties further along [address] have been extended, the neighbouring properties either side of the appeal site have not.

    The single-storey rear extension, as proposed with a sloping roof, would span the full-width of the host property, and it would protrude some distance beyond it. It would extend up to a considerable height in comparison with its host property. Considering its proposed width, depth, and height, and its rectangular form, the rear extension would present as an unduly large and bulky development which would be overly-dominant when set against its modestly-sized host property. Furthermore, it would incorporate a very prominent rectangular-shaped overhang, which due to its width and depth would exacerbate the ungainly nature of the development as a whole.

    It is clear then, that the proposed development would result in harm to the character and appearance of the host property. Consequently, the contribution that the property makes to the visual attractiveness and the character of the area, which includes the nearby unextended properties, would be noticeably reduced. As such, it would cause harm to the character and appearance of the surrounding area.

    It is common ground that the proposed single-storey rear extension would breach both the depth and height guidelines expressed in the [name] Planning Document 2010 (SPD), although only by a minimal amount in relation to its depth. It is noted that the SPD is guidance rather than policy, and that due to its age, it pre-dates both the current permitted development regime and other relevant planning policy changes. Nevertheless, in this case the breach of its requirements would cause material harm and therefore I consider that its requirements are of relevance to this appeal. I observed the single-storey extension at No [address] but due to its large scale when seen in the context of its host property in my view it does not offer a desirable precedent.

    I therefore find that the proposal would have an unacceptable and harmful effect on the character and appearance of the host property and the 1 The London Plan (published 2021) surrounding area. It would conflict with Core Policy CS1 of the [name] (adopted 2012) ([name]), which provides that, amongst other things, all development shall respond positively to the local and historic context in terms of design, and that extensions should respect their host building.

    It would conflict with Policy DM1 of the Harrow Council Development Management Policies (adopted 2013) (DMP) which provides that, amongst other things, proposals which fail to achieve a high standard of design and layout, or which are detrimental to local character and appearance, will be resisted. It would conflict with Policy D3 of The London Plan which provides that, amongst other things, development proposals should respond to the existing character of a place by identifying the special and valued features and characteristics that are unique to the locality.

    It would also conflict with the advice given in the SPD which provides that, amongst other things, extensions should harmonise with the scale and architectural style of the original building, and the character of the area, and with paragraph 127 of the National Planning Policy Framework (the Framework) which provides that, amongst other things, planning decisions should ensure that developments are sympathetic to local character.

  6. Section 07

    Flood risk

    There is a dispute regarding which [name] the appeal site is located within. From the evidence before me, the Environment Agency’s Flood Map indicates that the site lies in Zone 1 for river flooding. However, rivers are not the only source of flood risk. In this regard I take due note of the consultation response from the Council’s Infrastructure and Drainage department which confirms that the local evidence indicates that the site is at high risk from surface water flooding.

    Footnote 50 of the Framework provides that, amongst other things, within such [name], a site-specific Flood Risk Assessment should be provided. Policy DM9 of the DMP provides that, amongst other things, proposals requiring a Flood Risk Assessment must demonstrate that the development will be resistant and resilient to all relevant sources of flooding including surface water. The appellant has not submitted a Flood Risk Assessment. Accordingly, it has not been demonstrated that the proposal would not increase the risk of flooding.

    The informative referred to by the Council relates to the site being located within a Critical Drainage Area. As such, the use of an informative would not be appropriate with respect to flood risk identified with respect to surface water. Accordingly, this matter does not change my findings on this main issue.

    I therefore find that the proposal would have an unacceptable and harmful effect with respect to flood risk, not decreasing the risk and not making it sufficiently clear that the risk would be at an acceptable level in regard to the requirements of the development plan. As such, it would conflict with Policy DM9 of the DMP which provides that, amongst other things, proposals that would fail to make appropriate provision for flood risk mitigation, or which would increase the risk or consequences of flooding, will be refused.

    It would conflict with Core Policy CS1 of the [name], which provides that, amongst other things, development will be managed to achieve an overall reduction in flood risk and increase resilience to flood events. It would conflict with Policy SI12 of The London Plan which provides that, amongst other things, development proposals should ensure that flood risk is minimised and mitigated. It would also conflict with paragraph 163 of the Framework, which provides that, amongst other things, decision-makers should ensure that flood risk is not increased.

  7. Section 08

    Other Matters

    The appellant has referred to a 4 metres allowance in height under the provisions of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (GPDO). However, the enlarged part of the dwellinghouse would be within 2 metres of the boundary of the curtilage of the dwellinghouse, and although a sloping roof is proposed, specific dimensions have not been provided to show that the height of the eaves of the enlarged part would not exceed 3 metres. Thus, it has not been demonstrated that the proposal would meet the requirements of A.1(i) of Class A of Part 1 of Schedule 2 of the GPDO. As such, I am not persuaded that there is a greater than a theoretical possibility that permitted development rights would be exercised. I have therefore given this matter limited weight.

    Based on the written dimensions provided on the relevant plans, the proposal would extend higher than the development granted via a Lawful Development Certificate (LDC). As the LDC relates to a materially different scheme than the proposal, it offers minimal support for it, and accordingly I have given this matter limited weight.

    Therefore, I find that the matters advanced in support of the proposal, do not, either individually or collectively, outweigh the harm identified, nor the conflict with the development plan.

  8. Section 09

    Conclusion

    For the reasons given above I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 368No official casework-database value to compare
    Extracted decision date · page 1
    2 July 2021Matches the official casework database
    Extracted site visit dates
    21 June 2021 (page 1)
  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 368No official casework-database value to compare
    Extracted decision date · page 1
    2 July 2021Matches the official casework database
    Extracted site visit dates
    21 June 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3268213
Application reference
P/3132/20
Lead case reference
Not recorded
Planning authority
London Borough of Harrow
Planning authority code
E09000015

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
3 February 2021
Valid date
3 February 2021
Start date
7 May 2021
Planning authority decision date
13 November 2020
Appeal decision date
2 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
106
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21