Appeal 3269546
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘dormer window to main house roof in place of two velux windows’.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
[name]
The main issues are the impact on the character and appearance of the host dwelling and whether the proposal would preserve or enhance the character or appearance of the Barnsbury Conservation Area.
Section 05
Reasons for the Recommendation
The site is in the Barnsbury Conservation Area (CA), which derives special interest from the sequences of late Georgian/early Victorian residential developments. In particular, the rooflines of terraced streets are noted as a major component of the CA’s character. The site comprises a traditional style locally listed dwelling in a terraced row with roofscapes void of dormer elements. Overall, it makes a positive contribution to the character and appearance of the CA.
The SPD1 states that roof extensions along an unaltered roofline in a conservation area will not generally be acceptable. It also acknowledges that such proposals would be subject to Design Guidelines2 which state that, apart from certain noted properties, roof extensions visible from any street level 1 Islington Urban Design Guidance Supplementary Planning Document January 2017 2 Islington’s Conservation Area Design Guidelines January 2002 position will not be permitted. While these documents are guidance rather than policy, they remain material considerations.
The host dwelling is not noted as a property where a roof extension would be permitted and despite the presence of rooflights, its roofline can be described as largely unaltered due to the lack of extension elements or dormers. The dormer would introduce ample additional bulk to the property, causing a significant alteration to its roofline. It would result in an uncharacteristic top heavy appearance, upsetting the current form of the dwelling and, as a result, eroding its positive contribution to the character and appearance of the CA.
With regards to the wider area, visibility of the dormer would be limited, and the proposal would not impact the front roofline. Nonetheless, the viewpoint from [address] would provide a clear vantage point of the proposal from street level within the CA. From here, despite the varied rear elevations, the unity and consistency of the current unbroken roofline, reminiscent of the terrace’s original era, is clear. This is an important characteristic that the dormer would upset, such that despite its modest scale, set in and traditional design it would appear out of place, failing to respect the form of the dwelling and its surrounding context.
Although other rear dormers are visible from the site, I have no information on the circumstances under which they were granted permission. In any event, views of the proposed dormer would be experienced primarily in the context of its terraced row, where such development is not characteristic.
The proposal would also replace the current rooflights at the property. While these are not in keeping with the traditional style of the dwelling in their own right, they are notably more discreet than the combination of the proposed dormer and larger rooflight. In addition, the current windows are similar in scale and positioning to other rooflights on this row of terraces such that replacing them with the proposal would cause a more notable distinction, further eroding the level of consistency along the roofscapes.
As a result of the proposal the traditional appearance of the dwelling would not be respected. The additional bulk to the roofscape would be out of place and would neither preserve or enhance the character or appearance of the CA. Accordingly, the proposal would cause visual harm to the CA and its significance as a designated heritage asset. However, the proposal would only be visible from a limited section of the CA. As such, this would equate to ‘less than substantial’ harm to the CA, having regard to the National Planning Policy Framework (the Framework). Nonetheless the Framework makes it clear that great weight should be given to the conservation of heritage assets.
Where such harm would be caused paragraph 196 of the Framework specifies that such harm should be weighed against the public benefits of the proposal. No such benefits have been presented by the appellant.
For all of these reasons I find that the proposal would have a significantly adverse impact on the character and appearance of the host dwelling and would fail to preserve or enhance the character or appearance of the CA. Accordingly, it would fail to comply with Policies CS8 and CS9 of [name] 2011, Policies DM2.1 and DM2.3 of Islington’s Local Plan: Development Management Policies June 2013, the SPD and the [name] which together seek to promote good design and preserve the character and appearance of the CA.
Section 06
Conclusion and Recommendation
Having had regard to all matters raised, I find that there are no material considerations that indicate the appeal should be determined other than in accordance with the development plan. For the reasons given above, I recommend that the appeal should be dismissed.
Section 07
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report, and, on that basis, I agree with the recommendation and shall dismiss the appeal.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 149No official casework-database value to compare
- Extracted decision date · page 1
- 5 July 2021Matches the official casework database
- Extracted site visit dates
- 1 June 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3269546
- Application reference
- P2020/3134
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Islington
- Planning authority code
- E09000019
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 1 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Yes
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 23 February 2021
- Valid date
- 23 February 2021
- Start date
- 28 April 2021
- Planning authority decision date
- 15 January 2021
- Appeal decision date
- 5 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 202
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21