Appeal 3270080
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a loft conversion with hip to gable and rear dormer with Ugust front velux roof lights.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the host dwelling and the surrounding area.
Section 05
Procedural Matters
The Council’s decision notice refers to Policies the London Plan (2016). These policies have now been superseded. Appeals must be determined in accordance with the policies in force at the time the decision is made. The policies of the London Plan (2021) have therefore been used in this recommendation. Parties were given the opportunity to comment on the updated position and these comments have been considered.
The Government published on 20 July 2021 a revised version of the National Planning Policy Framework. Accordingly, and in light of the reference made to the previous iteration of the Framework within the submitted evidence, the parties have been provided with a further opportunity to make submissions in respect of the publication. The comments which have been received have been considered in my assessment of this case.
Section 06
Reasons for the Recommendation
The appeal site comprises a two storey semi-detached dwelling in a residential area with a two-storey side extension and single storey rear extension. Immediately surrounding properties on this side of the street primarily consist of similar semi-detached dwellings. These share a level of consistency in style and design, albeit various extensions and alterations are visible from the street.
The proposal would remove the hipped roof element of the main dwelling, creating a gable end. This would significantly alter the roofline and would sit awkwardly alongside the hipped roof element of the pre-existing side extension. The roof is already stepped in nature and this addition would create a complex roof form when taken as a whole, that would not respect the character of the property and would result in a cramped frontage. It would also be contrary to the SPD1 which, although guidance rather than policy, remains a material consideration and does not support hip to gable conversions on the side of the house.
The dormer element of the proposal would also introduce extensive additional bulk. While set within the roof it would nonetheless span across a substantial proportion of it, causing significant alteration to the roofline. It would be a dominant feature that would not be proportionate to the overall scale of the dwelling, resulting in an uncharacteristic top heavy appearance.
Overall, the proposal would result in a form of property that would appear awkward and contrived. While the dormer would not be visible from [address], from the rear it would be viewed alongside the front elevation alterations, which would stretch taller and wider. This combination of elements would overwhelm the roofscape, resulting in a varied roof form that would appear visually jarring. It would significantly change the character, scale and form of the dwelling. In this sense it would not preserve or enhance the existing appearance of the property in line with the SPD. 10.It is acknowledged that the front facades in the street are varied, with other examples of gable conversions and rear dormers in the nearby vicinity. Irrespective of whether these have been constructed under permitted development rights, they are nonetheless features of the surrounding area that should be considered in assessing the character. However, each case is dealt with on its own site specific circumstances and it is the particular combination of the proposed dormer and gable conversion elements on an already extended dwelling that causes an unacceptable level of harm, even when taking surrounding development into account. 11.For the reasons given above I find that the development would be harmful to the character and appearance of the host dwelling and surrounding area. As such, it would fail to accord with Policy D3 of the London Plan (2021); Policies DH1 and DH(a) of the Royal Greenwich Local Plan Core Strategy with [name] (2014) and the SPD, which together seek to promote good design.
Section 07
Other Matters
The appellant has stated that the proposal could be constructed under permitted development rights. However, I have been provided with limited information on the nature of the permitted development (PD) rights or the 1 Royal Borough of Greenwich Supplementary Planning Document Residential Extensions, Basements and Conversions Guidance (2018) likelihood of these alterations being built, and therefore there is no evidence of a realistic fallback position. In addition, from the plans submitted it appears that the scheme built under PD would differ from the proposal in removing an additional hipped roof element. Limited weight is therefore attached to this argument.
Section 08
Conclusion and Recommendation
There are no material considerations that indicate the appeal should be determined other than in accordance with the development plan. For the reasons given above, I therefore recommend that the appeal is dismissed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report, and, on that basis, I agree that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 376No official casework-database value to compare
- Extracted decision date · page 1
- 10 August 2021Matches the official casework database
- Extracted site visit dates
- 17 June 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3270080
- Application reference
- 20/3571/HD
- Lead case reference
- Not recorded
- Planning authority
- Royal Borough of Greenwich
- Planning authority code
- E09000011
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 2 March 2021
- Valid date
- 2 March 2021
- Start date
- 11 May 2021
- Planning authority decision date
- 22 January 2021
- Appeal decision date
- 10 August 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 1603
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21