Appeal 3270225

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erection of single dwelling.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    It has been brought to my attention that the County Durham Plan (2020) (‘the CDP’) was adopted on 21 October 2020. The CDP replaces the Derwentside District Local Plan (1997). I must take into account the most relevant and up to date information in reaching a decision and I have therefore dealt with the appeal on this basis.

  3. Section 04

    [name]

    The main issues are: • the effect of the proposed development on highway safety; and, • whether the site is a suitable location for the proposed development having regard to accessibility to services and public transport.

  4. Section 05

    [name]

    The proposed dwelling would be constructed following demolition of an existing detached garage building located within the garden of [site address] . This garage has its own access to the highway which would be retained to serve the proposed dwelling with parking provided for two cars. A further access to the south of the appeal site and closer to the existing dwelling would continue as the access to [site address] .

    The existing vehicular access to the highway has extremely poor visibility largely due to its orientation with the highway, the rising land to the north, and the boundary walls around the site. As such it is likely that vehicles will need to pull out into the carriageway when exiting the access. The adjacent highway is relatively narrow and a sharp bend a short distance to the north has the effect of further reducing visibility in this direction at the point of access. This would be experienced by road users exiting and entering the site. This would be likely to lead to vehicles waiting in the highway, potentially causing an obstruction to traffic. On the site visit I saw that the road, whilst not busy, was well-used. Whilst the bend to the north is likely to slow vehicles down, the steep slope is likely to contribute to increasing vehicle speeds south past the access, which I experienced at the site visit. I have not been provided with any accident history associated with this access. Nevertheless, this does not change the existing situation, and whilst only one dwelling is proposed this would still increase its use which in turn would increase the highway risks associated with it.

    I have had regard to the appellant’s proposal to recess the walling piers that currently impede visibility, however even if this were carried out, the proximity of the bend to the north in particular would mean that visibility would still be extremely limited and consequently the proposal would still have a significantly harmful effect on highway safety.

    Policy 21 of the CDP is clear that all development proposals should ensure that vehicular traffic generated by the development can be safely accommodated on the local and strategic highway network. Given the existing conditions with the access to the appeal site which are not, for the reasons set out above, adequate in terms of accessibility and safety, the proposal would conflict with this policy. The development would therefore not be acceptable in terms of highway safety with regard to the access.

  5. Section 06

    Location

    The appeal site is located in a rural context to the north of Holmside, a small settlement with limited facilities including a village hall and a bus stop. Further afield are the larger settlements of Edmondsley and Sacriston (2.5 miles) which have better access to shops, services and public transport. The appellant has provided details of a bus service at [name] that is located around [address] from the appeal site, as well of a number of other facilities that are located further away.

    Consistent with the approach in paragraph 102 of the National Planning Policy Framework (‘the Framework’), Policy 21 of the CDP seeks, in summary, to focus development principally in accessible locations linked to existing services and facilities and where sustainable modes of transport are readily available. On the site visit I saw that accessing Holmside, the bus service at [name] and the larger settlements beyond on foot is not a welcoming prospect.

    Any future occupant of the appeal dwelling wishing to access the limited facilities or the bus stop in Holmside on foot would be required to walk along the narrow, sloping and unlit highway with limited verges that is subject to the national speed limit for a distance in excess of 200 metres before reaching streetlighting or footways. Accessing the bus service at [name] would require walking 800 metres along similarly unlit national speed limit roads. Future occupants of the appeal dwelling would be unlikely to view either route as safe or convenient which would discourage them from accessing public transport.

    Walking distances would increase significantly if accessing the facilities in Edmondsley, Sacriston or those provided by the appellant on foot and would require walking along undulating national speed limit roads without dedicated footways or streetlighting before reaching either settlement. Whilst these distances are likely to be more convenient to cyclists, cycling along unlit rural roads, particularly in the dark would not be a safe or convenient alternative to the private motor vehicle for most journeys.

    [name] am mindful that the Framework acknowledges that opportunities to maximise sustainable transport solutions will vary between urban and rural areas, for the above reasons, future occupants are unlikely to use sustainable modes of travel and as such would be highly reliant on private modes of transport, with resultant implications for emissions, in conflict with the general approach advocated by Policy 21 of the CDP set out above.

    I have had regard to several grants of planning permission that the appellant considers to be similar to the appeal proposal. However, I have not been provided with full details of the circumstances that led to these being approved, for example pre-existing development, permissions or the relevant policy context that applied at that time. In this respect, I note that both examples pre-date the formal adoption of the CDP. Nevertheless, I have assessed the appeal on its own merits.

    For the above reasons I conclude that the appeal site would not represent a suitable location for the proposed development and would therefore conflict with Policy 21 of the CDP and the provisions of paragraph 102 of the Framework.

  6. Section 07

    Other Matters

    I have also had regard to Policy 19 of the CDP, referred to by the appellant, which seeks to provide a suitable type and mix of housing on new housing developments. [name] note that the appeal property is indeed bespoke and would add to the mix of housing in the area, this carries limited weight in the overall planning balance and therefore does not override my findings with regard to the effect on highway safety and suitability of the location.

  7. Section 08

    Conclusion

    For the reasons given, having considered the development plan as a whole, along with all other relevant material considerations, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2No official casework-database value to compare
    Extracted decision date · page 1
    15 July 2021Matches the official casework database
    Extracted site visit dates
    15 June 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3270225
Application reference
DM/20/01573/FPA
Lead case reference
Not recorded
Planning authority
Durham County Council
Planning authority code
E06000047

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.09 hectares
Floor space
900 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
3 March 2021
Valid date
29 March 2021
Start date
13 April 2021
Planning authority decision date
7 October 2020
Appeal decision date
15 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
758
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
20 August 2026 at 16:25