Appeal 3270726
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
demolition of existing detached residential dwelling to facilitate construction of 3 new detached residential dwellings.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The application was submitted in outline with approval of access and layout sought. Other detailed matters relating to appearance, landscaping and scale are reserved for future consideration. I have determined the appeal on this basis.
Section 04
Main Issue
The main issue is the effect of the proposed development on the safe and efficient use of the highway.
Section 05
Reasons
The appeal site lies on the western edge of Northowram. It is accessed via a single lane access road that joins [address] in between 2 detached dwellings that front onto this road. [address] is a narrow road with a 20mph speed limit, a narrow footpath on its western side and no on-street parking restrictions apparent in the vicinity of the access road junction. During my site visit on a week day morning, I observed that [address] was relatively well used by pedestrians and that there was some on-street parking in the vicinity.
The access road is narrow along its whole length, with no specific provision made for pedestrians. On the basis of the evidence submitted and my own observations, it is clear that the visibility distances at the junction of the access road with [address] are significantly below the recommended stopping sight distances in Manual for Streets (MfS) and Manual for Streets 2 (MfS2). Vegetation within the garden of [address], cars parked within the front garden area of [address] and on-street parking further hinders visibility.
It would therefore be highly unlikely that a driver exiting the access road in a forward direction would have a full view of the road until after the vehicle has manoeuvred onto the footpath and then into the road. This is supported by what I viewed during my site visit and my own experience of exiting the access road. Vehicles on [address] may therefore have to stop or manoeuvre round vehicles exiting the access road. Furthermore, a driver is unlikely to have a full view of the footpath until after the bonnet of the car has left the access road and manoeuvred onto it, presenting a risk to pedestrians, especially small children.
Visibility would be even more difficult if reversing out of the access road onto [address]. This situation is a possibility given the narrow width and length of the access road and the position of the proposed passing place, and presents a concern whether it would occur on the frequency calculated by the appellant or on the greater frequency presented by the Council.
I acknowledge that the access road junction will already be used by vehicles associated with the existing properties. I also acknowledge the appellant’s submissions about vehicle speeds on [address] generally being within the 20mph speed limit during their survey period and the lack of recorded personal injury accidents in the vicinity of the appeal site. The absence of recorded accidents does not mean that the junction of the access road with [address] is necessarily safe. The characteristics of the junction and the highway in the immediate vicinity are such that it represents a significant risk to highway safety for road users and pedestrians and to the free flow of traffic, given the lack of visibility and the nature of the manoeuvring that would be required to avoid conflict between road users and pedestrians.
The appellant and the Council presented different views on the likely traffic generation from the proposed development. I agree with the Council that the appellant’s figures appear to be quite low, especially given that the application form indicates that two parking spaces would be provided for each dwelling. The intensification of the junction’s use, even if this was the relatively limited increase in traffic presented by the appellant, does not provide adequate justification to further exacerbate the risk to highway safety.
The provision of a passing place on the access road would provide some improvement to the current situation. However, whilst this element weighs in support of the proposed development, it is not sufficient to outweigh the harm that I have identified.
The visibility splays at the junction of the access road with [address] are significantly below the minimum value in MfS and MfS2. I have taken account of the evidence presented by the appellant as to why this would not present an unacceptable risk to highway safety. However, my view is that the proposed development would have inadequate access arrangements, and notwithstanding the speed of vehicles on [address], the lack of recorded personal injury accidents in the vicinity and the number of vehicle movements, this would present an unacceptable risk to the safety of road users and pedestrians and to the free flow of traffic.
The appellant has drawn attention to an appeal decision1 which the appellant stated considered similar highway safety issues. In that case, the appeal was allowed. Based on the evidence before me, the particular circumstances of that development are not directly comparable to this appeal proposal, given the 1 Appeal reference APP/A4710/W/20/3249928 number of dwellings proposed and the different intensification of use of the access road and junction that would result. Therefore, a comparison is of limited relevance in this instance. I have determined this appeal on its own planning merits.
The appellant states that driveways for the properties on [address] in the vicinity of the appeal site have lower levels of visibility than the access road, vehicles from these properties will have to reverse on to [address], and this has not resulted in safety issues. Whilst this may be the case, it does not provide sufficient justification to allow the intensification of a junction that would give rise to the highway safety concerns identified above.
As such, the proposed development would have an unacceptable impact on highway safety and on the efficient use of the highway. The proposed development would therefore conflict with Policy BE5 of the Calderdale Council Replacement Calderdale Unitary Development Plan 2006 (the UDP), which requires that accesses ensure the safe and free flow of traffic (including the provision of cyclists) in the interests of highway safety. It would also conflict with paragraph 109 of the National Planning Policy Framework (the Framework), which states that development should be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety.
Section 06
Other Matters
The evidence indicates that the Council cannot demonstrate a 5-year supply of deliverable housing sites. As a result, the ‘presumption in favour of sustainable development’ at paragraph 11d) of the Framework is relevant.
I have not identified any relevant Framework policies protecting areas or assets of particular importance that would provide a clear reason for refusing the proposed development.
At the time of determining the application, the Council could demonstrate a 2- year housing supply. This is a large shortfall and therefore has considerable weight in favour of the proposed development. There would also be social and economic benefits such as construction employment and additional residents supporting local shops, businesses and community facilities. However, with a net addition of 2 dwellings, these benefits would be limited and as such have limited weight.
Paragraph 109 of the Framework advises that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. I have found that there would be an unacceptable impact on highway safety as a result of the proposed development. I acknowledge the benefits of the proposed development, including the positive contribution to housing supply in a sustainable location. Nevertheless, the harm that I have identified to the safe and efficient use of the highway is such that it outweighs the benefits, notwithstanding the shortfall in housing supply.
Consequently, the adverse impacts of the proposed development would significantly and demonstrably outweigh its benefits when assessed against the policies in the Framework taken as a whole. Therefore, the proposal would not represent sustainable development.
I have had regard to the concerns raised by interested parties, which, in addition to the above matters, relate to wear and tear on the access road from construction vehicles, obstruction caused by construction traffic and additional car parking. Retention of a turning circle and the introduction of parking restrictions on [address] was also mentioned. [name] find the proposed development unacceptable for other reasons, these considerations would not alter my decision.
Section 07
Conclusion
The proposed development would significantly harm the safe and efficient use of the highway and would conflict with the development plan taken as a whole. There are no material considerations that indicate that the decision should be made other than in accordance with the development plan. Therefore, for the reasons given, I conclude that the appeal should not succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 194No official casework-database value to compare
- Extracted decision date · page 1
- 2 July 2021Matches the official casework database
- Extracted site visit dates
- 15 June 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3270726
- Application reference
- 19/01499/OUT
- Lead case reference
- Not recorded
- Planning authority
- Calderdale Metropolitan Borough Council
- Planning authority code
- E08000033
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Outline
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.2004 hectares
- Floor space
- 360 m²
- Number of residences
- 2
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 10 March 2021
- Valid date
- 10 March 2021
- Start date
- 12 April 2021
- Planning authority decision date
- 11 September 2020
- Appeal decision date
- 2 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 124
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25