Appeal 3270922
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Prior approval for proposed change of use of existing poultry buildings to 3no larger dwelling houses and 2no smaller dwelling houses (use class C3) and associated operational development under class Q(a) and (b).
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
I have taken the description of development from the Council’s decision notice as it is more concise than that used on the application form.
Section 04
Main Issue
The main issue is whether the proposed change of use constitutes permitted development under the provisions of Schedule 2, Part 3, Class Q of the GPDO, with regard to the extent of building operations proposed.
Section 05
Reasons
The proposal relates to two long poultry buildings. A large part of both buildings would be demolished. The remaining part of the eastern building would be truncated to form two detached dwellings. The remaining part of the western building would be truncated to form three detached dwellings.
The GPDO states at paragraph Q.1. (i) that development under Class Q (b) is not permitted if it would consist of building operations other than the installation or replacement of windows, doors, roofs or external walls, to the extent reasonably necessary for the building to function as a dwelling. The permitted development right also includes partial demolition to the extent reasonably necessary to carry out such building operations. The planning practice guidance clarifies that the permitted development right assumes that the agricultural building is capable of functioning as a dwelling. It also states that it is not the intention of the permitted development right to allow rebuilding work which would go beyond what is reasonably necessary for the conversion of the building to residential use1.
The works required to convert the buildings into dwellings would be very significant. The amount of demolition is extensive and would require the construction of new south facing walls to units 3 and 4. Where the existing buildings would be truncated 6 further external walls would need to be constructed. I accept that it may be possible for the walls to be formed in a lightweight material built up off the existing concrete base without a foundation. However, all 8 new walls would be wide, spanning the broad gable width of the existing buildings which, in combination with the demolition of a large part of both buildings, would represent a significant amount of building work. The result would be five detached buildings, of rather odd proportions, that would bear no meaningful resemblance to the simple functional form of the existing poultry buildings.
With this in mind, I am not satisfied that the extensive works proposed demonstrate that the existing buildings are capable of functioning as dwellings without significant intervention, or that the works proposed are limited to those reasonably necessary for a residential conversion. The works would exceed what could reasonably be described as a conversion scheme and would instead be tantamount to the full redevelopment of the site.
Therefore, the proposed change of use would not satisfy the requirements of Schedule 2, Part 3, Class Q of the GPDO, having regard to the associated guidance within the planning practice guidance, and therefore is not development permitted by it.
Section 06
Conclusion
For the reasons above, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 77No official casework-database value to compare
- Extracted decision date · page 1
- 8 July 2021Matches the official casework database
- Extracted site visit dates
- 30 June 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3270922
- Application reference
- 20/2424/PDQ
- Lead case reference
- Not recorded
- Planning authority
- East Devon District Council
- Planning authority code
- E07000040
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.15 hectares
- Floor space
- 650 m²
- Number of residences
- 5
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 12 March 2021
- Valid date
- 12 March 2021
- Start date
- 21 April 2021
- Planning authority decision date
- 14 January 2021
- Appeal decision date
- 8 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 402
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25