Appeal 3271164
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
replace two front to back parking spaces with two side by side parking spaces including associated excavation works and extending the dropped kerb. To also include two curved walls to surround the parking spaces and infrastructure for [name].
Section 02
Decision
The appeal is allowed and planning permission is granted to replace two front to back parking spaces with two side by side parking spaces including associated excavation works and extending the dropped kerb. To also include two curved walls to surround the parking spaces and infrastructure for [name] at [address], [site address] in accordance with the terms of the application, Ref 20/02253/HHOLD, dated 17 October 2020, subject to the conditions set out in the attached schedule.
Section 03
[name]
The main issues are: a) the effect of the proposal on the character and appearance of the appeal property and the wider area; and b) the effect on biodiversity.
Section 04
Reasons
No [site address] is a locally listed building. This attractive, double-fronted period property is elevated above the street behind a grass bank. The bank was unkempt at the time of my visit, with uneven ground levels, overgrown grass and some of the land in use for the temporary storage of building materials. I understand that prior to 2015 there was a pathway and set of steps leading up to the front door. Parking for the property is on a sloping driveway at the northern end of the site frontage. This can accommodate 2 cars in a tandem arrangement, dependent on vehicle length, but the steep gradient makes it more convenient to use for a single car.
The proposal is to relocate the parking to the centre of the site frontage. The new hardstanding would be wide enough for two vehicles to park side by side. The surfacing would slope gently upwards away from the road and there would be a retaining wall, ranging between 1.0 m and 1.2 m in height and slightly raked, to the rear. This would curve around the sides to meet a brick wall at the back edge of the pavement. A short section of this wall at the northern end of the site frontage would be new. Each of the new parking spaces would be provided with an electric vehicle charging point.
The Council has concerns over the appearance of the new hardstanding and retaining walls. However, the walls would be modest in height and this means that they would not dominate the site frontage. The plans show soft landscaping surrounding the parking spaces and this would provide some visual relief. The attractive building façade would remain the primary focus above the parked cars – these cars would be less prominent than a vehicle parked on the existing elevated driveway. I therefore consider that the proposal would not harm the setting of No 61 as a locally listed building.
Most of the houses along this stretch of [address] have parking to the front of the dwelling. This includes a number of period properties where construction of parking areas has involved excavation. The Council advises that the works to the frontage of [address] at [address] were carried out without planning permission around twenty years ago. If that is the case, it is likely that they will be immune from enforcement action. Bearing in mind the urban character of the surrounding area, and the nature of other driveways in the vicinity, I do not consider that the proposal would be detrimental to the wider street scene.
Particular concerns are raised over the use of flint for the retaining walls. The Conservation Officer contends that this material is out of character with the green sand ridge location, but the Reigate and Banstead Local Distinctiveness Guide (2004) does not preclude its use in Redhill. Furthermore, I note that the original front path was flanked on either side by flint walls. Given this precedent, the principle of using flint for the low retaining walls is acceptable.
I turn now to the second main issue. There is no substantive evidence to demonstrate that the existing grass bank has any particular biodiversity value. Even in its previous guise as a manicured front lawn it is unlikely that there would be any significant wildlife interest. The proposed soft landscaping would provide some limited opportunities for enhancing biodiversity.
Accordingly, I conclude that the proposal would not cause material harm to the character and appearance of the appeal property, the street scene or biodiversity interests. There would be no conflict with Policies NHE9 and DES1 of the Reigate and Banstead Local Plan Development Management Plan 2019 insofar as they seek to protect heritage assets and secure high quality design that makes a positive contribution to the character and appearance of its surroundings.
Section 05
Conditions
In addition to the standard commencement condition, I have attached a condition specifying the approved plans to provide certainty. I have considered whether pre-commencement conditions are necessary in relation to materials. The appellant has indicated that the walls would be constructed using concrete blocks and faced with knapped flint, with reclaimed bricks used from elsewhere on the site (as per a section of wall which has already been rebuilt at the southern end of the site frontage). I noted the stockpile of reclaimed bricks during my site visit. This information gives me confidence that the finished appearance of the walling would be acceptable without the requirement for any further approval process under a planning condition. The Council’s suggested condition in respect of brick bond is necessary and reasonable, and I note this is accepted by the appellant.
I have also considered whether it is necessary to seek details of the planting surrounding the proposed parking area. Such details have not been suggested by the Council and I am minded to accept the appellant’s view that this level of detail would be too prescriptive.
The Highway Authority has requested a condition to secure visibility zones but this is not necessary as the sightlines for drivers exiting the site would be adequate and comparable with other driveway entrances in the locality. Planning permission would be required to increase the height of the walls either side of the entrance to the parking area.
Section 06
Conclusion
For the reasons given above I conclude that the appeal should be allowed.
Section 07
SCHEDULE OF CONDITIONS
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Location Plan • Site Levels – Proposed and Existing • Block Plan – Proposed Development • [name] • [name] – Proposed • Cross Section A through existing and proposed front path • Cross Section B – Proposed • Cross Section C
All brick bond shall be Flemish garden wall bond or Flemish bond to match existing. *** END ***
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 106No official casework-database value to compare
- Extracted decision date · page 1
- 4 November 2021Matches the official casework database
- Extracted site visit dates
- 20 September 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3271164
- Application reference
- 20/02253/HHOLD
- Lead case reference
- Not recorded
- Planning authority
- Reigate and Banstead Borough Council
- Planning authority code
- E07000211
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- No
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 16 March 2021
- Valid date
- 16 March 2021
- Start date
- 25 May 2021
- Planning authority decision date
- 15 January 2021
- Appeal decision date
- 4 November 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 5565
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21