Appeal 3271346
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a new dwelling.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
The application has been submitted in outline with all matters reserved for future consideration except access. I have dealt with the appeal on that basis, treating the submitted plans as being indicative apart from the access.
The appellant contends that the Environment Agency (EA) [name] are not consistent with the situation on the ground and has been in communication with the EA regarding a review of the geographical extent of the [name] in the area. Any alterations to the [name] is a matter for the EA and outside of the scope of this appeal. In determining this appeal I must have regard to the published evidence of the [name] currently contained in the [name] produced by the EA.
Section 04
[name]
The main issues are: • Whether the appeal site is a suitable location for the proposed development having regard to the risk of flooding; and • Whether an acceptable form of development could be achieved, with particular regard to its relationship to a protected tree and implications for the outlook and provision of adequate private garden space for its occupiers.
Section 05
Flood risk
Parts of the appeal site are located in [name] 2 and [name] 3 as determined by the EA’s published flood risk mapping. The appellant’s [name] Assessment1 (FRA) states that the dwelling would be positioned wholly within [name] 2. However, the precise scale and layout of the proposed dwelling remains uncertain at this stage.
Policy ENV6 of the East Riding Local Plan Strategy Document 2016 (Local Plan) sets out that flood risk will be managed to ensure that development does not result in unacceptable consequences to its users, the wider community, and the environment. The risk of flooding to development will be managed by applying a [name] to ensure that development is steered towards areas of lowest risk, as far as possible. This is consistent with the approach of the National Planning Policy Framework (the Framework) and the Planning Practice Guidance (PPG) sections on flood risk.
The PPG advises that, in applying the [name], the aim is to steer new development to [name] 1, these being areas with a low probability of flooding. Only where there are no reasonably available sites in [name] 1 should sites in [name] 2 be considered. If the [name] demonstrates that it is not possible for development to be located in zones with a lower risk of flooding the [name] may have to be applied.
Although the submitted FRA includes a brief section on the [name], there is no information regarding detailed site analysis or specific evidence related to any other sites from which it would be possible to consider if the appeal site would be sequentially preferable. Nor is there justification why the [name] should be confined just to the village of Bielby, as the FRA appears to suggest.
The PPG sets out that the area to apply the [name] across will be defined by local circumstances relating to the catchment area for the type of development proposed. The Council refers to its Flood Risk Guidance Note, which indicates that the search area for the [name] should be the relevant [name] sub area, in this case the Wolds sub area. I have no details before me to indicate that an alternative area of search had been agreed or is appropriate in this case. The Council states that there are a number of housing allocations within the Wolds sub area, as well as windfall sites which are at a lower risk of flooding than the appeal site. This has not been contested.
Consequently, it has not been demonstrated that the requirements of the [name] have been passed. The Sequential Test must be passed before the [name] can be applied. It is therefore not necessary for me to go on to consider whether the [name] is met.
I have noted that the EA and the Council’s Land Drainage Team have no objection to the conclusions of the FRA that suitable mitigation measures can be incorporated and could be the subject of appropriate conditions. I have also had regard to the photographs of a previous flooding event which did not affect the appeal site. The appellant suggests that these factors should be given greater weight in decision making. However, the fact that the site has not flooded previously is not evidence that it could not flood in the future. Moreover, that the development could be made flood resilient and resistant, does not negate the need to firstly pass the Sequential and Exception tests set 1 by [name], dated 21 May 2020 out in national and local planning policy to establish whether the proposal is acceptable in principle on flood risk grounds.
The appellant has provided correspondence with the EA which indicates that there is updated flood modelling for the area programmed for release in 2022-2023. However, as set out in the procedural matters above, until this is finalised and formally published, I must make a decision based upon the current EA flood risk classification. Should this position change in the future it would be open to the appellant to consider whether or not to submit a new planning application to the Council based upon a change of circumstances.
I therefore conclude that it has not been demonstrated that the appeal site is a suitable location for the proposed development having regard to the risk of flooding. The proposal would conflict with the requirements of Local Plan Policy ENV6 and paragraphs 155 and 158 of the Framework, which seek to steer new development to areas with the lowest probability of flooding.
Section 06
Relationship with a protected tree and outlook and privacy
I appreciate that the form of the development is indicative, but it is still reasonable to consider whether an acceptable development as described in the proposal could be achieved.
The appeal site is part of the front garden of Burgundenau. Neighbouring properties also lie to the north and south with boundaries formed by conifer hedging. At the front of the site is a large [name] tree, which is protected by a Tree Preservation Order. The tree has a wide and dense canopy which attractively overhangs the garden down to the ground.
I have had regard to the appellant’s arboricultural reports. The developable area of the site is clearly influenced by the need to avoid conflict with the Root Protection Area of the protected tree. This would inevitably push the location of the dwelling towards the middle of the site and in close proximity to the existing dwelling. Whilst the internal layout and window positions could be carefully designed to avoid views between habitable windows, close overlooking of the rear garden from the upper floor windows of the existing dwelling would be unavoidable. I acknowledge that there would likely also be a garden area at the front of the site. However, the tree canopy and shading would limit its attractiveness and useability as a main garden space, and would not therefore adequately compensate for the poor level of privacy that would be experienced within any rear garden space.
The Council has also raised concerns over the effect of the protected tree on the outlook and ambient light to any west facing windows. The size and location of the tree is such that these concerns are understandable, particularly as the constraints posed by the boundary hedge and windows in neighbouring properties mean this is likely to be a primary elevation. Even if not affecting trees directly, development layouts may not be acceptable if they would result in pressure for felling or unsightly, heavy pruning of retained trees in the future. Indeed, the appellant confirms that consent has already been granted to lift the crown of the tree. Whilst this may assist in improving the outlook and available light to the dwelling initially, it would have to be carried out on a regular basis. Moreover, even with such pruning works and other means of introducing light to affected rooms, the tree would still be a dominant presence within the front of the site. The shape of the site means that the potential to move the dwelling further within the site to avoid the outlook being significantly compromised by the tree is very limited.
Overall, I am not satisfied that an acceptable form of development could be achieved on the site, with particular regard to its relationship to a protected tree and implications for the outlook and provision of adequate private garden space for its occupiers. This would be detrimental to the living conditions of the occupiers of the development.
Therefore, notwithstanding the outline nature of the application, I find conflict with Local Plan Policy ENV1 in so far as it seeks to ensure development has regard to the amenity of existing or proposed properties. It would also be contrary to paragraph 127(f) of the Framework, which requires a high standard of amenity for existing and future users.
Section 07
Conclusion
I have come to my conclusion having regard to the importance that the government places on boosting the supply of housing, locating and building sustainably, and making effective use of land. I have also had regard to third party representations made in support of the proposal. However, the public benefits would be limited by the modest scale of the proposed development and would not outweigh the identified harm and conflict with the development plan and the Framework when taken as a whole.
Accordingly, and for the reasons given above, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 597No official casework-database value to compare
- Extracted decision date · page 1
- 9 July 2021Matches the official casework database
- Extracted site visit dates
- 24 June 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3271346
- Application reference
- 19/02963/OUT
- Lead case reference
- Not recorded
- Planning authority
- East Riding of Yorkshire Council
- Planning authority code
- E06000011
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- 5. Refuse approval of the matters reserved under an outline planning permission
- Appeal reason
- Refusal - Reserved Matters
- Type detail
- Planning Appeals - Outline
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.5 hectares
- Floor space
- 100 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 18 March 2021
- Valid date
- 9 April 2021
- Start date
- 4 May 2021
- Planning authority decision date
- 15 December 2020
- Appeal decision date
- 9 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 494
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25