Skip to main content
Official casework recordDismissedCurrent release

Appeal 3271481

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as follows “8ft x 8ft with 8ft ridge height Tool shed with covered log store either side, this has been erected for ongoing forestry management works.”

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matters

    The application form states that the works were completed in October 2020. However, the appellant explains that the building was demolished following the Council’s refusal of permission. On my site visit, I observed that the tool shed had been removed from the site, but that a covered log store remained. Therefore, I am considering this appeal as a part-retrospective development.

  3. Section 04

    [name]

    The main issues are: • whether the development adheres to the Council’s strategy for development in the countryside, in the context of adopted policy; and • the effect of the development upon the character and appearance of the area.

  4. Section 05

    The Council’s strategy for development in the countryside

    The site forms part of a large woodland area within the countryside known as [site address] , which is an area of designated Replanted Ancient Woodland located to the north of [name]. [site address] has recently been subdivided into woodland lots, which have been sold as separate parcels of land. The appeal site is known as ‘[name] and compromises of a 2.02ha area of woodland located in north-west corner of [site address] , near to the A434 road.

    It is proposed to erect a tool shed with a covered log store either side at [name]. The submitted plans show that the building would measure approximately 9.6m in width, which would comprise of a 4.8m log store section, a 2.4m wide shed and a 2.4m log store section. The building would be 2.4m deep and 2.4m high.

    Policy COM2 of the Test Valley Borough Revised Local Plan DPD: Adopted Local Plan 2011-2029 (the ‘LP’) states that “Development outside the boundaries of settlements in the hierarchy will only be permitted if: (a) it is appropriate in the countryside, as set out in Revised Local Plan policy COM9-COM15, LE10, LE16- 18 or; (b) it is essential for the proposal to be located in the countryside”.

    Paragraph 5.49 of the LP, which forms part of the supporting text of Policy COM2, explains that in some cases it is essential for a development to be located in the countryside. For example, occupational accommodation or the re-use of buildings.

    The Council explain that none of the policies set out within criterion (a) of Policy COM2 are relevant to the proposal. This has not been disputed by the appellant. Consequently, it is necessary to determine whether the proposal would satisfy the requirements of criterion (b) of Policy COM2.

    In this instance, the appellant explains that the proposed building would be used for on-going forestry management works associated with [name]. Whilst this may be the case, no substantive evidence has been put forward by the appellant to demonstrate that the erection of the proposed building is an essential requirement associated with the management of [name].

    For instance, no technical information has been provided to demonstrate that the extent of deforestation and other forestry works necessary to support a large log store and tool shed would occur at the site. Indeed, the woodland plot is relatively small at 2.02ha and lies within an Area of Replanted Ancient Woodland. In such areas, the Council explain that a large amount of storage for logs is unlikely to be required.

    The appellant has drawn my attention to a similar development located within [site address] . The Council explain that the building was constructed as permitted development, pursuant to an application1 for prior approval which was made to the Council by virtue of the provisions of Schedule 2, Part 6, Class E of the Town and Country Planning (General Permitted Development) (England) Order 2015 (the ‘GPDO 2015’). This has not been disputed by the appellant.

    However, I am not aware of the particular circumstances in relation to this case. Nevertheless, given that the principle of development was established by the GPDO 2015, in determining whether the proposed works were permitted development, the issue of whether or not the development would be in accordance with LP Policy COM2 was not a matter for the Council’s consideration.

    In the absence of any substantive evidence, I am unable to conclude that it is essential for the proposal to be located in the countryside. Consequently, I cannot conclude that the proposal would accord with Policy COM2 of the LP. 1 Council Ref: 20/01878/AGNN

  5. Section 06

    Character and appearance

    Rural woodlands, including Replanted Ancient Woodland, such as [site address] , are predominately devoid of buildings and the lack of structures contributes to the intrinsic character and beauty of the countryside.

    The proposed development would be situated within [name], away from the woodland edge. However, on my site visit, I observed that the structure would be partially visible from a Public Right of Way (PRoW), which runs along the northern edge of [name]. Consequently, the presence of the building would be readily perceived by users of the PRoW, and, when viewed in the context of the surrounding woodland, the tool shed and log stores would appear as an incongruous and unduly prominent form of development.

    As such, I conclude that the proposed development would cause significant harm to the character and appearance of the area. Therefore, the proposal would not accord with Policy E1 of the LP which states that development should be of a high quality in terms of design and should integrate, respect and complement the character of the area in which the development is located in.

    The appeal site is located within the North Wessex Area of Outstanding Natural Beauty (the ‘AONB’). Given the minor nature of the proposed development, and, taking into account the fact that the harm which would arise to the character and appearance of the area would be localised, I am satisfied that the proposal would conserve the landscape quality and natural beauty of the AONB. Nevertheless, a lack of harm in respect of the AONB, is a matter of neutral consequence and does not carry weight in favour of the proposal.

    The appellant explains that they have made improvements to the PRoW footpath, which benefit the character and appearance of the area. Whilst this may be the case, these works do not form part of the current proposal. Therefore, this is not a determinative point in this appeal.

  6. Section 07

    Other Matters

    I note that no objections were made by the Parish Council. However, this does not alter my conclusions on the main issues.

    The appellant explains that they were advised by the former landowners that they could erect a building for forestry purposes at the site and then retrospectively notify the local planning authority to register the building under permitted development. However, this is not the case, [name].2.(1)(a) of Schedule 2, Part 6, Class E of the GPDO 2015 states that “the developer must, before beginning the development, apply to the local planning authority for a determination as to whether the prior approval of the authority will be required as to the siting, design and external appearance of the building”. If the appellant was given incorrect professional advice, this is a separate legal matter, which falls outside of the scope of this appeal.

  7. Section 08

    Conclusion

    For the reasons given above, and having regard to all other matters raised, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 95No official casework-database value to compare
    Extracted decision date · page 1
    5 July 2021Matches the official casework database
    Extracted site visit dates
    16 June 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3271481
Application reference
20/02731/FULLN
Lead case reference
Not recorded
Planning authority
Test Valley Borough Council
Planning authority code
E07000093

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
2.02 hectares
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
21 March 2021
Valid date
12 April 2021
Start date
23 April 2021
Planning authority decision date
11 February 2021
Appeal decision date
5 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
232
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
20 August 2026 at 16:25