Appeal 3271546
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of ground floor rear infill extension and first floor rear extension.
Section 02
Decisions
The appeal is dismissed. Appeal B Ref: APP/U5360/D/21/3271549
The appeal is allowed and planning permission is granted for erection of ground floor rear infill extension and first floor rear extension and roof extension over at [site address] , Hackney, London [postcode] in accordance with the terms of the application, Ref 2021/0075, dated 12 January 2021, and the plans submitted with it, subject to the conditions set out in the attached schedule.
Section 03
Procedural Matters
The application relating to Appeal A did not have a description of development on the application form. I have therefore taken the description from the Council’s decision notice and the appeal form. Appeal Decisions APP/U5360/D/21/3271546, APP/U5360/D/21/3271549
In the period since the appeal was submitted the Government has published a revised version of the National Planning Policy Framework (The Framework). Also, since the submission of the appeal the Mayor of London has published the adopted London Plan 2021 (LP2021). This replaces the London Plan 2016 which is referred to in the appeal documentation. As an adopted plan I must consider the policies of the LP2021. However, in respect of this appeal, Policy D3 is the principal relevant policy and this largely covers similar points to former Policies 7.4 and 7.6 in the London Plan 2016. Neither the new policy in LP2021 nor the revised Framework have brought me to any different decision on the appeal and therefore I have not considered it necessary to invite the appeal parties to comment on the new documents.
Section 04
Main Issue
The main issue in respect of both appeals is the effect of the proposed developments on the character and appearance of the host building and its surroundings on [name].
Section 05
Reasons
The north side of [name] where the appeal site is located is characterised by large, detached and semi-detached 2 storey houses constructed in brick and render under tiled roofs. The houses are set back from the road in generously sized plots. No 134 and its immediate neighbours have prominent twin gabled bay detailing on the front elevation but otherwise the forms of the buildings are different particularly at roof level with No 134 having a pyramidal main roof.
To the rear, No 134 and its neighbours have existing ground floor extensions. Appeal proposals A and B both would infill the section on the east side of No 134’s existing ground floor extension making it full width and would construct a full width first floor extension extending out about 2.2 metres from the rear wall of the main house over the ground floor extension. The difference between the proposals in A and B is that in Appeal B this first floor extension would be covered by an extended section of the main roof. It has been put to me that Appeal B was submitted with the main purpose of improving the appearance of the design of the extension at first floor level.
In respect of the ground floor infill extension, it is not a matter of dispute between the parties that the proposal would be acceptable. The Hackney Residential Extensions and Alterations Supplementary Planning Document (SPD) would allow full width ground floor extensions on detached houses. Although it refers to a maximum depth on rear extensions to detached houses of 4 metres, this advice predates the change to Permitted Development which allows deeper extensions subject to [name]. In any event, the proposal would not extend any further in depth than the existing extension, would be smaller in depth than the rear extension on the neighbouring house at No 136 and would replace a smaller pitched roof and lean to structure at the east end of the building. So, in floorspace terms, the actual increase would be very small. As the proposal would continue the design and materials of the existing rear ground floor extension the result would be a more coherent ground floor elevation and an improvement in the appearance of the existing rear of the house. Appeal Decisions APP/U5360/D/21/3271546, APP/U5360/D/21/3271549
Turning to the matter of the proposed first floor extension, I accept that at present there does not appear to be any similar first floor extensions in the immediate vicinity. Whilst it has been put to me that the properties on this side of [name] share a common rear building line this is not in fact the case. The main house at No 132 projects just over a metre beyond the rear elevation of No 134 and has a very large, obtrusive, full-width box dormer roof extension on the rear of the property which also wraps round onto the side elevation. Nos 138 and 140 [name] are positioned slightly further forward in their plots thus the rear building line is not consistent.
However, I accept that the first floor flat roof extension tucking in just under the eaves line of No 134 as proposed in the Appeal A proposal would appear awkward in the context of the main house. It would appear to dominate the rear elevation and would be out of keeping with the treatment of high level roofs in the vicinity. It would conflict with the advice in the SPD that rear extensions should be subordinate by terminating a storey below the eaves line.
For the above reasons Appeal A would conflict with the policy objectives of the LP2021 Policy D3 which requires development to respond to the existing character of a place and be of high quality, with architecture that pays attention to detail. It would also conflict with Hackney Local Plan 2033 (HLP) Policy LP1 which requires all development to be of the highest architectural and urban design quality and to respond to local character and context and be compatible with existing townscape.
By contrast the design in Appeal B, incorporating the first floor extension within the house by extending the roof, would appear a much more integrated design solution. It has been put to me that this would disrupt the building line along the rear of the properties but, as stated above, this is not uniform. The extended roof and first floor would only be approximately 1 metre deeper than No 132 and would have significantly less mass at a high level than the dormer roof extension on that property. Moreover, in the context of significantly different roof designs across the roofscape of Nos 132, 134, 136 and 138 and in particular the large rear and side box dormer at number 132 the slight deepening of the roof on No 132 would not be obtrusive. Viewed from both the rear and sides the modest extension to the roof would remain proportionate to what is a large, detached house. The general principles in respect of two storey extensions of maintaining proportionality and ensuring the extension would not appear over dominant viewed from neighbouring gardens set out in the SPD would therefore be achieved. The plot size also has ample depth to accommodate the proposal.
Admittedly, the roof form would change from a pyramidal, hipped design to incorporate a short ridge on a north/south axis but, although this slightly extended ridgeline would be visible from the street, no other part of the extension would be. The roof pitches and materials would be identical to the existing and the overall impact on the character and appearance of the property would therefore be minimal.
As such the Appeal B proposal would not harm the character and appearance of the host dwelling and its surroundings and would conform with the policy objectives of LP2021 Policy D3 and HLP Policy LP1 and the guidelines in the SPD. Appeal Decisions APP/U5360/D/21/3271546, APP/U5360/D/21/3271549
Section 06
Conclusion and Conditions
I have considered the matters before me in respect of both Appeals and, for the reasons given above, I conclude that Appeal A should be dismissed due to the harm to character and appearance of the host dwelling but that Appeal B should be allowed and permission granted for the ground first and roof extension subject to the conditions set out in the schedule of conditions below.
The Council suggested standard conditions, which I have considered in the light of the advice in the Framework and Planning Practice Guidance. A condition requiring development to be carried out in accordance with the submitted plans is necessary in the interest of certainty. The Council also proposed the standard matching materials condition. This is necessary to ensure the character of the house and surrounding area is protected. Finally, because the house is in an area at risk from surface water flooding it is important that the proposal utilises sustainable drainage solutions to reduce this risk and I attach the condition proposed by the LLFA.
The development hereby permitted shall begin not later than three years from the date of approval.
The development hereby permitted shall be carried out in accordance with the Planning Statement and the following approved plans: CC.134.PR.201; CC.134.PR.202; CC.134.PR.203; CC.134.PR.204; CC.134.PR.205
The materials to be used in the construction of the external surfaces of the ground and first floor extensions and roof extension to the development hereby permitted shall match those used in the existing dwelling.
Prior to superstructure works, detailed specification and a drainage layout of at least one suitable sustainable drainage system (i.e. water butt, raingarden, bioretention planter box, living roof, permeable paving etc.) shall be submitted to, and approved by the LPA, in consultation with the LLFA. If soakaways (i.e. plastic modules and soakaway rings are used), an infiltration test must be carried out to ensure that the capacity of the soil is suitable for infiltration. It must be demonstrated that there will be no increase in surface water flow being discharged offsite and an overall reduction in peak flow rate and volume for all return periods up to the 1 in 100 year storm events plus an allowance for climate change. Thereafter the extension shall be constructed in accordance with the approved drainage details.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 566No official casework-database value to compare
- Extracted decision date · page 1
- 15 September 2021Matches the official casework database
- Extracted site visit dates
- 27 August 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3271546
- Application reference
- 2020/3563
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Hackney
- Planning authority code
- E09000012
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Lead
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 100 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- No
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 22 March 2021
- Valid date
- 22 March 2021
- Start date
- 3 June 2021
- Planning authority decision date
- 12 January 2021
- Appeal decision date
- 15 September 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 3202
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21