Skip to main content
Official casework recordDismissedCurrent release

Appeal 3271590

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erection of 9 dwellings.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The appeal proposal is for a Permission in Principle (PIP). In accordance with the Planning Practice Guidance (the Guidance) and the Town and Country Planning (Permission in Principle) (Amendment) Order 2017 (the Order), this is an alternative way of obtaining planning permission for housing-led development, which separates the consideration of matters of principle for the proposed development (first stage) from the technical detail (second stage).

    The Guidance states that the scope of a PIP application is limited to location, land-use and the amount of development, and that other matters should be considered at the technical details consent stage. It confirms that local authorities cannot list the information they require for applications for permission in principle in the same way they can for applications for planning permission.

    The Guidance also confirms that, following a grant of a PIP, the site must receive a grant of [name] (TDC) before development can proceed, and that other statutory requirements may apply at this stage, such as those relating to protected species.

    For the avoidance of doubt, the appeal proposal is at the first stage. In respect of residential development, an applicant can apply for a PIP for a range of dwellings by expressing a minimum and maximum net number of dwellings as part of the application. In this instance, permission in principle has been sought for a minimum of one and a maximum of 9 no. dwellings on the appeal site. I have determined the appeal on that basis, having regard to the requirements of the above referenced Order and the Guidance.

  3. Section 04

    Main Issue

    The main issue is whether the site is suitable for residential development, having regard to its location, the proposed land use and the amount of development.

  4. Section 05

    Location and proposed land use

    The appeal site is situated on the A268 [address] in-between New England Lane and [address], on the edge of Rye where the adjoining village of Playden begins. Given the proximity of existing buildings and the enclosure by vegetation, the site is not a significant part of the adjoining countryside. However, it acts as a transition space between denser suburban housing to the south and west and more spacious and semi-rural housing to the north and east. For the purposes of planning policy, the site, therefore, lies within the countryside.

    Policy RA2 of the Rother Local Plan Core Strategy (the CS) sets out the overarching strategy for the countryside, which is to support rural businesses and strictly limit new development to that which support local agriculture, economic or tourists needs and maintains or improves rural character. Policy RA3(iii) states that the creation of new dwellings in the countryside will only be permitted in extremely limited circumstances; (a) to support a farming or other land-based industry; (b) it is the conversion of a traditional historic farm building in accordance with policy RA4; (c) the one-to-one replacement of an existing dwelling; and (d) as a rural exception site to meet identified local affordable housing need. None of the exceptional circumstances set by the CS policies is met by this scheme. As such, the proposal is contrary, concerning the land use proposed, to Policy PC1, OSS1, RA2 and RA3 (iii) of the CS.

    Policy OSS2 of the CS requires new development to be focused within defined settlement boundaries, principally on already committed and allocated sites, together with other sites where proposals accord with relevant Local Plan policies. In the countryside (that is, outside of defined settlement development boundaries), the CS identifies that development shall be normally limited to that which accords with specific Local Plan policies or that for which a countryside location is demonstrated to be necessary. The scheme would not comply with any of these criteria.

    Policy OSS3 states that the suitability of a location should have regard to the need for access to employment opportunities. Policy TR3 states that new development should minimise the need to travel and support good access to employment, services, and community facilities.

    The range of services and facilities in the immediate surrounding area is quite limited. The vast majority of services and facilities are located to the south, within or adjoining Rye town centre, including the train station, schools and shops. In order to access these facilities and services it would be necessary to use either the A268 or a footpath that connects [name] to [address] and [address].

    The most direct route to nearby schools would be to use the footpath between [name] and [address], this route has no street lighting and has a steep gradient. There is an alternative route using the footpath along the A268. However, this is also very steep on the return to the site. Accordingly, whilst it would not be impossible to walk into Rye, the gradient and lack of infrastructure would render the journey on foot unappealing for those with children, the elderly, or those with physical constraints.

    There are bus stops on the A268. I note the appellant’s representations that there is approximately a bus every 50 minutes. However, the bus service does not appear to carry on past 7o’clock in the evening or run regularly on Sundays. Furthermore, a number of buses that use the route are for school children and community groups. As such I consider there to be a limited service, and residents would generally need to rely on a private vehicle to access services and facilities in the immediate and wider area.

    The appeal site is near to a Hospital and [name]. Whilst patients may walk to the facility this does not automatically lead me to conclude that the facility is therefore in a sustainable location. On the basis of the evidence relating to the care facility it is not possible to make a meaningful comparison between the care facility and the appeal site. In any event, I have considered the suitability of the development site with regards to accessibility on its own merits.

    I find that the proposal would not be located in a suitable location due to its inadequate level of accessibility to primary services and facilities. The proposal would, therefore, fail to comply with Policies PC1, RA2, RA3 (iii), OSS2, OSS3 (x), TR3 of the CS, Policy DIM2 of the CS and Policy DIM2 of the Rother Development and Site Allocations and the National Planning Policy Framework, which when read together seek to ensure development takes place within the defined settlement boundaries, supports good access to facilities, and that development should be focused on locations which offer a genuine choice of transport modes.

  5. Section 06

    Amount of development

    The indicative site layout drawing PL002 shows an access road leading past the existing dwelling to serve the proposed houses which would be situated either side, facing into the site. Whilst the technical details stage may seek a lower level of development, the scheme before me is for 9 houses being located within this site. The dwellings closer to New England Lane would be orientated to face different direction due to the layout of the access. However, the layout would necessitate a somewhat regimented row of dwellings to the rear of those properties along [address]. This would be contrary to the sporadic grain of development in the surrounding area, which would exacerbated by the single access style formation.

    Whilst the proposal would not encroach into the wider countryside, I consider that the layout as proposed would create a more urban form of development that would fail to sit comfortably within the wider grain of development that appears to be a more naturally evolved environment.

    Accordingly, I find that the amount of development proposed could not be accommodated on the site without harming the character of the area. Therefore, the scheme would fail to comply with Policies OSS4(v), EN1(v) and EN3 of the CS and Policy DEN1 of the Rother Development and Site Allocations and the objectives of Paragraph 126 of the National Planning Policy Framework.

  6. Section 07

    Planning Balance

    The government is seeking to significantly boost the supply of housing. As the Council is unable to demonstrate a five-year supply of deliverable housing sites paragraph 11d) of the Framework is engaged and planning permission should be granted unless the adverse impacts of so doing would significantly and demonstrably outweigh the benefits, when assessed against the Framework taken as a whole.

    The proposal would provide the social and economic benefits arising from the construction of additional homes. However, I have found that the future occupiers would be largely dependent on private cars to access facilities and services. Furthermore, the Framework states that good design is a key aspect of sustainable development and advocates the creation of a high-quality built environment. In this case, I have concluded that the proposal would fail to provide a range of modes of transport and would fail to achieve a good standard of design. It would therefore not accord with the Framework’s objective of achieving a well-designed place.

    I consider that the adverse impacts of the proposal would significantly and demonstrably outweigh the benefits of the proposal for up to 9 dwellings on the site, when assessed against the policies in the Framework taken as a whole. The presumption in favour of sustainable development therefore does not apply.

  7. Section 08

    Conclusion

    The proposal conflicts with the development plan and there are no other considerations, including the provisions of the Framework, which outweigh this finding.

    For the reasons above I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 529No official casework-database value to compare
    Extracted decision date · page 1
    22 September 2021Matches the official casework database
    Extracted site visit dates
    9 February 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3271590
Application reference
RR/2020/339/PIP
Lead case reference
Not recorded
Planning authority
Rother District Council
Planning authority code
E07000064

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.85 hectares
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
Not recorded
Relates to a conservation area
No
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
21 August 2020
Valid date
20 April 2021
Start date
24 November 2020
Planning authority decision date
9 June 2020
Appeal decision date
22 September 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
3572
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
20 August 2026 at 16:25