Skip to main content
Official casework recordAllowedCurrent release

Appeal 3271801

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of part single and part two storey rear extensions.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the erection of part single and part two storey rear extensions at [site address] , Hackney, London [postcode] in accordance with the terms of the application, Ref 2020/3352, dated 5 November 2020, subject to the conditions contained within the attached Schedule.

  2. Section 03

    Main Issue

    The main issue in this case is the effect of the proposed extensions on the character and appearance of the host dwelling and the surrounding area.

  3. Section 04

    Reasons

    The appeal relates to a traditional semi-detached house which sits within a row of similar dwellings. A noticeable element of the street scene is the variety of alterations which have been added to some of the dwellings, including a range of very prominent roof dormers.

    The proposal seeks to add a part two storey and part single storey extension to the rear of the dwelling. Planning permission has been granted for ‘single storey rear and side extension at ground floor level and a single storey rear extension at first floor level’ at the appeal property on 15 March 2021 (Ref 2021/0129). The appellant has explained that the only material difference between the approved scheme and the appeal proposal is the overall width and siting of the two storey element.

    The two storey element would project some 3 metres from the main rear elevation of the host dwelling. It would sit above part of the single storey extension and would project sidewards to the boundary shared with No. [address], rather than sitting flush in line with the side elevation of the host dwelling as in the case of the approved scheme.

    The Council asserts that the proposed first floor addition would not be in be in scale with and proportionate to the roof of the host dwelling and would change its form, contrary to the advice contained within its adopted Supplementary Planning Document titled ‘[name] and Alterations’ (SPD). However, the arrangement proposed would not appear unsightly and the first floor extension would be set well back from the front elevation of the host dwelling. As a result, the appeal dwelling and No. [address] would still appear as physically separate dwellings and only very limited views of a small proportion of the first floor extension would be available within the street scene, when stood directly opposite the gap between these dwellings. Given the recessed nature of the proposed first floor addition, I am also satisfied that it would not unduly imbalance or disrupt the unity of the pair of semi-detached dwellings of which the appeal dwelling is part. This unity is already significantly disrupted by the roof additions at the attached dwelling, No. [address].

    For the above reasons, I find that the proposed extensions would not harm the character and appearance of the host dwelling or that of the surrounding area. In such terms, I find no conflict with the overall aims of policy D4 of the London Plan, policy LP1 of the adopted Hackney Local Plan or the SPD, which collectively promote high quality design which respects and responds to local character and context.

    In addition to the standard conditions which limit the lifespan of the planning permission and direct that the development takes place in accordance with the approved plans, the Council has suggested three conditions in the event the appeal succeeds. I agree that the external materials of the extensions should match those of the existing dwelling in order to ensure a visually acceptable development. I also agree that conditions relating to drainage details and flood risk mitigation are required in order to address the issues outlined by the Council’s Drainage Engineer, which have not been disputed by the appellant.

    In allowing the appeal, I shall impose these conditions.

  4. Section 05

    SCHEDULE OF CONDITIONS

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved drawing numbers: JA.4.LP, JA.04.PR.101, JA.04.PR.102, JA.04.PR.103 and JA.04.PR.104

    The materials to be used in the construction of the external surfaces of the extensions hereby permitted shall match those used in the existing building.

    At least one sustainable drainage system (ie. water butt, raingarden, bio-retention planter box, living roof (substrate depth of 80-150mm excluding the vegetation mat), permeable paving etc.) shall be implemented in accordance with details first submitted to and approved in writing by the Local Planning Authority. If soakaways ie. plastic modules and soakaway rings are used, an infiltration test must be carried out to ensure that the capacity of the soil is suitable for infiltration. It must be demonstrated that there will be no increase in surface water being discharged off-site and an overall reduction in peak flow rate and volume. The approved details shall be implemented prior to any superstructure works taking place.

    A scheme for the provision and implementation of flood resilient and resistant construction details and measures for the site against surface water flood risk shall be implemented in accordance with details first submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be fully implemented before the extension is substantially completed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 831No official casework-database value to compare
    Extracted decision date · page 1
    28 October 2021Matches the official casework database
    Extracted site visit dates
    13 October 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3271801
Application reference
2020/3352
Lead case reference
Not recorded
Planning authority
London Borough of Hackney
Planning authority code
E09000012

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
59 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
24 March 2021
Valid date
24 March 2021
Start date
3 June 2021
Planning authority decision date
30 December 2020
Appeal decision date
28 October 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
5207
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21