Appeal 3272001
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
an annex.
Section 02
Decision
The appeal is allowed and planning permission is granted for an annex at [site address] in accordance with the terms of the application, [name]/20/89192, dated 4 November 2020, and the plans submitted with it, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved drawings: LOC 01 (Location and Proposed Site Layout Plan); PRO 01 ([name] and Roof Plan); and PRO 02 (Proposed Elevations Plan).
The annex hereby permitted shall not be occupied at any time other than for purposes ancillary to the residential use of the dwelling known as [site address] .
Section 03
Applications for costs
An application for costs has been made by [name] against Eastleigh Borough Council. This application is the subject of a separate decision.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the surrounding area, with particular regard to its size, scale and location.
Section 05
Reasons
The appeal property is a large detached dwelling located between [site address] to the north and [name] to the south. The property benefits from a large driveway at its front and has a substantial garden to its southern side which wraps around to its rear. The garden is largely screened from the road by a mature boundary hedge. To the north-east of the appeal property, there is a collection of buildings which vary in size and style, which I understand are used as a day centre. Beyond these buildings, there is an expanse of open countryside. To the south-east of the appeal property, there are a number of other residential dwellings set within large gardens, some of which benefit from separate incidental outbuildings. Due to the scattered arrangement of this varied built form, there is no particular pattern of development in the immediate vicinity of the appeal site.
The Council’s Local Plan1 identifies a number of local gaps within the district, which have special importance as they protect the separate identity of smaller settlements which are at risk of coalescence with other settlements. The appeal property is located within an identified local gap between [site address] and [name]. Policy 3.CO of the Local Plan says that “planning permission will only be granted for appropriate development in a local gap if (i) it cannot be acceptably located elsewhere and (ii) it would not diminish the gap, physically or visually”.
The proposed annex would sit in the area of garden to the south of the driveway which is largely screened by the mature boundary hedge. This particular location would ensure the annex can be easily accessed from both the driveway and the main dwelling, allowing ease of movement by the appellant’s elderly parents (who are the intended occupiers of the annex), particularly his father who is reliant on a wheelchair. Given these mobility requirements, I agree that the specific location of the annex is justified. More generally, the annex could not be located away from the appeal site, as that would defeat its inherent nature as an annex to the main dwelling. On this basis, I am satisfied that the proposed development is consistent with the first limb of Policy 3.CO of the Local Plan, as it could not be acceptably located elsewhere.
Turning to the second limb of Policy 3.CO. The appeal site is located at the very south of the local gap between [site address] and [name], just east of [site address] . To the west of [site address] , there is an expanse of open land which is important to the separation of these two settlements. However, the appeal dwelling is located on the eastern side of [site address] , which comprises more built form. This includes the collection of buildings which make up the day nursery to the north-east of the site and the dwellings and outbuildings to the south-east of the site. Due to the greater level of built form surrounding the appeal site on this side of the road, its contribution to the local gap is much less valuable. Instead, on the eastern side of [site address] , it is predominantly the open countryside to the east and further north of the appeal site which is crucial to the preservation of the local gap between [site address] and [name]. As such, the addition of a further outbuilding in this area, particularly in such close proximity to the appeal dwelling, would not visually or physically diminish the local gap, and therefore would not lead to additional coalescence between [site address] and [name]. The development would therefore satisfy the second limb of Policy 3.CO of the Local Plan.
The properties along this section of [site address] are separated by substantial areas of open space, which means the building line does not add any particular value to the street scene. Therefore, its projection forward of the building line would not harm the appearance of the area, as it would be not readily apparent along the road. 1 Eastleigh Borough Local Plan Review (2001 – 2011) (2006)
In any event, due to its siting behind the mature boundary hedge at the front of the curtilage to the appeal property, much of the annex would be obscured from view along the road. Whilst this does limit its prominence, irrespective of the boundary treatment, the outbuilding would not appear visually intrusive to the street scene. There are several examples of annexes and outbuildings which are similar in size and style to the proposal very near to the appeal property, including in the gardens of the nearest dwellings. The addition of a further incidental outbuilding in this location would therefore be in-keeping with the character of the area.
In terms of size, the proposed annex would be single storey with a mono-pitched roof and would have a footprint of approximately 60sqm. Whilst the size of the annex is considerable, it would be commensurate with the size of other nearby outbuildings. Given the size of the appeal dwelling, which is a large two-storey detached property, it would also appear proportionate in scale to its host property. The annex can be comfortably accommodated without the appeal site appearing cramped or overdeveloped, whilst still retaining ample private garden. This means it would not appear overly dominant within the context of the wider curtilage of the appeal property.
In terms of facilities, the proposed annex would include a bedroom, bathroom and living space, but no kitchen. Without a kitchen, I do not consider that the annex would be tantamount to a separate dwelling, as it would still rely on the kitchen facilities of the main house. Even if a kitchen were installed at a later date so that the annex could operate as a standalone dwelling, a condition can be used to ensure it remains ancillary, which would overcome any risk of sub-division in future.
For these reasons, I am satisfied that the proposed annex would not harm the character and appearance of the area, and would therefore be consistent with Policy 59.BE of the Local Plan and Policy DM1 of the emerging Eastleigh Local Plan2, both of which require new development to take full and proper account of the context of the site including the character and appearance of the locality, specifically in relation to mass, scale, materials, layout, density, design and siting. The development would also be consistent with Policy 9.CO of the Local Plan, which seeks to ensure extensions and/or incidental outbuildings within the countryside will not be disproportionate to the main dwelling or to neighbouring properties. Finally, the development would be consistent with policies 1.CO and 3.CO of the Local Plan, as it would meet the requirements of other policies in the Local Plan, it could not be acceptably located elsewhere, and it would not diminish the local gap between [site address] and [name].
The Council’s Quality Places SPD3 does not include any detailed guidelines for annex buildings such as the one proposed, so I do not consider it relevant to the determination of this appeal.
Section 06
Conditions
Alongside the usual timing condition, I have included a standard plans condition to ensure certainty over the development carried out. I have also included a condition to ensure the annex remains ancillary to the main dwelling, which overcomes any risk of future sub-division. 2 Eastleigh Borough Local Plan 2016 – 2036 (2018) 3 Quality Places Supplementary Planning Document (2011)
The Council proposed a further condition to prevent business use from the annex and to prevent the annex being sold separately from the main dwelling. I don’t consider such a condition to be necessary. Business, industrial or commercial use would not be permitted without planning permission for a change of use. The condition securing the ancillary use of the annex is already sufficient to overcome any risk of the annex being sold off separately.
The National Planning Policy Framework is clear that conditions which restrict national permitted development rights should not be imposed unless there is clear justification for doing so. There are no particular space constraints around the appeal site which would warrant justification of such a condition in this instance.
Section 07
Conclusion
For the reasons given and subject to the prescribed conditions I conclude that the appeal should succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 640No official casework-database value to compare
- Extracted decision date · page 1
- 20 July 2021Matches the official casework database
- Extracted site visit dates
- 29 June 2021 (page 1)
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 640No official casework-database value to compare
- Extracted decision date · page 1
- 20 July 2021Matches the official casework database
- Extracted site visit dates
- 29 June 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3272001
- Application reference
- H/20/89192
- Lead case reference
- Not recorded
- Planning authority
- Eastleigh Borough Council
- Planning authority code
- E07000086
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 49 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 27 March 2021
- Valid date
- 27 March 2021
- Start date
- 25 May 2021
- Planning authority decision date
- 8 January 2021
- Appeal decision date
- 20 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 1027
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21