Appeal 3272006
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
demolition of existing bungalow and replacement with new dwelling.
Section 02
Decision
The appeal is dismissed.
Section 03
Background and Main Issue
Planning permission had previously been granted for the demolition of the existing property and the erection of a new dwelling. The appellants seek permission to carry out the development without complying with Conditions 3, 4, 5, 6 & 7. In summary, these require a sample panel of stonework to be made available on-site during construction, samples of the stone and roof tiles to be submitted and approved, architectural details to be submitted and a contamination report to be submitted and approved if any contamination is found during development. Therefore, the main issue in this appeal is whether the conditions are reasonable and necessary.
Section 04
Reasons
Paragraph 55 of the National Planning Policy Framework (the Framework) states that ‘Planning conditions should be kept to a minimum and only imposed where they are necessary, relevant to planning and to the development to be permitted, enforceable, precise and reasonable in all other respects.’ The Planning Practice Guidance (PPG) states that the 6 tests must all be satisfied each time a decision to grant planning permission subject to conditions is made.
In accordance with the PPG a key question in respect of whether a condition is necessary, is that it must not be imposed unless there is a definite planning reason for it, i.e. it is needed to make the development acceptable in planning terms.
Conditions 3, 4 and 5 relate to the provision of a sample board on site for the stone of the external walls of the development, and the supplying of samples for prior approval of the stone and roof tiles to be used. Those conditions are designed to control the materials of construction as it is likely that additional materials will be used as the existing bricks and tiles are unlikely to supply enough material to complete the building, through sizing, wastage etc. The sample board is required to ensure that correct methods of construction are used during building. All three conditions are used on a regular basis for planning applications that include construction and are fair, reasonable and necessary to ensure a planning application is completed in the interest of visual amenities.
Condition 6 relates to architectural detail and again are necessary in the interests of the visual amenities of the area and proper planning. Finer detail is often necessary during construction to ensure that the finished product is constructed in a manner that benefits the dwelling and ensures that the construction is done with quality materials and finishes for the finer points of detailing. The condition is fair, reasonable and necessary for the planning approval.
Condition 7 is a precautionary condition to ensure that in the unlikely event of any contamination being discovered that it is addressed correctly and in line with the relevant legislation before work continues. It is there as a precaution, and it is hoped that it will never be triggered, and work is completed without issue. The condition is fair, reasonable and necessary for projects involving new constructions, excavations etc.
The conditions may seem somewhat draconian to an appellant with limited resources and time, but they are necessary to ensure that the planning system works for all parties. Therefore, I find that all conditions are fair, reasonable and necessary to control the planning permission and ensure compliance with the planning application as approved.
Section 05
Conclusion
For the reasons given, and taking into account all other matters raised, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 221No official casework-database value to compare
- Extracted decision date · page 1
- 5 August 2021Matches the official casework database
- Extracted site visit dates
- 27 July 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3272006
- Application reference
- s/2021/0117/ful
- Lead case reference
- Not recorded
- Planning authority
- South Northamptonshire District Council *
- Planning authority code
- E07000155
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 1,270 hectares
- Floor space
- 184 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 27 March 2021
- Valid date
- 27 March 2021
- Start date
- 28 April 2021
- Planning authority decision date
- 25 March 2021
- Appeal decision date
- 5 August 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 1443
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21