Skip to main content
Official casework recordDismissedCurrent release

Appeal 3272256

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erection of a self-build dwelling and associated infrastructure.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matters

    The agent has advised that there is an error on the planning application form whereby the applicant’s name was entered incorrectly. The appeal is being pursued by [name] who is the co-owner of the site on the title deeds. I am content that the appeal can proceed in this name.

    The application is submitted in outline with details of access provided for consideration. All other matters are reserved for future approval.

    Following the Council’s decision, a revised National Planning Policy Framework was published. The parties have had an opportunity to comment on the implications for the appeal.

    The plans considered by the local planning authority included within the red lined boundary sections of roadside bank flanking the access onto [address]. The Transport Statement proposes alterations to these banks to improve visibility to the north and create a passing bay and short-term parking area to the south. However, the appeal is submitted on the basis of there being no changes to the banks as it is contended that such works are not necessary for a single dwelling. I have determined the appeal on that basis.

  3. Section 04

    Main Issue

    The main issue in this case is the effect of the proposal on highway safety on [address].

  4. Section 05

    Reasons

    The appeal site comprises part of the rear garden to [site address] . The property has two driveway entrances onto [address]. These nominally create an In and Out arrangement, although it is not signed as such. The proposed dwelling would be served by the northern access which is significantly more constrained than the southern access in terms of visibility for drivers exiting the site. The northern access is adequate for the purposes of entering the property, but given the choice most drivers would opt to use the southern access for egress due to its superior visibility.

    Occupants of the proposed dwelling would not have the option of which route to use. Drivers exiting the access would have a clear and unobstructed view of oncoming traffic across a raised grass verge to the south of the entrance. Visibility in this direction is acceptable. Although the [name] proposes to cut back the verge to create a passing bay and short-term parking area, these works are not necessary to make the proposal acceptable. Visitor parking can be accommodated within the site itself and [address] is of sufficient width in the vicinity of No 55’s southern access to provide temporary parking for delivery vans. There would be no conflict with Development Policy 16 of the Vale of White Horse Local Plan 2031 Part 2 (2019) insofar as it seeks to ensure that adequate provision is made for service vehicles.

    Visibility to the north for drivers exiting the access is obstructed by a roadside bank. This bank makes a positive contribution to the character and appearance of the lane and may also contain roots belonging to a mature [name] within the front garden of [address]. The parties are agreed that the bank and tree are important features within the street scene and that engineering works to regrade the bank would be detrimental to the character of the lane. This view has also been expressed by local residents and I concur.

    The access is an existing feature with no record of any collisions. On this basis, the appellant argues that it is suitable to serve a modest number of additional vehicle movements generated by a single dwelling. The lane is lightly trafficked and the narrow width and restricted forward visibility combine to keep speeds low. Survey data from a weekday morning peak recorded 4 southbound movements over the period of an hour, with average speeds of around 16 mph and an 85th percentile speed of approximately 18 mph. [name] for Streets (MfS) guidance, this translates to a stopping sight distance of approximately 22 m.

    The appellant concedes that visibility to the north is just 10 m. This is less than half of the distance recommended by MfS and is significantly substandard. The proposal would intensify the use of the access and thereby increase the risk of collisions. Although this is an existing access, there is no compelling evidence to demonstrate that it is routinely used as a means of egress, bearing in mind the existence of a safer and more convenient access at the southern end of the property frontage.

    The suggestion is that drivers would edge their way out of the access until they can see an oncoming vehicle. However, by that stage their bonnet would be projecting well into the running carriageway. During my visit, I saw that other driveway entrances within [address] have substandard visibility in at least one direction. Regular users of the road will have learnt to be vigilant for vehicles exiting driveways blind. However, these are not reasons to justify the creation of an additional hazard.

    I have considered the option of imposing a condition to secure regrading of the bank. However, as I have discussed above, the creation of a splay to the MfS visibility standard would cause significant harm to the street scene of [address]. Based on the information before me, I cannot be certain that engineering works would not cause irreparable harm to the root system of the [name]. As such, I do not consider that a condition would make the scheme acceptable as it would harm the character of the area and thereby bring the scheme into conflict with [name] 33 and 37 of the Vale of White Horse Local Plan 2031 Part 1 (2016) (LPP1).

    I have taken into consideration the appellant’s offer of a condition to preclude the use of the northern access by the occupiers of No 55. However, for the reasons I have set out above I cannot be certain regarding current levels of usage of this access for means of egress. As such, the suggested condition would not make the scheme acceptable.

    Accordingly, I conclude that the proposal would harm highway safety and conflict with Core Policy 37 of the LPP1 insofar as this seeks safe movement of road users without undermining the quality of places.

  5. Section 06

    Conclusion

    The proposal is acceptable in principle under development plan policy. The delivery of a single self-build dwelling would bring modest social and economic benefits. However, these benefits would be outweighed by the additional highway safety risk associated with the use of a substandard access.

    For the reasons given above, and having regard to all other matters raised, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 106No official casework-database value to compare
    Extracted decision date · page 1
    29 September 2021Matches the official casework database
    Extracted site visit dates
    6 September 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3272256
Application reference
P20/V1917/O
Lead case reference
Not recorded
Planning authority
Vale of White Horse District Council
Planning authority code
E07000180

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Outline
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.08 hectares
Floor space
100 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
31 March 2021
Valid date
21 April 2021
Start date
23 June 2021
Planning authority decision date
18 January 2021
Appeal decision date
29 September 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
3950
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
20 August 2026 at 16:25