Appeal 3272475
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
enlargement of a dwellinghouse consisting of the construction of one additional storey.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
The above description of development is taken from the application form. The form includes a lengthy written description of the proposal, but the main point to note from this is that the maximum height of the dwelling would increase from 5.25 m to 7.75 m.
[name].3(12) of Part 1, Class AA of the Order (‘Class AA’) requires the local planning authority to take into account any representations made to them as a result of consultation, and to have regard to the National Planning Policy Framework (the ‘Framework’), so far as relevant to the subject matter of the prior approval, as if the application were a planning application. My determination of this appeal has been made on the same basis.
Section 04
Main Issue
Amongst other things, Class AA permits the enlargement of a one storey dwelling consisting of the construction of one additional storey, immediately above the topmost storey of the dwellinghouse, together with any engineering operations reasonably necessary for the purpose of that construction.
[name].2(3)(a) of Class AA requires prior approval to be sought for the matters listed in that paragraph. Having assessed the application, the Council is content that the development is acceptable in all respects, except in relation to the external appearance of the dwellinghouse. I shall focus on this as the main matter in dispute.
Section 05
Reasons
The appeal property is a modest detached bungalow with a pitched roof. The proposal would project the building upwards by an additional storey to create a two-storey house. Viewed in isolation of surrounding development, the design would be acceptable. This is common ground between the parties.
However, the appeal site lies within an area characterised by bungalows. These vary in design, but there is a high degree of consistency in the vertical scale of the buildings. The dwellings within [address] are, without exception, low rise and this leads to a strong harmony of built form. A small minority of bungalows have had loft conversions, but these are generally confined to the existing building envelope and where dormer windows have been needed, these are subservient features which have not increased the ridge height.
The construction of an additional storey on the appeal property would create a dwelling which is significantly taller than others in [address]. The resultant building, with its two-storey eaves, would stand out as an incongruous and discordant feature in the street scene. The proposed development would fundamentally alter the architectural composition of the property relative to the street context and accordingly I find the external appearance of the dwelling to be unacceptable. The proposal would conflict with Paragraph 130 c) of the Framework which seeks to ensure that developments are sympathetic to local character and history, including the surrounding built environment.
The appellant argues that the wording of [name].2(3)(a)(ii) means that the only relevant consideration is the ‘design and architectural features’ of the front elevation, and does not empower the decision-maker to assess the development in its wider context. However, the wording of the regulations refers to the external appearance of the dwellinghouse, including the design and architectural features of the principal elevation. This indicates that matters for consideration are not confined to the appearance of the principal elevation, but can include other factors of relevance. In this case, it is neither sensible nor appropriate to consider the external appearance of the building in isolation; the street context is an aspect of the building’s external appearance.
My attention has been drawn to an appeal decision1 in which the Inspector commented that ‘the GPDO wording suggests a relatively narrow assessment as to the design and appearance of the dwellinghouse itself’. I have not been provided with the decision letter and therefore do not know the background to that appeal. Nevertheless, each case must be determined on its own merits and, where prior approval requires the external appearance of a dwelling to be assessed, it will be a matter of planning judgement as to whether consideration is given to the building’s relationship with nearby properties. In the current appeal, I have determined that the position of the property within a street of bungalows is of relevance, and for the reasons I have outlined I conclude that the external appearance of the dwellinghouse would be unacceptable. This justifies a refusal of prior approval.
Section 06
Other Matters
The appellant makes reference to a property on [address] whereby a former bungalow has had its ridge height increased to create a second floor. I do not 1 APP/J1535/D/21/3266264 know the history of this development, but noted during my visit that [address] has a different character to [address]. It is less suburban in appearance and also includes an element of two-storey housing. As such, this example can be distinguished from the appeal scheme.
It is argued that the existing dwelling is cramped and unsuitable for modern family living. [name] accept that the property may not meet the appellant’s needs, this is not a factor which can be considered in the context of an application for prior approval. The matters for consideration are restricted to those set out in [name].2(3)(a) of Class AA.
Section 07
Conclusion
For the reasons given above I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 106No official casework-database value to compare
- Extracted decision date · page 1
- 22 December 2021Matches the official casework database
- Extracted site visit dates
- 6 December 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3272475
- Application reference
- 21/00375/GPDAA
- Lead case reference
- Not recorded
- Planning authority
- Basingstoke and Deane Borough Council
- Planning authority code
- E07000084
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 59 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 April 2021
- Valid date
- 9 April 2021
- Start date
- 16 June 2021
- Planning authority decision date
- 31 March 2021
- Appeal decision date
- 22 December 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 8062
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21