Skip to main content
Official casework recordAllowedCurrent release

Appeal 3272821

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a retrospective planning application for the construction of an outbuilding at [site address] .

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the construction of an outbuilding at [site address] , Tilbury [postcode] in accordance with the terms of the application Ref 20/01727/HHA, dated 10 December 2020.

  2. Section 03

    Procedural matters

    The proposed outbuilding is in place. It appears to have been erected in accordance with the submitted plans.

    The appellant has drawn my attention to the Council’s recent decision to grant planning permission1 for a development at the same address that is described as “demolition of existing garage and replace with outbuilding to be used as a gym and as storage space and rear covered seating area and patio [retrospective] and proposed revision to the roof design and height of the outbuilding.” As few background details of this approved scheme were provided and it postdated the appeal submission I invited the main parties to make comments in relation to it although none were submitted.

  3. Section 04

    Main issues

    The main issues are whether the development provides satisfactory living conditions for the occupiers of the appeal property with regard to private amenity space and the effect of the proposal on the living conditions of the occupiers of [address] with regard to light and visual impact.

  4. Section 05

    Reasons

    The appeal property is a 2-storey semi-detached house that has been externally altered and extended. At the rear of the main house is a sizeable ground floor rear extension together with an open-sided timber structure on a 1 Ref 21/00635/HHA dated 6 July 2021 raised platform. Towards a rear corner of the site is also a detached single storey ‘L’ shaped outbuilding with a flat roof that is the subject of this appeal. According to the plans, the appeal outbuilding is for use as a gym and store. At the time of the site visit, the area of the outbuilding that is denoted ‘temporary structure’ on the plans was in use as a dog kennel. Living conditions of the occupiers of No 51

    From what I saw, No 51 stands within a good-sized plot. Consequently, even with the rear extensions to the main house and the appeal outbuilding in place, the open area left at the back of the dwelling to provide private amenity space (PAS) is reasonable in size. Open areas are also potentially available for PAS at the front and side of the main house. On that basis, there is no significant issue with regard to the overall amount of PAS available to serve the occupiers of No 51. The Officer’s Report also accepts that the total footprint of the rear extensions and appeal outbuilding would not exceed the maximum threshold of 30% buildable curtilage that it says is outlined in the [name]: [name] and [name] (SPD).

    The PAS available between the rear of the existing dwelling and the appeal outbuilding could become an attractive and useable courtyard, patio or garden area. Having viewed this space in the context of the existing built form, I consider that it would be suitable for a range of day-to-day activities including sitting and eating out, drying clothes and children’s play. Because the existing building and boundary fences visually enclose this PAS with good natural surveillance from the rear windows of the house it would be suitable for use by young children or as a pleasant area for the elderly to sit out. Furthermore, access to this PAS is also available directly from the house or externally from alongside the sidewall of the main dwelling.

    Taken together, these considerations, which relate to the quantity, quality and usability of PAS, are important considerations to be taken into account and weighed in the planning balance. Having regard to these matters, I am persuaded that the provision of PAS to serve the occupiers of No 51 is satisfactory taking into account the existing rear extensions to the main house and the appeal outbuilding. Living conditions of the occupiers of No 49

    The flank wall of the appeal outbuilding is close to and parallel with the shared rear boundary with the attached property, which is [address]. As the back of No 49 broadly faces north and the appeal building is well away from its rear elevation, any additional loss of natural light would be limited to the rearmost section of this neighbouring garden during the early part in the day. As the extent of additional overshadowing due to the appeal outbuilding would be modest in extent and duration, it would have no discernable effect on the living conditions of the occupiers of No 49.

    The upper flank wall and roof of the appeal outbuilding projects noticeably above the boundary fence that separates No 49 and the site. Consequently, the development sought partly encloses the rearmost section of this neighbouring garden. It would be evident from both here and the rear windows of No 49 together with the sidewall and roof of the existing ground floor extension that projects outwards from the main rear wall. Even so, the appeal outbuilding is modest in height and placed well away from this neighbouring dwelling. The main direction of outlook from the rear windows of No 49 across the back garden with the existing rear extensions of No 51 to one side would not be significantly affected. Consequently, the presence of the appeal outbuilding, while evident, would not be so imposing as to overbear on the occupiers of No 49 even when seen cumulatively with the existing extensions at the back of the appeal dwelling.

  5. Section 06

    Conclusion on the main issues

    On the main issues, I conclude that the development provides satisfactory living conditions for the occupiers of No 51 and that it does not cause significant harm to the living conditions of the occupiers of No 49. Accordingly, the development does not conflict with Policy PMD1 of the [name] and Policies for the Management of Development and the SPD insofar as they aim to safeguard residential amenity.

  6. Section 07

    Other matters

    While the appellant has referred to the Council’s recent decision to approve a development on the site (see paragraph 3 above) few details of that scheme have been provided. Consequently, I am unable to draw any meaningful conclusions from that decision given than it is unclear what, if any, parallels can be drawn with the development sought. In any event, I have assessed the appeal scheme on its own merits.

  7. Section 08

    Conditions

    As the development is complete, conditions requiring that the development be carried out in accordance with the plans and for matching external materials to be used, as suggested by the Council, are unnecessary. I share the Council’s opinion that no other conditions are required.

  8. Section 09

    Conclusion

    For the reasons set out above, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 287No official casework-database value to compare
    Extracted decision date · page 1
    29 September 2021Matches the official casework database
    Extracted site visit dates
    23 September 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3272821
Application reference
20/01727/HHA
Lead case reference
Not recorded
Planning authority
Thurrock Borough Council
Planning authority code
E06000034

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
9 April 2021
Valid date
9 April 2021
Start date
16 June 2021
Planning authority decision date
11 March 2021
Appeal decision date
29 September 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
3958
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21