Appeal 3273284
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as “Proposed telecommunications installation: Proposed 20m Phase 8 [name]/W wrapround Cabinet at base and associated ancillary works”.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matter
The provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), under Article 3(1) and Schedule 2, Part 16, Class A, requires the local planning authority to assess the proposed development solely on the basis of its siting and appearance, taking into account any representations received. My determination of this appeal has been made on the same basis.
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the surrounding area.
Section 05
Reasons
The area surrounding the appeal site is characterised predominantly of commercial buildings of ranging sizes. The surrounding area is a typical urban area with common street furniture paraphernalia including street lighting and road signs. It has been indicated that the site is close to a Conservation Area however, it has been described that the site is not located within a statutory designation.
The proposal would be significantly taller than existing features in the area and would appear out of keeping with structures such as the nearby street lighting. There would be buildings that are higher than the proposed mast however, given the design, mass and scale of the proposal, it would appear as an unusual feature that dominates the street scene.
The appellant indicates that the colour finish of the proposal can be any that is deemed appropriate for the area. The finishing colour would not outweigh the detrimental effect the proposal has on the surrounding area in terms of its siting, scale, style and overall height that would visually jar with its surrounding setting.
The proposal would be an obtrusive feature that would have a harmful effect on the character and appearance of the surrounding area. The proposal would conflict with Policies INF5 and QP4 of the Hartlepool Local Plan 2018 and the National Planning Policy Framework which seeks all development to be designed to a high quality and positively enhance their location and setting; and have regard to design and siting techniques.
The Council have referred to future regeneration possibilities in the surrounding area, including a film studio. Insufficient detail has been provided on these regeneration schemes and I cannot be sure how the appeal scheme would affect them. I have dealt with the appeal on the current circumstances of the area. This matter does not alter my findings above.
Section 06
Other Matters
In terms of perceived potential health risks associated with the installation of the proposal, documentation has been provided to confirm compliance with the International Commission on [name] (ICNIRP) guidelines in this regard.
There are no residential properties within close proximity to the appeal site and as such there would be no adverse effect on the living conditions of residential occupants.
It appears pre-application advice was submitted on the proposals. Given the dates of the submitted documentation for the pre-application submission and the prior approval application, along with email evidence, it does not seem that the Council and other stakeholders had sufficient opportunity to engage fully with the pre-application submission.
It has been indicated that the associated ancillary equipment cabinets are within the size limits to be classified as permitted development without prior approval. This matter does not alter my findings above with regards to the harm from the proposed mast.
Section 07
Planning Balance
The proposal would bring public benefit arising from the 5G installation including smarter infrastructure and benefits contributing towards environmental benefits; improved connectivity which is essential for future success of the economy, better society, and fulfilling potential of new technologies.
The appellant describes the need for the mast to be 20 metres high is essential as the height of the monopole must be sufficient to enable local provision and clear surrounding buildings. In addition, it has been stated that the monopole with 5G also needs to be 20 metre to clear ICNIRP guidelines and thus there is no scope to lower the monopole. There is no clear evidence before me which indicates that the mast cannot be lower than 20 metres for it to remain operational or meet the required guidelines. There is also an email dated 23 March 2021 which implies that the proposed mast can be reduced.
The appellant has submitted a sequential approach on site selection with around eleven sites identified and all were discounted for various reasons including coverage, proximity to residential and insufficient pavement width. Insufficient information, including technical data and relationship with adjoining residential buildings, has been submitted to clearly determine why these other sites were discounted and not appropriate as potential alternative sites.
I have had regard to the appellants statement of case including material considerations that contribute to the delivery of sustainability and requirements detailed in the ‘Letter to Chief Planning Officers: Planning for Growth’.
The proposal would result in public benefits to the area. However, from the evidence before me, I am not convinced that alternative options including other sites or redesign of the proposal have been fully explored. The benefits and matters described above therefore do not outweigh the substantial harm that I attribute to the affects that the proposal would have on the character and appearance of the surrounding area.
Section 08
Conclusion
The proposal would conflict with the development plan as a whole and there are no other considerations, including the provisions of the Framework, which outweigh this finding.
Therefore, for the reasons given above, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 173No official casework-database value to compare
- Extracted decision date · page 1
- 7 July 2021Matches the official casework database
- Extracted site visit dates
- 5 July 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3273284
- Application reference
- H/2021/0079
- Lead case reference
- Not recorded
- Planning authority
- Hartlepool Borough Council *
- Planning authority code
- E06000001
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.02 hectares
- Floor space
- 20 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- Yes
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 17 April 2021
- Valid date
- 17 April 2021
- Start date
- 5 May 2021
- Planning authority decision date
- 9 April 2021
- Appeal decision date
- 7 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 357
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25