Appeal 3273284

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as “Proposed telecommunications installation: Proposed 20m Phase 8 [name]/W wrapround Cabinet at base and associated ancillary works”.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matter

    The provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), under Article 3(1) and Schedule 2, Part 16, Class A, requires the local planning authority to assess the proposed development solely on the basis of its siting and appearance, taking into account any representations received. My determination of this appeal has been made on the same basis.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the surrounding area.

  4. Section 05

    Reasons

    The area surrounding the appeal site is characterised predominantly of commercial buildings of ranging sizes. The surrounding area is a typical urban area with common street furniture paraphernalia including street lighting and road signs. It has been indicated that the site is close to a Conservation Area however, it has been described that the site is not located within a statutory designation.

    The proposal would be significantly taller than existing features in the area and would appear out of keeping with structures such as the nearby street lighting. There would be buildings that are higher than the proposed mast however, given the design, mass and scale of the proposal, it would appear as an unusual feature that dominates the street scene.

    The appellant indicates that the colour finish of the proposal can be any that is deemed appropriate for the area. The finishing colour would not outweigh the detrimental effect the proposal has on the surrounding area in terms of its siting, scale, style and overall height that would visually jar with its surrounding setting.

    The proposal would be an obtrusive feature that would have a harmful effect on the character and appearance of the surrounding area. The proposal would conflict with Policies INF5 and QP4 of the Hartlepool Local Plan 2018 and the National Planning Policy Framework which seeks all development to be designed to a high quality and positively enhance their location and setting; and have regard to design and siting techniques.

    The Council have referred to future regeneration possibilities in the surrounding area, including a film studio. Insufficient detail has been provided on these regeneration schemes and I cannot be sure how the appeal scheme would affect them. I have dealt with the appeal on the current circumstances of the area. This matter does not alter my findings above.

  5. Section 06

    Other Matters

    In terms of perceived potential health risks associated with the installation of the proposal, documentation has been provided to confirm compliance with the International Commission on [name] (ICNIRP) guidelines in this regard.

    There are no residential properties within close proximity to the appeal site and as such there would be no adverse effect on the living conditions of residential occupants.

    It appears pre-application advice was submitted on the proposals. Given the dates of the submitted documentation for the pre-application submission and the prior approval application, along with email evidence, it does not seem that the Council and other stakeholders had sufficient opportunity to engage fully with the pre-application submission.

    It has been indicated that the associated ancillary equipment cabinets are within the size limits to be classified as permitted development without prior approval. This matter does not alter my findings above with regards to the harm from the proposed mast.

  6. Section 07

    Planning Balance

    The proposal would bring public benefit arising from the 5G installation including smarter infrastructure and benefits contributing towards environmental benefits; improved connectivity which is essential for future success of the economy, better society, and fulfilling potential of new technologies.

    The appellant describes the need for the mast to be 20 metres high is essential as the height of the monopole must be sufficient to enable local provision and clear surrounding buildings. In addition, it has been stated that the monopole with 5G also needs to be 20 metre to clear ICNIRP guidelines and thus there is no scope to lower the monopole. There is no clear evidence before me which indicates that the mast cannot be lower than 20 metres for it to remain operational or meet the required guidelines. There is also an email dated 23 March 2021 which implies that the proposed mast can be reduced.

    The appellant has submitted a sequential approach on site selection with around eleven sites identified and all were discounted for various reasons including coverage, proximity to residential and insufficient pavement width. Insufficient information, including technical data and relationship with adjoining residential buildings, has been submitted to clearly determine why these other sites were discounted and not appropriate as potential alternative sites.

    I have had regard to the appellants statement of case including material considerations that contribute to the delivery of sustainability and requirements detailed in the ‘Letter to Chief Planning Officers: Planning for Growth’.

    The proposal would result in public benefits to the area. However, from the evidence before me, I am not convinced that alternative options including other sites or redesign of the proposal have been fully explored. The benefits and matters described above therefore do not outweigh the substantial harm that I attribute to the affects that the proposal would have on the character and appearance of the surrounding area.

  7. Section 08

    Conclusion

    The proposal would conflict with the development plan as a whole and there are no other considerations, including the provisions of the Framework, which outweigh this finding.

    Therefore, for the reasons given above, the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 173No official casework-database value to compare
    Extracted decision date · page 1
    7 July 2021Matches the official casework database
    Extracted site visit dates
    5 July 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3273284
Application reference
H/2021/0079
Lead case reference
Not recorded
Planning authority
Hartlepool Borough Council *
Planning authority code
E06000001

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
3. Refused prior approval of permitted development rights
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.02 hectares
Floor space
20 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
Yes
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
17 April 2021
Valid date
17 April 2021
Start date
5 May 2021
Planning authority decision date
9 April 2021
Appeal decision date
7 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
357
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
20 August 2026 at 16:25