Skip to main content
Official casework recordAllowedCurrent release

Appeal 3273407

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the ‘erection of rear roof extensions and insertion of rooflights to front roof slope and rear roof slope of rear outrigger.’

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the erection of rear roof extensions and insertion of rooflights to front roof slope and rear roof slope of rear outrigger at [site address] , Hackney, London [postcode] , in accordance with the terms of application, Ref. 2020/4101, dated 31 December 2020, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: DR.71.LP, DR.71.PR.01 and DR.71.PR.02 [name]

    The materials to be used in the construction of the external surfaces of the roof extensions hereby permitted shall match those used in the existing building.

    Prior to the substantial completion of the development hereby permitted, two swift nesting bricks and/or boxes shall be fitted at eaves level to the host dwelling. The nesting bricks and/or boxes shall be retained thereafter.

  2. Section 03

    Application for Costs

    An application for costs was made by the Appellant against the Council, which is the subject of a separate decision. www.planningportal.gov.uk/planninginspectorate

  3. Section 04

    Main Issue

    The main issue in this case is the effect of the proposal on the character and appearance of the host dwelling and the Northwold and Cazenove Conservation Area (CA) within which it sits.

  4. Section 05

    Reasons

    The appeal relates to a traditional mid-terrace dwelling which sits within a row of similar dwellings. The proposal seeks to introduce rooflights to the front roof profile of the dwelling along with the rear roof slope of the rear outrigger. The Council raises no issue with this element of the scheme and nor do I.

    The proposal also includes the introduction of a box dormer to the rear roof profile with a lower box section linking into to the pitched roof of the existing outrigger. The outrigger occupies a large proportion of the width of the rear elevation of the dwelling. Like the other outriggers within the row, it has a pitched roof with a ridge running parallel to that of the host dwelling, thereby creating a valley where it meets the main rear elevation.

    The Council’s adopted Supplementary Planning Document titled ‘[name] and Alterations’ (SPD) recommends that rear roof dormers should be a minimum of 0.5m below the ridge, a minimum of 1m from the eaves line and should have an overall height that is no more than half the height of the roof. However, the SPD does explain that where a number of large rear box dormers already exist within the immediate vicinity, then a larger rear dormer might be acceptable, subject to provisions.

    The proposed rear box dormer would span the full width of the property and would be the full height from the eaves level to the ridge. It would be a substantial addition which would add significant bulk to the roof. However, highly material to this case is the presence of large box roof dormers at the nearby dwellings of Nos. 67 and [address] which have already altered the roofscape of this terrace.

    The proposal also includes a smaller box link from the main roof dormer to the exiting outrigger. Given the width of the outrigger, only very limited views of this element of the development would be visible from the rear of the neighbouring dwellings. I also understand that there are several similar ‘full width’ roof additions which infill the gap with the rear roof slope of the associated outriggers along this side of [address], with examples at Nos. 3, 15, 39 and 45 quoted by the Appellant. Furthermore, the Appellant has advised that planning permission has since been granted on 22 October 2021 for a very similar roof addition at No. [address] (Planning Permission Ref. 2021/2677).

    Given the presence of similar roof additions nearby, I conclude that the proposal would not harm the character and appearance of the host dwelling or the roofscape of the terrace within which it sits and it would have a neutral effect on the character and appearance of the CA. To this end, I find no conflict with the overall aims of policies LP1 and LP3 of the adopted Hackney Local Plan and the SDP, which collectively promote high quality design which respects and complements local context and preserves or enhances heritage assets. 2

    In addition to the standard conditions which limit the lifespan of the planning permission and direct that development takes place in accordance with the approved plans, the Council has suggested two conditions in the event the appeal succeeds. I agree that the external materials of the roof additions should match those of the host dwelling in order to ensure a visually acceptable development. I also agree that two swift nesting bricks and/or boxes should be fitted at eaves level to the host dwelling in order to enhance biodiversity within the Borough.

    In allowing the appeal, I shall impose conditions accordingly.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 831No official casework-database value to compare
    Extracted decision date · page 1
    16 November 2021Matches the official casework database
    Extracted site visit dates
    13 October 2021 (page 1)
  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 831No official casework-database value to compare
    Extracted decision date · page 1
    16 November 2021Matches the official casework database
    Extracted site visit dates
    13 October 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3273407
Application reference
2020/4101
Lead case reference
Not recorded
Planning authority
London Borough of Hackney
Planning authority code
E09000012

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
95 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Yes
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
19 April 2021
Valid date
19 April 2021
Start date
29 June 2021
Planning authority decision date
8 April 2021
Appeal decision date
16 November 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
6105
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21