Skip to main content
Official casework recordDismissedCurrent release

Appeal 3273662

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a dropped kerb to provide vehicular access.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    Since determination of the planning application, the 2019 iteration of the National Planning Policy Framework (Framework) has been superseded. I am satisfied that the updates to the Framework do not materially affect its content insofar as it is relevant to the main issue of this appeal, so I have therefore determined this appeal with regard to the current version, published in July 2021.

    I have taken the description of the development from the Council’s decision notice, as this more accurately describes the physical elements of the proposed development.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on highway safety.

  4. Section 05

    Reasons

    The appeal property is a two-storey terraced dwelling situated on the northern side of [address], which is a busy A road leading in and out of Aylesbury. The property has a modest garden to the front, which is largely enclosed by a low brick wall and hedgerow. There is residential parking which runs parallel with the road just beyond the pavement to the front of the property.

    The proposed development would drop approximately 4.5m of the kerb to the front of the property, in order to facilitate vehicular access in and out. Associated works are also proposed to the front garden to facilitate the off-street parking.

    Given the existing parking arrangement for the terrace, any vehicle movements to and from the appeal property would need to pass through the parked vehicles which run parallel with the road. These parked vehicles severely restrict visibility along the highway. As a result, there would be a heightened risk of collision, particularly when exiting the property. Moreover, assuming a driver’s attention would be primarily focused on vehicle movements beyond the row of parked cars when leaving the property, this could compromise the safety of pedestrians along this stretch of road. As an important strategic road in and out of Aylesbury, [address] is very busy, which further exacerbates these risks.

    Irrespective of whether the front of the appeal property has sufficient room to meet the Council’s minimum space standards, there would be little room left for any manoeuvring on site. To park a car at the property, this would mean drivers would either need to reverse from the road into the parking space, or else reverse out from the parking space on to the road. In either case, given the restricted visibility attributed to the row of parked vehicles to the front of the property, such manoeuvring would heighten any risks to other drivers and cyclists along the road, as well as pedestrians along the pavement.

    To ensure access is not restricted to and from the appeal property, no parking would be possible in the allocated parking zone to the front of the property. In practice, this would likely result in the loss of [address], meaning a net loss of 1 space (when factoring in the newly created parking space on the appeal property itself). Given the existing limitations with regard to parking in this area (which was readily apparent on my site visit), the loss of any parking spaces in this area should be discouraged.

    For these reasons, the proposed development would risk harm to highway safety. It would conflict with Buckinghamshire’s Local Transport Plan 4 March 2016 – 2036, the Council’s Highways Development Management Guidance (2018) and Policy T6 of the emerging Vale of Aylesbury Local Plan 2013 –

    Together, these policies and guidance direct parking to appropriate locations which ensure the safety of road users is properly safeguarded. The development would also conflict with the overarching highway safety objectives of the Framework (2021).

    No technical/scale drawings have been provided which detail the precise measurements of the proposed parking space. As such, I cannot conclude whether it would meet the minimum space standards required by Buckinghamshire Countywide Parking Guidance (2015).

  5. Section 06

    Other Matters

    [name] acknowledge the benefit of the proposed development in terms of facilitating the appellant’s use of an electric/hybrid vehicle (which in turn would help contribute to the government’s and Council’s targets to reduce carbon dioxide emissions), unfortunately such benefit would not outweigh the harm to public safety identified above.

    I also note the examples of other dropped kerbs elsewhere along [address]. [name] question the safety of such arrangements in any case, the frontages to most of these properties appear significantly wider than the appeal site. As a result, these would generally benefit from greater visibility and flexibility to manoeuvre.

  6. Section 07

    Conclusion

    For the reasons given above, and having considered the development plan as a whole, the approach in the Framework, and all other relevant material considerations, the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 640No official casework-database value to compare
    Extracted decision date · page 1
    26 August 2021Matches the official casework database
    Extracted site visit dates
    23 August 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3273662
Application reference
20/04187/APP
Lead case reference
Not recorded
Planning authority
Buckinghamshire Council - Aylesbury Area *
Planning authority code
E07000004

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.05 hectares
Floor space
22 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
22 April 2021
Valid date
8 May 2021
Start date
29 July 2021
Planning authority decision date
3 February 2021
Appeal decision date
26 August 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
2380
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21