Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
alterations to include alterations to roof/ridge height, erection of dormer extension on front roof slope and hip-to-gable roof extension at rear.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
I use the Council’s description of development which is more precise than the application form; I note the Appellant also uses this description on the appeal form.
Section 04
Main Issue
I consider the main issue is the effect of the proposal on the character and appearance of the host property and the locality.
Section 05
Character and appearance
The appeal property is a traditional detached suburban bay-fronted dwelling within an area of established residential character where homes and gardens combine to create a locality of pleasing appearance. The planned alterations are as described above.
There is a mix of house types found locally. However, the appeal property lies within an unusual run of about seven homes which display almost identical elevations and roof forms and with some grace and consistency they rise logically up the contours of the street. This scene is readily observed and is attractive to the eye. None of the row has a front dormer and ridge heights appear to be original. For the appeal property to be altered in this dual way would be visually regrettable and jarring. The dormer in particular by reason of scale, form and siting would unsettle the front elevation of the appeal property and would disrupt the attractive flow of currently similar homes along this stretch of road. The scheme would be very ill-at-ease visually.
For these reasons I conclude that the proposal would run contrary to Policies SP4 and DM10 of the Croydon Local Plan 2018 and [name] 2019 (SPD). It would also conflict with the 2021 London Plan’s Policy D4: Delivering good design which replaces, in a similar vein, the now superseded Policies 7.4 and 7.6 cited by the Council. The forgoing policies and SPD all aim to ensure that new development is well designed and aesthetically appropriate.
Section 06
Other matters
I do understand the Appellant’s wish to extend to provide better accommodation and I am aware of the planning history on the site. I recognise that the Appellants may have two ‘fall back’ options with the ‘permitted development’ scheme (Ref 20/04242/LP) which does not raise the roof and has a front roof light or the recent planning permission (Ref 21/00953/HSE) which has no front facing principal fenestration but does raise the roof. The choice of development rests with the Appellant. I am not persuaded that the combination of the provision of a front dormer and the raising the roof is visually preferable to either option and for the reasons I have given I consider that the appeal scheme would be a step too far and would be markedly alien in the streetscene. I viewed development locally and whilst dormers can on occasion be found their situation through the style and setting of their host properties is not comparable to the case in hand. I see a continuing need for good design at the appeal property and I must deal with this appeal scheme on its own merits.
I have carefully considered all the points raised by the Appellant but these matters do not outweigh the concerns which I have in relation to the main issue identified above.
I confirm that policies in the National Planning Policy Framework have been considered. Key objectives of the document are to safeguard qualities of the built environment and the development plan policies and guidance to which I refer mirror this.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 352No official casework-database value to compare
- Extracted decision date · page 1
- 13 September 2021Matches the official casework database
- Extracted site visit dates
- 10 August 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3273895
- Application reference
- 20/06397/HSE
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Croydon
- Planning authority code
- E09000008
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 27 April 2021
- Valid date
- 27 April 2021
- Start date
- 30 June 2021
- Planning authority decision date
- 5 February 2021
- Appeal decision date
- 13 September 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 3089
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21