Skip to main content
Official casework recordDismissedCurrent release

Appeal 3274093

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

outline planning application for up to 315 residential units, land for up to 1,050m2 D1 floorspace for a GP surgery including pharmacy and up to 370m2 A1 retail floorspace for a convenience foodstore and associated access, open space, playing pitches including MUGA and car park, landscaping, Suitable Alternative Natural Greenspace (SANG) including car park and improvements to the A278/ [address] junction (means of access into the main site to be considered, all other matters reserved) without complying with a condition attached to planning permission Ref 14/00504/MAJOR, dated 26 June 2015.

  1. Section 02

    Decisions

    Appeal A is dismissed.

    Appeal B is dismissed.

  2. Section 03

    Preliminary Matters

    [name] and B are effectively the same proposal for the variation of [name] 37 of planning permission Ref. 14/00504/MAJOR under s73 of the Town and Country Planning Act 1990 to change the time trigger for the improvements to the A287/[address] junction to be completed and fully operational from prior to the first occupation of the development to prior to occupation of the 50th dwelling.

    In respect of Appeal B, the appellant’s supporting transport technical note was not considered by the Council in reaching its decision, and this has been submitted with the appeal. A transport technical note was submitted at planning application stage for Appeal A, which was subject of consultation and considered by the Council. For the avoidance of doubt, I have dealt with the appeals together in my decision to avoid repetition.

    The Crookham Village Parish Neighbourhood Development Plan 2016-2032 was ‘made’ on 20 May 2021 following its approval at referendum on 6 May 2021 and therefore forms part of the Development Plan.

    Since the appeal was submitted, the Government published a revised version of the National Planning Policy Framework (the Framework). The main parties were given the opportunity to comment on any implications for the appeal of this change, and I am satisfied that no prejudice would be caused by my consideration of the appeal in light of the revised Framework.

  3. Section 04

    Main Issue

    The main issue in both appeals is the effect of the variation of [name] 37 on highway capacity and safety.

  4. Section 05

    Reasons

    The original Transport Assessment (the original TA) submitted as part of planning application Ref. 14/00504/MAJOR showed that the existing A287/[address]/[name] junction operated over capacity in 2013, with a maximum queue during the morning peak of [address] (ahead and right turn) and 27 vehicles in [name] (ahead and right turn). This is reinforced by the previous Inspector’s appeal decision dated Appeal Decisions APP/N1730/W/21/3274093 & APP/N1730/W/20/3264492 26 June 20151, which states “I observed substantial queues of traffic waiting on Redhills [sic] Lane to gain access onto the A287”. The modelling in the original TA identified a further deterioration in capacity in 2018 (including committed development) with a maximum queue of [address] and 27 vehicles in [name]. The issues at the junction include poor geometry/visibility to the east of the [address] arm onto the A287 and the volume of 2-way traffic on the A287, which results in a lack of gaps in the traffic for vehicles queuing in [address] and [name] to join the carriageway - particularly for vehicles turning right.

    The original TA set out a junction improvement scheme consisting of a new roundabout. The modelling in the original TA showed that the proposed junction would operate within capacity having regard to future growth in traffic flows, including the proposal and committed development. The previous Inspector was satisfied that the proposed mitigation would be acceptable, and she stated that the improvements to the junction must be completed and fully operational prior to the first occupation of any dwellings to ensure that highway safety would not be compromised as a result of the increase in traffic generated by the development.

    The traffic growth rates used in the original TA were based on the National Trip End Model (NTEM) database (version 6.2, released in December 2009) through TEMPRO. The appellant’s [name] 07A2 states that the current version 7.2 of NTEM was released in March 2017 and is based on more up to date census data. The current data indicates a lower traffic growth rate than that forecast in the original TA for the period 2011-2018. This amounts to a reduction in traffic growth predictions of 73 and 69 vehicles passing through the junction in the morning and evening peak periods respectively, when compared with the figures used in the original TA. On this basis, the appellant asserts that the vehicular trips associated with the occupation of 50 dwellings is forecast to be lower than the future baseline traffic forecasts used in the original TA, on which the previous Inspector’s conclusions regarding traffic and road safety impacts were predicated.

    However, the original TA only assessed the mitigation provided by the improvements to the [address] junction and did not consider the effect of the proposal on the capacity and safety of the existing junction. This is likely because the original TA recognised the need for mitigation, and the new roundabout junction formed part of the proposed development. Crucially, Tables 6-12 and 6-13 of the original TA showed that the improvements to the junction would result in it operating within capacity having regard to committed development and development traffic. It is on this basis that the previous Inspector found the highway impact of the proposal to be acceptable.

    The current appeal scheme proposes for the roundabout junction to be provided prior to the occupation of the 50th dwelling. [name] acknowledge the appellant’s information that the forecast traffic growth is lower than that shown in the original TA because of the updated data, little evidence has been provided regarding the effect of vehicular trips associated with 49 dwellings on the capacity and safety of the existing road junction. 1 Appeal Ref. APP/N1730/A/14/2228404 2 [name] 07A: [address]/A287 [name] – 18 November 2020 prepared by motion. Appeal Decisions APP/N1730/W/21/3274093 & APP/N1730/W/20/3264492

    Table 4.6 of the Council’s Transport Statement3 indicates the operational performance of the existing junction, including 3 different growth rate assumptions. The first relates to a 2018 base with ‘observed traffic growth rates’ plus 50% of committed development. I agree with the appellant’s [name] 114, which states that it is unclear how the ‘observed traffic growth’ has been calculated. Table 4.1 of the Council’s Transport Statement does not show observed count data for the years 2011 and 2018, and it appears that estimated figures may have been used. Furthermore, the Council’s calculation of observed traffic growth appears to rely on only 3 years (2010, 2015, 2019), and I find that this is not sufficient data to draw any firm conclusions regarding observed traffic counts.

    Nevertheless, Table 4.6 of the Council’s Transport Statement also shows calculations based on the traffic growth rates shown in the appellant’s [name] 07A plus 50% of committed development. This identifies that the existing junction operates significantly over capacity during the morning and afternoon peak hours. During the morning peak hour, the maximum queue length is shown to be [address] (ahead and right). Furthermore, the Council’s Transport Statement also sets out calculations for a zero-traffic growth scenario plus 50% of committed development, which again shows the junction operating significantly over capacity during the morning and afternoon peak hours. The maximum queue length during the morning peak hour at [address] is moderately lower at 78 vehicles. There is little before me to doubt these two growth scenarios provided by the Council, which shows that the existing junction operates significantly over capacity and has deteriorated compared to the 2013 base set out in the original TA.

    The appellant’s [name] 07A states that 50 dwellings would result in 28 two-way trips in the morning peak and 31 two-way trips in the afternoon peak. I appreciate that the number of additional trips would be moderate, and I have had regard to the comments from the Highway Authority, which raise no objection to planning application Ref. 20/02827/AMCON. Nevertheless, the evidence shows that the existing [address] junction operates significantly over capacity and the proposal for the improvements to the junction to be provided prior to the occupation of the 50th dwelling rather than prior to first occupation would add to queuing vehicles travelling through the existing junction. Consequently, this would further reduce the capacity of an already congested junction, which would be detrimental to the efficient flow of traffic and the safety of the users of the highway.

    During my site visit, I observed that the [address] and [name] arms of the junction with the A287 were closed and the proposed junction improvement works had commenced. The road signs indicated that the works are due to be completed by Autumn 2022. The speed limit around the roadworks was reduced to 30mph and diversion signs were in place. Traffic intending to use [address] was diverted to [address] (B3013) and [address]. Signs were in place indicating that other roads off the A287 (including [address], [address], and [address]) were not suitable for diverted traffic. Traffic intending to access [name] was diverted to the junction close to the BP petrol station on the A287. 3 Prepared by rps group dated 14 June 2021 Ref. JNY11002-01 4 [name] 11: [name] – 22 June 2021 prepared by motion. Appeal Decisions APP/N1730/W/21/3274093 & APP/N1730/W/20/3264492

    [name] appreciate that the [address] junction is currently closed, there is little before me to show the effect of the additional trips associated with the proposal on the existing roads in the area, which could already experience more congestion as a result of [address] being closed.

    For the above reasons, I find that Condition 37 of planning permission Ref. 14/00504/MAJOR is necessary and reasonable because it mitigates the impact of the proposed development on the local highway network and enables construction to commence ahead of the completion of the junction improvements. The proposed variation of the condition would cause a severe impact on highway capacity and safety. The proposal would therefore be contrary to Policy INF3 of the Hart Local Plan (Strategy and Sites) 2032 (‘the Local Plan’), saved Policy GEN1(viii) of the Hart Local Plan (Replacement) 1996-2006 saved policies and Policy TM02 of the Crookham Village Parish Neighbourhood Development Plan 2016-2032, which, amongst other things, state that development proposals will be supported that do not have a severe impact on the operation, safety or accessibility of the local or strategic highway networks; and mitigate impacts on the local or strategic highway networks, arising from the development itself or the cumulative effects of development.

    The proposal would also be contrary to paragraph 111 of the Framework, which states that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe.

  5. Section 06

    Other Matters

    I have had regard to the appellant’s explanation regarding the delays to the delivery of the proposed roundabout junction. The design, construction and working restrictions have clearly caused complex challenges. The variation of Condition 37 would bring forward the delivery of 49 dwellings and aid the construction programme, which I attach moderate weight in favour of the proposal. Nonetheless, this would not outweigh the harm regarding the effect of the proposal on the capacity and safety of the highway.

    A Section 106 Agreement was executed as part of the original planning permission, which included obligations for the provision or improvement of infrastructure, including: affordable housing, [name] and Monitoring (SAMM), Suitable Alternative Natural Greenspace (SANG), education, transport, travel plan, artificial turf pitch, MUGA, leisure and open space, local area for play for children (LAP), local equipped area for play for children (LEAP), green infrastructure, medical facility, sports pavilion, sports pitches, sports car park, sustainable urban drainage system and [name].

    The effect of a successful s73 application will be to create a new planning permission, therefore unless a new Section 106 Agreement or deed of variation is completed between all the parties, none of the planning obligations which were attached to the original planning permission could be enforced. The Council states that in the absence of any legal obligation, the appeal proposal would be contrary to the objectives of Policy INF3 of the Local Plan. The appellant has indicated a willingness to complete a legal agreement, however no mechanism to secure the above infrastructure is before me. Nevertheless, as I am dismissing the appeals for other reasons, it has not been necessary for me to pursue this matter further. Appeal Decisions APP/N1730/W/21/3274093 & APP/N1730/W/20/3264492

  6. Section 07

    Conclusion

    For the above reasons, I conclude that the appeals should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 112No official casework-database value to compare
    Extracted decision date · page 1
    20 September 2021Matches the official casework database
    Extracted site visit dates
    1 September 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3274093
Application reference
20/02827/AMCON
Lead case reference
3264492
Planning authority
Hart District Council
Planning authority code
E07000089

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Major dwellings
Appeal type reason
2. Refused permission to vary or remove a condition(s)
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Other
Jurisdiction
Transferred
Link status
Child

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
34 hectares
Floor space
Not recorded
Number of residences
300
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
29 April 2021
Valid date
29 April 2021
Start date
10 May 2021
Planning authority decision date
22 February 2021
Appeal decision date
20 September 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
3444
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21