Skip to main content
Official casework recordDismissedCurrent release

Appeal 3274158

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

raised roof to dormer bungalow to create full two storey dwelling and alteration to parking arrangements.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the area.

  3. Section 04

    Reasons

    No 3 is a detached single storey dormer dwelling with a flat roof single storey side garage extension. It is constructed in red brick and render with concrete roof tiles. It is in a residential area characterised by predominantly single storey dwellings, both with simple roofs and dormer extensions. Two storey dwellings are occasional. Properties are set back from the street and separated from the footway by low walls and in some cases hedgerows and shrubs. The similar sizes, styles and ages of properties results in a relatively coherent character and appearance.

    The appeal proposal would be an upwards extension to create a 2 storey property. It would have a simple pitch roof with a ridge height of over 7m, which would be roughly 1.2m taller than the existing ridge. The roof would have a shallow pitch above the new elevations, resulting in a significantly bulkier building.

    The proposal would not disrupt a group of matching properties. Nevertheless, by virtue of being in a long row of single storey properties, its increased size and scale would be visually obtrusive, including when looking along Moor Field in either direction. In this regard, while a relatively small increase in the height of the property might be assimilated, the addition of a full first floor beneath the roof would not. This is because, irrespective of the changes in topography, the street scene is characterised by properties with single storey elevations, predominantly steep roof pitches and repeating similar front dormer features. The proposal would not be in keeping with the surrounding built environment. It would not make a positive contribution to local distinctiveness or contribute to a strong sense of place.

    At the time of my visit, I saw 2 storey properties in the area. I understand they were designed and built as part of the original residential layout. They appear to have smaller footprints and narrower front elevations, and they are more widely spaced and separated from neighbouring properties, than the appeal property. In contrast, the proposal would clearly be an extended single storey property due to the retention of its original ground floor elevation and layout which would match dormer properties elsewhere in the street. Two storey properties in the area are largely in less prominent locations, they do not form a visual context for the scheme and they do not provide a justification for it.

    Therefore, the proposal would harm the character and appearance of the area. It would conflict with the aims of Policies DMG1 and DMH5 of the Ribble Valley Core Strategy 2008-2028 [name] 2014. These require, among other things, that proposals should be sympathetic in terms of size, scale, massing and style, taking into account layout, visual appearance and the relationship between buildings and its surroundings.

  4. Section 05

    Other Matters

    The parties engaged with one another at the pre-application stage, at which time the Council raised a number of concerns. The scheme would not result in significant overlooking or loss of privacy to neighbouring residential occupiers. The proposed alterations to the frontage would maintain adequate parking provision and avoid harm to highways. These are neutral matters that weigh neither for nor against the proposal.

    The creation of additional internal and enhanced living space would be a private benefit to the appellant. However, the plans illustrate the property already provides a reasonable standard of living accommodation, including 3 bedrooms. The appellant’s desire to extend the property is understandable, but there is little to demonstrate that alternative solutions have been discounted or that there is in any case any compelling justification for the proposal.

    The Town and Country Planning (General Permitted Development) (England) (Amendment) (No.2) Order 2020 introduces permitted development rights to allow the construction of additional storeys on dwelling houses. The right is subject to obtaining prior approval from the local planning authority, which will consider certain matters including the design. However, the appellant has not pursued this option because the necessary roof pitch to match the existing would not produce a pleasing design. Therefore, the theoretical permitted development rights are not a valid fallback position that justify the proposal.

  5. Section 06

    Conclusion

    For the reasons set out above, the proposal would conflict with the development plan and there are no material considerations that would outweigh that conflict.

    Therefore, the appeal should be dismissed. [planning inspector] INSPECTOR

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 205No official casework-database value to compare
    Extracted decision date · page 1
    13 July 2021Matches the official casework database
    Extracted site visit dates
    22 June 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3274158
Application reference
3/2021/0237
Lead case reference
Not recorded
Planning authority
Ribble Valley Borough Council
Planning authority code
E07000124

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
163 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
30 April 2021
Valid date
30 April 2021
Start date
17 May 2021
Planning authority decision date
13 April 2021
Appeal decision date
13 July 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
664
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21