Appeal 3274159
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
demolish existing single storey side extension and construct two storey and part single storey side and rear extension.
Section 02
Decision
The appeal is allowed and planning permission is granted to demolish existing single storey side extension and construct two storey and part single storey side and rear extension at [site address] , Lowdham, [postcode] in accordance with the terms of the application 20/02239/HOUSE, dated 16 November 2020, subject to the following conditions:
The development hereby permitted shall begin no later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Site and Block plans drawing no. 482.03 [name]; and Site plan, floor plans and elevations as proposed drawing no. 482.02 [name].
No development shall take place above slab level until details of the materials to be used in the construction of the external surfaces of the extension hereby permitted have been submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details.
Before the windows and doors are installed into the extension hereby permitted, details of their material, design, specification, method of opening, method of fixing and finish, in the form of drawings and sections of no less than 1:20 scale, shall be submitted to and agreed in writing by the Local Planning Authority. The development shall be carried out only in accordance with the agreed details.
Before any window or door heads and sills are installed, details of their design, material and construction, in the form of scale drawings and material samples/specifications, shall be submitted to and agreed in writing by the Local Planning Authority. The development shall be carried out only in accordance with the agreed heads and sills details.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Procedural Matter
The original drawings were amended during the course of the planning application. The Council’s decision was based on drawing nos. 482.02 [name] and 482.03 [name]. For the avoidance of doubt, my recommendation is based on these amended drawings.
The drawings were amended to remove a balcony above the single-storey rear extension. The description of the development on the application form included the balcony. Therefore, in the header above I have taken the description of the development from the appeal form and the decision notice, which is an accurate description of the proposal.
Section 05
Background and Main Issue
The appeal site is within the Green Belt and relevant Green Belt policies therefore apply. The National Planning Policy Framework (the Framework) identifies that new buildings within the Green Belt will be inappropriate, save for a number of exceptions, including paragraph 149(c) which relates to the extension or alteration of buildings. Inappropriate development is, by definition, harmful to the Green Belt and should not be approved unless very special circumstances exist to justify a proposal.
As such, the main issue is whether the proposal would be inappropriate development in the Green Belt for the purposes of development plan policy and the Framework.
Section 06
Reasons for the Recommendation
The Framework establishes that new buildings in the Green Belt are inappropriate except in certain circumstances, including where they involve the extension of an existing building, providing that the extension would not result in a disproportionate addition over and above the size of the original building.
Spatial Policy 4B of the [name] (March 2019) (ACS) sets out where new housing development could be acceptable and states that any other development within the Green Belt that is not identified in the policy, such as the proposal before me, shall be judged according to national Green Belt policy. This approach is reflected in chapter 10 of the Council’s Householder Development Supplementary Planning Document (November 2014) (SPD).
The Framework defines ‘original building’ as ‘a building as it existed on 1 July 1948, or, if constructed after 1 July 1948, as it was built originally.’ However, the term ‘disproportionate’ is not defined. The Council mentions a ‘rule of thumb’ threshold of a 30%-50% increase in volume, footprint and/or floor space as being disproportionate. However, given the lack of any such criteria in 2 the development plan, this ‘rule of thumb’ is a guide only and a judgement is required in any given case.
The Council’s calculations, which have not been challenged by the appellant, show that the proposed extension would result in an increase of approximately 31.87% of the floorspace, 50.54% of the footprint, and 23.26% of the volume of the original building. As such, the increases to the floorspace and volume of the building would fall within or below the 30%-50% ‘rule of thumb’. While the increase to the footprint would be above the upper limit of this threshold, the proposal would result in a reduction of the current footprint of the building.
Size is more than a function of floorspace, volume and footprint and includes bulk, mass, and height. The proposed extension has been designed to be subservient to the original dwelling, with a set-back from the front elevation and the ridge set down from the main roof. The first-floor addition would partially fill in space between the property and the neighbouring dwelling. However, that does not dictate that the proposal would be disproportionate in scale when assessed against the original dwelling. Overall, taking account of the percentage increases identified above and the subservient nature of the design, I am satisfied, as a matter of judgement, that the addition to the original building would not be disproportionate to the original property.
The Council has referred to the loss of openness that would arise as a result of the proposal, which would extend closer to No.7 at first floor level. However, the Framework does not seek to avoid all impact on openness and there is no requirement in national policy to undertake a separate assessment on the impact on openness where an extension is not disproportionate over and above the scale of the original property.
Consequently, the proposal would meet the exception in the Framework for an extension or alteration to a building and would not be inappropriate development within the Green Belt. For these reasons, the proposal would satisfy Paragraph 149 of the Framework, Policy 4B of the ACS and chapter 10 of the SPD.
Section 07
[name]
The appeal site is within the Lowdham Conservation area and is also within the setting of the [name] listed building at [address].
In this case, the Council has raised no substantive objection to the proposal in terms of its impact on these heritage assets, subject to certain conditions regarding the details of the doors, windows, brick bonding and render that would be used. The proposal would replace a single-storey side extension of no architectural merit. The replacement extension has been designed to be subservient to the main dwelling and would be finished in materials that would tie in with the existing house and surrounding properties. Although the first-floor addition would reduce the apparent gap between the dwelling and the neighbouring property to a degree, sufficient space would remain to enable the individual character of each property to be appreciated. As such, the proposal would preserve the character and appearance of the conservation area and would not detract from the setting of the listed building. Accordingly, it would meet the requirements of sections 72 (1) and 66 (1) of the Planning (Listed Buildings and Conservation Areas) Act. 3
Section 08
Conditions
In addition to the standard time limit condition and a condition specifying the approved plans is necessary to provide certainty and in the interests of proper planning.
The submitted drawings, Design and [name] and application form provide details of the materials to be used, which would be in keeping with the existing building. It would therefore be unnecessary for sample panels to be provided, as requested by the Council, although it is necessary for a condition requiring full details of the external materials of the extension to be submitted and approved by the Council prior to any construction above slab level, in the interests of the character and appearance of the Conservation Area.
In the interests of the character and appearance of the Conservation Area, it would be necessary for a condition requiring details of the windows, including window or door heads and sills, to be submitted to and approved by the Council prior to the installation of these features.
Section 09
Conclusion and recommendation
For the reasons given above the proposal would not amount to inappropriate development in the Green Belt and would comply with relevant policies of the development plan and the Framework. Having had regard to that and all other matters raised, I recommend that the appeal should be allowed and planning permission granted subject to the conditions listed above.
Section 10
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report and, on that basis, I agree with the recommendation and shall allow the appeal and grant planning permission subject to the conditions above.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 211No official casework-database value to compare
- Extracted decision date · page 1
- 13 December 2021Matches the official casework database
- Extracted site visit dates
- 9 August 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3274159
- Application reference
- 20/02239/HOUSE
- Lead case reference
- Not recorded
- Planning authority
- Newark & Sherwood District Council
- Planning authority code
- E07000175
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 900 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 30 April 2021
- Valid date
- 30 April 2021
- Start date
- 8 June 2021
- Planning authority decision date
- 25 February 2021
- Appeal decision date
- 13 December 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 7473
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21