Appeal 3274342
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
formation of vehicular access.
Section 02
Decision
The appeal is allowed and planning permission is granted for formation of vehicular access at Stanhopea, [site address] , [site address] , [postcode] in accordance with the terms of the application, [name]/2020/0575, dated 15 October 2020, subject to the following conditions:
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan, 1685-01 and 1685-02.
The gates hereby permitted shall be located a minimum of 5m rear of the carriageway boundary and shall open away from the highway in accordance with the approved drawing No. 1685-02.
The access hereby permitted shall not be brought into use until details of the 2.4m x 43m visibility splays in both directions, shown to the near kerbline, have been submitted to and approved in writing by the local planning authority. The visibility splays shall be provided in accordance with the approved details prior to the access being brought into use and shall thereafter be kept free of all obstructions to visibility over a height of 900 mm above the adjacent carriageway level.
The access hereby permitted shall not be brought into use until the access drive has been surfaced, and thereafter maintained, in a bound material for a minimum distance of 5m back from the carriageway edge in accordance with approved drawing No. 1685-02.
Within three months of the development hereby permitted being brought into use, the existing site access made redundant as a consequence of the development hereby permitted shall be permanently closed and the access crossing reinstated as verge in accordance with drawing No. 1685- 02.
Section 03
[name]
The Government published, on 20 July 2021, a revised version of the National Planning Policy Framework (the ‘Framework’). I have had regard to the revised document as a material consideration in my decision. In this instance, the issues most relevant to the appeal remain unaffected by the revisions to the Framework. I am therefore satisfied that it is not necessary to seek the parties comments on the revised Framework, and I consider no party would be disadvantaged by this approach.
Section 04
[name]
The main issues are: • Whether the proposal would be inappropriate development in the Green Belt having regard to the Framework and relevant development plan policies; • The effect of the development on the character and appearance of the area; and • Is the harm by reason of inappropriateness, and any other harm, clearly outweighed by other considerations, and if so, does this amount to the very special circumstances required to justify the proposal.
Section 05
Reasons
Part 6 of Policy SS10 of the Staffordshire Moorlands Local Plan (the ‘Local Plan’) states that strict control will be exercised over inappropriate development in the Green Belt, only allowing for exceptions as defined in Government policy. Government policy is set out in the Framework and, as highlighted by both parties, paragraph 150 of the Framework identifies that engineering operations are not an inappropriate form of development in the Green Belt providing they preserve its openness and do not conflict with its purposes.
The proposed vehicular access would involve dropping the kerb on [site address] , laying a new tarmac surface between the kerb and the house and the installation of entrance gates flanked by stone walls. It appears that previously a stone wall ran continuously along the frontage of the site, but there is now a gap in the wall in the position where the access is proposed.
At present much of the area the tarmac would cover is already surfaced with gravel. The change of surfacing material from gravel to tarmac would not have any material impact on openness. The area of tarmac that would cover the grass, including that on the highway verge, would have a more urbanising appearance, but it would not affect openness in a visual or spatial sense.
However, the provision of the entrance gates and flanking stone walls would constitute a form of enclosure being introduced into a part of the garden that currently is open. It therefore cannot preserve openness and hence must be inappropriate development in the Green Belt, as defined by the Framework and policy SS10 of the Local Plan.
Due to the modest height and length of the stone walls and the permeable design of the gates, the harm to openness would be limited. Nonetheless, paragraph 148 of the Framework advises that substantial weight should be given to any harm to the Green Belt.
Section 06
Character and appearance
The site is positioned within a collection of houses on the south side of [site address] . Many of these, including [address] and [name], have vehicular entrance gates at their frontage. These properties also have stone walls to their front.
Within this context, the vehicular access, although appearing more urbanising than the existing grass, would not appear incongruous. Moreover, the entrance gates would have a simple rustic design and the stone wall would simply reflect the wall along the frontage of the site. The development would be modest in scale and would not appear excessively prominent. Overall, the development would preserve the character and appearance of the area. It would therefore accord with policy DC1 of the Local Plan which aims to ensure development respects the site and its surroundings, and Local Plan policy DC3 which seeks to protect the local landscape.
The Inspector for a previous appeal1 for a similar development at this site concluded that that development would harm the character and appearance of the area due to the extent of hardstanding and the loss of the unbroken walled frontage. As this unbroken frontage wall no longer exists and less grass would be lost by the current scheme, the two proposals are not directly comparable.
Section 07
Other considerations
The appellant states that the existing vehicular access, shared with Foxdale, has poor visibility onto [site address] . The highways authority comments that visibility from this access could be improved by the removal of the stone pillars which flank that entrance. I agree that these pillars restrict visibility from the existing access. Although the resident of Foxdale agrees that the visibility is poor, there is no indication that they would remove the pillars to improve visibility, and in any case there would be no way to ensure this.
The highway authority raise no objection to the proposed access subject to the provision of further details of visibility splays. As such, the proposal would provide the dwelling with an access with better visibility than at present. This is a distinct benefit.
Clearly the proposal would not improve visibility for the residents of Foxdale who would continue to use the existing access. However reducing the volume of traffic using the existing access would be of benefit to the occupiers of Foxdale as it would eliminate the possibility, albeit slim, of cars from the dwellings confronting each other at the access. This access is not wide enough for two cars to pass, so in this scenario may require a vehicle to wait partially on the highway to allow a car to leave the access first. This would be a risk to highway safety.
Overall, I consider these considerations carry significant weight. 1 [name]/B3438/A/12/2174657
Section 08
Green Belt Balance
Paragraph 148 of the Framework sets out that very special circumstances will only exist if the harm to the Green Belt, and any other harm, is clearly outweighed by other considerations. In this case I find the other considerations identified above do clearly outweigh the harm that I have identified. Therefore, looking at the case as a whole, I consider that very special circumstances exist which justify the development.
The Inspector of the previous appeal found the only consideration to weigh against the harm to the Green Belt was the preference of the appellant to have a separate access. However as I have evidence relating to the safety of the existing access before me which, it would appear, was not before the previous Inspector, there is a material difference between the two cases.
Section 09
Conditions
I have considered the Council’s suggested conditions, including those suggested by the highways authority. Where necessary, and in the interests of clarity and precision, I have slightly altered the conditions to more closely reflect the advice in the Framework and the Planning Practice Guidance.
The standard condition relating to the commencement of development and a condition identifying the approved plan are necessary in the interests of certainty.
I have also imposed the suggested conditions relating to the provision of access gates, visibility splays and the closing up of the existing access. I have included the suggested condition relating to the surfacing of the driveway, however I have amended it by removing the unnecessary requirement for the driveway beyond the first 5m to be surfaced with porous materials. This requirement would not reflect the proposal plans where the drainage system is shown as being the existing storm water drainage channel and a large underground storage tank, which the highways authority, in their consultation response, consider is acceptable. These conditions are all necessary in the interests of ensuring highway safety.
I have not attached the condition which prevented the access from being brought into use until that part on the public highway was completed, as this seemed very unlikely and so the condition is unnecessary.
Section 10
Conclusion
The development does not accord with the development plan taken as a whole but there are material considerations to suggest the decision should be made other than in accordance with the development plan. Therefore, for the reasons given, and having had regard to all other matters raised, the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 704No official casework-database value to compare
- Extracted decision date · page 1
- 27 July 2021Matches the official casework database
- Extracted site visit dates
- 13 July 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3274342
- Application reference
- SMD/2020/0575
- Lead case reference
- Not recorded
- Planning authority
- Staffordshire Moorlands District Council
- Planning authority code
- E07000198
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 0 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 4 May 2021
- Valid date
- 4 May 2021
- Start date
- 4 June 2021
- Planning authority decision date
- 11 February 2021
- Appeal decision date
- 27 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 1197
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21