Skip to main content
Official casework recordAppeal WithdrawnCurrent release

Appeal 3274501

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described in the application form as “single and two storey side to rear extension; single storey rear extension; alterations to roof to form end gable and rear dormer; installation of three rooflights in front roofslope; reduction of loft size (part retrospective)”.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for “single and two storey side to rear extension; single storey rear extension; alterations to roof to form end gable and rear dormer; installation of three rooflights in front roofslope; reduction of loft size (part retrospective)”, at [site address] , in accordance with the terms of the application (reference P/0353/21, dated 28 January 2021), subject to the conditions set out in the attached Schedule of Conditions.

  2. Section 03

    Procedural matter

    The development which is the subject of this appeal has already been carried out, in part, and I have considered the appeal on this basis.

  3. Section 04

    Main issues

    The first main issue to be determined in this appeal is the effect of the development for which permission is sought on the appearance of the host building and its surroundings. The second is the effect of the development on the residential amenities of neighbours (whether unacceptable harm would be caused by overbearing appearance or overshadowing or intrusion on privacy).

  4. Section 05

    Reasons

    [site address] is located within a residential area of Stanmore, which is characterised by a range of house types in an established suburban location. [address] accommodates a pair of two-storey semi-detached houses that have been built behind frontage properties in [address] and it provides access Appeal Decision: APP/M5450/D/21/3274501 to these relatively new houses between the side boundaries of numbers 120 and [address]. The two houses in [site address] share an access drive and turning area, each with its own front garden. Of the two houses, however, number [site address] has much the smaller back garden, with the longer garden at number 2 wrapping around its rear boundary.

    Various extensions and alterations have been carried out to the house at number [site address] , which is now much larger than its neighbour, and planning permission is now sought to regularise the development, subject to some modification.

    Policies in the Development Plan are aimed at protecting and enhancing the environment generally, as well as protecting residential amenities. The general aim of achieving good standards of design derives, in particular, from Policy D3 of ‘The London Plan’ (dated March 2021), Policy CS1B of the ‘[name] (dated 2012) and Policy DM1 of the ‘Harrow Development Management Policies’ (dated July 2013).

    The Council’s ‘Supplementary Planning Document: [name] (which was adopted on 15 December 2010) is also relevant, although it does not have the same force as Policies in the Development Plan.

    Among other things, national planning policies (as set out in the ‘National Planning Policy Framework’) also continue to emphasise the importance of achieving good design and they make it plain that new development should be sympathetic to its surroundings. The recent revisions to the ‘National Planning Policy Framework’ do not fundamentally affect these basic planning principles, in the context of this appeal.

    The house at number [site address] [site address] has a fairly extensive planning history, as recorded in correspondence. It has been explained that, in 2019, a “record of compliance with notification procedure for larger home extensions” had been issued in relation to a single-storey rear extension to the house (reference P/3358/19/PRIOR). Separately, in September 2019, a certificate of lawful proposed development was granted for the construction of a dormer and other works to the roof (reference P/2997/19). Thirdly, planning permission was granted in November 2019 for a single-storey front extension and a two-storey side extension to the house (reference P/3898/19).

    Nevertheless, as was pointed out in the planning permission, the proposed roof alterations could not have been carried out lawfully at the same time as the works for which planning permission had been granted, without a new grant of planning permission. Thus, the development for which planning permission is now sought includes a range of different elements, notwithstanding the previous approvals.

    Nevertheless, the previous approvals are material considerations in this appeal.

    The single-storey rear extension is a substantial construction, built close up to the side boundary of the plot (with number 2) and extending 6 metres from the rear of the original house (as drawn). It creates a high wall against the neighbours’ boundary and no doubt has some impact on their outlook and the shadowing of their garden during the afternoon. The rear of the two houses faces approximately north, however, and the garden areas immediately 2 Appeal Decision: APP/M5450/D/21/3274501 adjacent to the pair are inevitably overshadowed to some extent. As drawn, the single-storey rear element at number [site address] would not exceed 3 metres in height and the impact on the neighbours’ outlook would be acceptable in planning terms, provided that the dimensions are adhered to.

    The rear dormer window is clumsy in appearance, adding a “box dormer” structure to the rear of the original roof. Even though roof tiles have been used as a facing material, in order to match the main roof slopes, the projecting form is awkward and ungainly, and it detracts from the appearance of the original building. Nevertheless, it must be recognised that such a form of construction is commonplace and that such dormers are often constructed as “permitted development”. In itself, in short, this element is acceptable in planning terms, as are the associated works to the roof.

    The two-storey “side to rear extension” increases the width of the building and incorporates a first-floor extension at the rear. It is inset from the side boundaries, preserving clear separation from number 2 and maintaining a minimum distance from the boundary with the back gardens of properties in [address] (which are relatively long gardens, moreover). It is designed in a traditional style with a hipped roof that is in harmony with the existing building.

    The various elements reflect the previous approvals although, together, they create a very significant change to the original building, and it is necessary to consider the project as a whole as well as the individual elements.

    Assessing the scheme as a whole, however, I have concluded that the scheme for which planning permission is now sought would not unduly harm the amenities of nearby residents, in particular the occupants of number 2 [site address] , bearing in mind the urban setting and the implications of the previous approvals and normal permitted development criteria.

    The scheme would have a marked effect on the appearance of the building and the existing roof form has been altered by the conversion of the original hipped roof (which is still a feature of number 2) to create a “semi-hipped” structure combining a small gable with a hipped lower roof, continuing the roof of the first-floor extension. Nonetheless, the finished scheme would not cause unacceptable harm to the character or appearance of the host building and its surroundings and would not be so unsatisfactory in appearance as to justify a refusal of planning permission, in all the circumstances.

    Evidently, the appeal site lies within an established urban area, which is “sustainable” in planning terms, and the proposed development makes a useful addition to the accommodation at [site address] [site address] . I have concluded that the completed project would not be materially in conflict with the Development Plan. In short, I am persuaded that the scheme before me can properly be permitted, subject to conditions and, although I have considered all the matters that have been raised in the representations, I have found nothing to cause me to alter my decision.

    I have, however, also considered the need for conditions and, in imposing conditions, I have taken account of the conditions suggested by the Council in the usual way (without prejudice to their main arguments in the appeal), subject to modifications necessary, in my opinion, in the interests of clarity and 3 Appeal Decision: APP/M5450/D/21/3274501 enforceability. In particular, I have concluded that a condition is necessary, to define the planning permission by reference to approved drawings (including “proposed” plans and elevations).

    I also accept that an additional condition is necessary to prevent the future insertion of openings in the flank elevations of the building, in order to protect neighbours’ privacy.

  5. Section 06

    SCHEDULE OF CONDITIONS

    The development hereby permitted shall have been carried out in accordance with the following approved drawings: unnumbered [name] site plan ( [site address] :1250); drawing number 02R Revision A1 (“[name]”); drawing number DRW-01 REV-A1 (untitled).

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that order with or without modification), no windows, doors or other openings shall be installed in the flank elevations of the development hereby permitted without the prior permission in writing of the local planning authority. 5

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 285No official casework-database value to compare
    Extracted decision date · page 1
    1 October 2021Matches the official casework database
    Extracted site visit dates
    24 August 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3274501
Application reference
P/0353/21
Lead case reference
Not recorded
Planning authority
London Borough of Harrow
Planning authority code
E09000015

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
55 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Appeal Withdrawn
Decision category
Withdrawn
Received date
6 May 2021
Valid date
6 May 2021
Start date
22 July 2021
Planning authority decision date
24 March 2021
Appeal decision date
1 October 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
4122
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21