Appeal 3274599
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the demolition of an existing vacant public toilet block and vehicle workshop and erection of a single storey rear extension to be used as vehicle workshop/cleaning bay.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Planning permission was granted1 in 2017 for a rear extension to the premises (The Approved Scheme). This includes a similar projection but would be shorter, at around 3.6 metres, in comparison to the proposal. It also included high level rear windows and was largely an adaption of existing built form. The approved scheme is therefore substantially different to the proposed development in character and scale.
During my visit I noted that the side and rear walls of the proposal had been largely constructed. I shall take this into account in my decision.
Furthermore, a proposed rear extension at 18 [name] was allowed at appeal2 in 2020. This included the full depth of the plot and had a maximum height of around 4.6 metres. During my visit I noted that this is currently unimplemented.
Section 04
Background and Main Issue
The application was not determined by the Council within the statutorily prescribed 8-week timeframe. As such, following the submission of an appeal it falls to me to determine whether planning permission should be given. In consideration of the Council’s Statement of case, and the evidence before me, the main issue in dispute between main parties is the effect of the proposal on the character and appearance of the area. 1 Planning Application Reference: 17/2419/FUL 2 Planning Appeal Reference: APP/N5090/W/20/3254800
Section 05
Reasons
The appeal site is a corner plot within a commercial area. The host building is a two-storey brick structure that follows the scale and design characteristics of its neighbours. The site and several neighbouring units have rear extensions of various styles and sizes. The side elevation of the building is located close to the back of the footway of [address]. This residential road runs downhill from the site with dwellings being set back a similar distance from the highway. Consequently, the rear of the host building and its corner plot is exposed to views from both [address] and [address]. It is therefore on a prominent site, due to its elevated position and the absence of screening. Due to the utilitarian nature of the rear of the site the site makes a neutral contribution to the character and appearance of the area.
The proposed rear extension would wrap around an existing substation that is within a single-storey building. It would have a maximum height of around six metres and its rear half would step down to about five metres. It would present a tall and wide addition that would harmfully jar with the more open and recessive appearance of built form within the adjacent residential street, offering an abrupt transition. The proposed scheme would therefore be an overt and prominent addition to the [address] streetscene.
Furthermore, its overall length and height would include limited articulation or design features with only high-level windows, providing negligible relief of this largely monotonous form. It would also share limited commonality with the form or scale of the existing building and contrast sharply with it. As viewed from [address] it would extend the existing building and erode the sense of separation between the commercial parade and residential form of development behind.
The approved scheme, although of some scale itself, would include a reduced mass and greater articulation. The approved scheme has a disaggregated mass and would, as such, add more interest to the streetscene than the proposal. Also, the neighbouring approved scheme, would be set away from the corner and follow the recessed building line of dwellings on [address] and the side of the rear garage block. If implemented this would form a more considerate relationship with existing built form, a merit that is absent from the proposed development. As a result, previously approved extensions do not set a precedent that offers significant support for the proposed development.
Consequently, the proposal would result in a disproportionate and bulky extension that would adversely harm the character and appearance of the host building and streetscene. For this reason, the proposal would be contrary to policy CS5 of the [name] (2012) and policy DM01 of the Barnet Development Management Plan (2012). These policies, among other matters, seek development that would protect the borough’s character, create high-quality places and respect the pattern of surrounding built form.
Section 06
Other Matters
The car showroom, on the opposing corner of the appeal site, is a free-standing building of contemporary design. It is set well away from [address] and as such the effect of its design and mass, on the adjacent residential street, is limited.
The appellant asserts that the proposal is necessary to ensure that the site and business remains economically sustainable. However, there is limited evidence to illustrate this point. It is therefore unclear the extent of any greater benefit garnered between the approved scheme and that proposed.
Section 07
Conclusion
Although the National Planning Policy Framework seeks to support sustainable economic growth, this is not without regard to its requirement for development to be sympathetic to local character. As such, there are no material considerations that indicate the appeal should be determined other than in accordance with the development plan. I therefore conclude that the appeal is dismissed, and planning permission is refused.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 390No official casework-database value to compare
- Extracted decision date · page 1
- 24 November 2021Matches the official casework database
- Extracted site visit dates
- 15 November 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3274599
- Application reference
- 20/5360/RCU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Barnet
- Planning authority code
- E09000003
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- 8. Failed to give notice of its decision within the appropriate period (usually 8 weeks) on an application for permission or approval
- Appeal reason
- Failure
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.03 hectares
- Floor space
- 141 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 7 May 2021
- Valid date
- 7 May 2021
- Start date
- 27 September 2021
- Planning authority decision date
- Not recorded
- Appeal decision date
- 24 November 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 6510
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 20 August 2026 at 16:25