Appeal 3274814
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
to erect first floor extension above garage.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues are whether the proposal would constitute inappropriate development in the Green Belt and the effect on the openness of the Green Belt.
Section 04
Reasons
Policy GN1 of the adopted West Lancashire Local Plan 2012-2027 (LP) states that development proposals in the Green Belt will be assessed against national planning policy. The relevant national policy is set out in Paragraph 149 of the revised (July 2021) National Planning Policy Framework (Framework). This states that the construction of new buildings in the Green Belt should be regarded as inappropriate other than in respect of the exceptions set out in that paragraph. One of these (sub-paragraph c) comprises the extension or alteration of a building “provided that it does not result in disproportionate additions over and above the size of the original building”. For the purposes of this provision the term ‘original building’ means the building as it existed on 1 July 1948 or, if constructed after that date, as it was originally built.1
The appeal property comprises a large, detached house which stands in a substantial plot and which has an extensive garden to the rear. The original dwelling has previously been extended by means of: 1 Glossary to the Framework on page 70. a) a two storey side extension with a frontage of approximately half the width of the original house and a single storey addition to the side of this (set back from the front elevation); b) a single storey addition to the rear of the double garage (on the other side of the original house to the 2-storey extension); c) a large conservatory to the rear of the dwelling.
The appeal proposal comprises a first floor extension above the full footprint of the double garage and existing addition to the rear of the garage (the ‘snug’). The appellant’s assessment that the proposal would result in an increase of 14% in the volume of the dwelling appears to have been made by assessing the volume of the proposal against that of the house as already extended rather than against the volume of the original building. The Council’s assessment that, in combination with the previous extensions, the proposal would result in an overall increase of 64% compared to the volume of the original building is, therefore, to be preferred.
In my view, the 64% figure is likely to be an underestimate since my observations on my site visit are that the double garage does not appear to be part of the building as originally constructed. Even allowing for the benefit of doubt that the Council has applied to that part of the dwelling, a proposal that leads to an overall increase in volume by 64% would, in my view, clearly result in a disproportionate increase over and above the size of the original building. It is important to note in this context, that paragraph 149 of the Framework refers to disproportionate additions over and above the size (my emphasis) of the original building. Whilst volume is a useful indicator of size, regard should also be had to other matters such as the height and scale of the resultant building.
Although the proposal would not further increase the footprint of the dwelling as already extended it would add considerably to its height and scale. The secondary and subservient building element, within which the double garage and snug are accommodated, would be replaced by a full height, two-storey extension on the south east side of the house. In combination with the previous additions, this would result in the front and rear elevations being approximately twice as long as those of the original building and in very substantial additions to the roof of the property. The outcome would be a building which is of considerably greater volume, scale and visual bulk than that comprised in its original construction.
Having regard to these resultant effects, I find that the proposal would result in disproportionate additions over and above the size of the original building. The proposal does not, therefore, meet the criteria set out in paragraph 149 of the Framework and would constitute inappropriate development in the Green Belt. Paragraph 147 states that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances.
Reference has been made by both parties to Policy GB4 of the Council’s ‘Development in the Green Belt’ Supplementary Planning Document (SPD) (October 2015) which advises, in relation to proposed extensions, that proposals should satisfy the following criteria: • the proposal, together with any previous extensions, alterations and non-original outbuildings, would not result in an increase of more than 40% above the volume of the original building (paragraph b), and • the design of the extension or alteration is in keeping with the original form and appearance of the building and does not materially harm the openness of the Green Belt through excessive scale or bulk or by virtue of its location (paragraph c).
The appellant accepts that the proposal would result in additions that exceed the 40% threshold. However, she points to a statement within the SPD that the 40% figure is only a guide and argues that an exception should be made because she considers that there would be a very limited effect on the openness of the Green Belt. The Council has rejected that argument.
In my view, the provisions within paragraph c) of Policy GB4 are not fully consistent with the Framework. Unlike other parts of paragraph 149, paragraph 149 c) does not require or indicate that regard should be had to the effect on openness when making a decision as to whether the exception criteria are met. When assessing a proposal under this part of paragraph 149, any potential effect on openness is to be taken into account in considering whether there would be any other harm to the Green Belt. It does not, however, form part of the decision making process as to whether the proposal meets the exception test. Accordingly, I have attached very little weight to that part of the SPD in reaching my conclusion that the proposal would amount to inappropriate development in the Green Belt.
The case law referred to by the appellant2 has established that openness has a spatial as well as a visual aspect and that the absence of visual intrusion does not itself mean that there is no impact on openness. I agree that there is no express requirement on the decision maker to refer to visual impact when assessing the effect on openness but consider this to be a relevant factor in respect of the current appeal.
The appeal site benefits from a very high degree of screening as a result of the substantial vegetation to its various boundaries and the proposed extension would not be seen from neighbouring gardens or from many public vantage points. However, I saw on my site visit that significant parts of the existing roof, the front chimney and some upper parts of the front elevation are evident in views from [address]. Those views are available as one approaches the property from the north west. Although filtered to a significant degree by intervening trees at the time of my visit these views are likely to be more open in winter.
In my assessment, the extensive area of additional roof created by the proposal would be visible in those views. It would be clear to the viewer that the building has been extended beyond the visual ‘full stop’ that is currently provided by the front chimney. The viewer would, accordingly, gain a visual 2 Turner v SSCLG and East Dorset Council [2016] [name] 466 and R (on the application of [name] (Tadcaster) and others) v North Yorkshire County Council [2020] UKSC 3 appreciation of the building’s increased scale and bulk and there would be a reduction in the visual component of openness. Although the footprint of the building would not be increased, there would be some, albeit limited, harm as a result of that reduction in the visual component of the openness of the Green Belt.
Paragraph 148 of the Framework requires that substantial weight is given to any harm to the Green Belt. It advises that the very special circumstances required to justify the approval of inappropriate development will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the proposal, is clearly outweighed by other considerations. The benefits to be derived from the proposal in terms of increased living accommodation and the provision of a different access to the bedroom over the snug would be private benefits that would not outweigh the harm to the Green Belt. These do not, therefore, amount to the very special circumstances needed to justify a grant of permission in this appeal. Accordingly, I find that the proposal conflicts with LP Policy GN1 and with the Green Belt policies in part 13 of the Framework.
Section 05
Conclusion
For the reasons set out above, I conclude that the appeal should fail.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1122No official casework-database value to compare
- Extracted decision date · page 1
- 17 August 2021Matches the official casework database
- Extracted site visit dates
- 10 August 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3274814
- Application reference
- 2020/0983/FUL
- Lead case reference
- Not recorded
- Planning authority
- West Lancashire District Council
- Planning authority code
- E07000127
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 80 m²
- Number of residences
- 1
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 11 May 2021
- Valid date
- 11 May 2021
- Start date
- 13 July 2021
- Planning authority decision date
- 17 February 2021
- Appeal decision date
- 17 August 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 1916
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21