Appeal 3274826
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
single storey rear extension, raise roof and form rooms in roof-space.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposal on the character and appearance of the surrounding area.
Section 04
Reasons
[site address] (No 104) is a detached bungalow positioned within a row of dwellings to the eastern side of the road. To either side of [address] there are long lines of houses and bungalows, many of which are of a similar age and style. Those to the east of the road mostly have similar sized plots, with deep rear gardens beyond which are fields. These houses and bungalows are set back from the public highway behind comparable sized front gardens, and taken together they form a long linear row of buildings that frames the eastern side of the road.
The row of dwellings within which the appeal property is positioned are mostly bungalows, and they have simple forms, many with hipped roofs. Several of the bungalows have been extended, including rooms in the roofs and also rear extensions. There are houses to each end of the row, and these form tall termini to the bungalows between them. The similar heights of the bungalows, their simple forms and their modest sizes, gives a harmonious and distinct appearance to the row.
The proposed roof and rear extensions to No 104 would substantially increase both the depth and height of the building. The increased height would be visible from some distance away above the roofs of the nearby bungalows. Particularly when approaching from the south the building would appear unduly prominent within the row. Whilst the appellant refers to the roof needing to be raised for the financial viability of the scheme and to provide head-space for the rooms of the first floor, the extent of the height increase and the long length of the extended dwelling would be harmfully apparent above the roofs of other bungalows. The combined effect of the roof and rear extensions would create a tall, long and bulky building, that would have an overbearing and dominating juxtaposition with the modest properties either side.
Moreover, the crown roof and gables under truncated hips would appear overly contrived and at odds with the modest dimensions and simple forms of nearby bungalows. The scheme would provide a family home within a generous plot. Nevertheless, this has to be considered within the context of the impact of the scheme upon the neighbouring bungalows and also upon the character and appearance of the area. Taken as a whole, the large size and the form of the extended dwelling would be a disruptive and incongruous addition to the row.
The appellant has drawn my attention to the different styles of houses and bungalows in the area. The rows of housing along [address] are distinct from each other, with each forming a separate entity either side of the road. There is a greater variety of properties and extensions to the west side of the road. However, this variety does not erode the unity of those bungalows that form the distinctive row to the eastern side of the road, of which the appeal property forms part.
I saw at my site inspection that [address] (No 108) is very different from the other houses and bungalows in the row to the east of the road, particularly as regards size, form and materials. These differences make it a unique and prominent addition to the row. Nevertheless, this property and the appeal proposal have different contexts. No 108 is at one end of the ribbon development whereas No [address] of bungalows, with modest sized properties either side. Given these differences, No 108 does not form a binding precedent for approving the appeal scheme. Moreover, if I were to allow the appeal, [address] would be overwhelmed by the close proximity of being between two large and tall buildings.
The appellant has also referred to a fallback alternative being available under permitted development rights. However, it is not the role of an Inspector when dealing with an appeal for planning permission to conduct an exercise as to lawful use and operation in order to decide whether the appellant might be able to rely on permitted development rights as a fallback. Having regard to the appellant’s comments concerning the head height requirements for a first floor and the limited information provided of what an alternative scheme would look like, the weight that I can attribute to any fallback in this instance is limited.
Consequently, for the reasons given above, the scheme would fail to respect the character and appearance of the area, and this would be contrary to Policy HE2 of the Christchurch and East Dorset Local Plan Part 1 [name] (2014). This seeks amongst other things, high quality development that is compatible with its surroundings, thereby reflecting objectives of the National Planning Policy Framework and those of the National Design Guide.
Section 05
Other Matters
Local residents have raised a number of matters, including concerns with regard to the levels of sunlight experienced and increased shading. However, following my findings on the main issue and as I am dismissing the appeal, I have not considered these matters further.
Section 06
Conclusion
Thus, for the reasons given above and having considered all other matters raised, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1303No official casework-database value to compare
- Extracted decision date · page 1
- 5 July 2021Matches the official casework database
- Extracted site visit dates
- 22 June 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3274826
- Application reference
- 3/21/0155/HOU
- Lead case reference
- Not recorded
- Planning authority
- Dorset
- Planning authority code
- E06000059
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 11 May 2021
- Valid date
- 11 May 2021
- Start date
- 21 May 2021
- Planning authority decision date
- 29 April 2021
- Appeal decision date
- 5 July 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 245
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21