Appeal 3275377
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
alterations to roof to form end gable and rear dormer; rooflights in front and side roofslopes (retrospective).
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
The Council’s decision letter describes the development as retrospective. It is clear from the evidence provided and my site visit that the roof alterations and rear dormer roof extension had been constructed. I shall determine the appeal on this basis accordingly.
I have used the Council’s description of the development in reaching my decision as it more fully describes the details of the development than that given on the original planning application form. The appellant’s appeal form also makes reference to the updated description. I shall determine the appeal on this basis accordingly.
Section 04
Main Issue
The main issue is the effect of the development on the character and appearance of the host property and the area.
Section 05
Reasons
The appeal property is a two storey semi-detached extended dwelling located in a mature well-established residential area, opposite a terrace of commercial properties. Although there is some variation in the design and style of the other properties in the area, the appeal property forms part of a row of semi-detached properties that have similar features with distinctive double projecting gabled front bay windows and hipped tiled roofs.
The appeal site has an extensive planning history relating to proposals to extend the property, including planning permission for a two storey side extension with a hipped roof in 20181. The development entails the alterations to the previously approved scheme and involves the retention of the hipped to gabled roof extension with a raised roof over the main house and a rear flat roof dormer extension across the full width of the recently extended roof. The dormer extension is inset from the eaves and shared party wall with the adjoining property and built up to the ridge line of the host property.
Whilst the use of a hipped roof design over the two storey side extension assists in integrating the development with the host property, the awkward design and the appearance of the roof additions are very much at odds with the roof design of the original and adjoining dwelling and the more traditional hipped roofs of similar properties in the area. The gabled roof extension and rear dormer result in substantial bulk being added to the roof plane with only narrow peripheral parts of the sloping roof being evident.
These shortcomings are exacerbated by the development’s position, which is visible from a number of public vantage points along [address]. The consequential harm is not in my view sufficiently resolved by the limited effect of the rear dormer extension on the street scene. In any case, the dormer extension is visible at the rear from the surrounding properties and to a more limited extent from [address] to the north of the site.
The development, by virtue of its scale, siting and design, fails to achieve an appropriate degree of subordination to the host property and detracts from the architectural integrity of the host property. As such, I consider that the roof alterations and dormer extension result in incongruous and out-of-keeping additions that cause harm to the host property and the area. As such, I consider that the development adversely harms rather than positively contributes to the character and appearance of the host property and the area.
I have considered the appellant’s arguments that the design and layout of the roof alterations and rear dormer roof extension have been carefully considered in order to take into account the character of the host property and the other roof extensions in the area. Whilst the use of matching materials and fenestrations assist in integrating the extension with the host property, these aspects again do not overcome the adverse effects outlined above.
Consequently, I conclude that the development has a harmful effect on the character and appearance of the host property and the area. It is contrary to the overall aims of Policy D3 of the London Plan 2021, Core Policy CS1.B of the [name] 2012, Policy DM1 of the Harrow Development Management Policies Local Plan 2013 and the Council’s Supplementary Planning Document: [name] 2010. These policies and guidance, amongst other things, seek to ensure that new development demonstrates a high quality design that respects and responds positively to existing buildings and the local character and distinctiveness of the area.
Section 06
Other Matters
I have considered the appellant’s comments regarding the lack of formal objections from the neighbours or third parties to the development. Whilst this maybe so, this does not preclude the proper planning assessment of the impact 1 P/2036/18 of the development on the host property and the area and is not a determinative factor on its own.
The appellant states that the development constitutes a sustainable form of development. I have considered the various benefits put forward by the appellant that the development brings including the scheme’s high quality design, making the efficient use of land and providing additional accommodation to meet the needs of the appellant’s family. [name] have given them some weight, these benefits would not be sufficient to outweigh the harm I have identified. For all these reasons, there are no other material considerations to outweigh the development plan conflicts identified.
Section 07
Conclusion
For the reasons given above, and having regard to all other matters raised, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 469No official casework-database value to compare
- Extracted decision date · page 1
- 29 September 2021Matches the official casework database
- Extracted site visit dates
- 15 September 2021 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3275377
- Application reference
- P/3071/20
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Harrow
- Planning authority code
- E09000015
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 71 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 19 May 2021
- Valid date
- 19 May 2021
- Start date
- 16 August 2021
- Planning authority decision date
- 26 April 2021
- Appeal decision date
- 29 September 2021
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 3980
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21