Skip to main content
Official casework recordAllowedCurrent release

Appeal 3275394

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

[name], [name] and Formation of a [name].

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for [name], [name] and Formation of a [name] at [site address] , [site address] , [site address] , Feock [postcode] in accordance with the terms of the application, Ref PA20/10849, dated 7 December 2020, and subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: [name] ([name] 001); Block Plan as Existing ([name] 002); Plans & Elevations as Existing ([name] 003); Block Plan as Proposed ([name] 004); Plans & Elevations as Proposed ([name] 005, [name]); and Cross Section Through the Site ([name] 006).

    Prior to the installation of any cladding, stonework, fascias, timber, louvres, render, roofing, balustrading and fenestrations, details of the materials, including sizing, method of construction or laying, method of opening (where relevant), and final finish and colour, to be used in the construction of the external surfaces of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved samples/details, provided prior to the first use of the approved first-floor extension and retained as such thereafter.

  2. Section 03

    Application for costs

    An application for costs was made by [name] against Cornwall Council. This application is the subject of a separate Decision.

  3. Section 04

    Preliminary Matters

    A revised version of the National Planning Policy Framework (the Framework) was published in July 2021. However, as its provisions that are most relevant to the appeal have not materially changed, no parties will have been prejudiced by my having regard to the latest version in reaching my decision.

    As the appeal proposal is located within an area of outstanding natural beauty (AONB), I have had regard to the purpose of conserving and enhancing the natural beauty of the area as set out in section 85 of the Countryside and Rights of Way Act 2000 (as amended). The development plan and the Framework also seek to protect such designated landscapes, recognise the intrinsic character and beauty of the countryside, and attach great weight to conserving and enhancing the landscape character and scenic beauty of AONBs, which have the highest status of protection in relation to these issues.

  4. Section 05

    Main Issue

    The main issue is whether the proposed development would conserve and enhance the landscape and natural beauty of the [name].

  5. Section 06

    Reasons

    Located on the promontory known as [site address] , the appeal site contains a single-storey bungalow ( [site address] ) set in an elevated position above [name]. The site is situated within a relatively built-up area of residential properties which extend along the highway in both directions from the site. Built form in the locality includes a mixture of properties, such as bungalows, cottages and some larger houses with traditional designs, and some more contemporary buildings, including for example the recently constructed property (Lower [site address] ) positioned below the bungalow. Although many of the surrounding properties are relatively large, the generally sizeable plots in the locality ensure that the suburban area has a spacious character and verdant appearance and built form does not read as overly dominating the creek-side landscape. The site is situated within the Roseland area of the [name] section of the [name]. This area includes, amongst other aspects, various scattered settlements and, as described by the AONB Management Plan, a tranquil and well-managed farmed landscape with a globally renowned, stunning coastline.

    The proposed development would involve, amongst other aspects, external alterations, a roof extension to create a new first-floor, and re-building the existing garage and erecting a glazed link structure to connect it to the dwelling. Comprehensively altered, the extended building would have a contemporary design, with a flat roof finish and extensive areas of glazing. Views of it would to some extent be limited due to, for example, the presence of boundary treatment, soft landscaping/trees, and the degree of separation with the other side of the river. The proposed development would also be seen in the context of other built form. Nevertheless, I observed on my site visit that it would be visible from some points in the locality, in particular from the creek.

    The surrounding area contains some similar contemporary buildings, including for example Lower [site address] , and the appeal proposal would not result in a property out of scale with its context. Nevertheless, the proposed development would read as significantly increasing the mass and scale of built form on the site. The extended property would therefore appear as a more prominent feature than the modest form and scale of the existing bungalow and it would increase the dominance of built form to the detriment of the locality’s character and appearance. The rectilinear form of the proposed development and its extensive glazing – including glazed balconies – would also attract the eye and thus increase its presence in the locality, particularly from sun glint and/or light spill from the large areas of glazing. The addition of louvres over parts of the glazing does not lead me to a different conclusion. Furthermore, the flat roofed building would be likely to be seen from some points as sitting directly behind Lower [site address] . In such instances, even if fleeting, it would thus appear as forming one large, tiered flat-roof development rising up the bank of the river. In coming to this view, I have taken into account that the first-floor extension would be set-back and positioned centrally and that the extended building would have a similar footprint and width and would only be approximately 750mm higher than the ridge of the pitched roof bungalow. That the existing bungalow has been extended in the past and contains a reasonable level of glazing does also not lead me to a different conclusion.

    Although the harm I have identified would be relatively limited and localised, the proposed development would, for the reasons above, nevertheless not conserve and enhance the natural beauty of the AONB landscape, which has the highest status of protection and to which I give great weight. I therefore find that it conflicts with Policies 12 and 23 of the Cornwall Local Plan Strategic Policies 2010 - 2030 and Policies LS1, LS2 and D1 of the Feock Neighbourhood Development Plan 2017 - 2030 (NDP). Amongst other aspects, these: seek to protect and enhance the seascape and landscape; and require sensitively designed development which minimises landscape impact and which ensures Cornwall’s enduring distinctiveness, sustains local character, and conserves and enhances the landscape character and natural beauty of the AONB. The proposal would also be inconsistent with: the provisions in the Framework in relation to achieving well-designed places and conserving and enhancing the natural environment; and Policies MD9, MD16 and SCC9.01 of the AONB Management Plan 2016 which require development to respond to local character and address and respond to landscape sensitivity and capacity.

  6. Section 07

    Planning Balance

    I have found that the development would not conserve and enhance the natural beauty and landscape of the [name]. However, the harm I have identified would be relatively localised and limited. Notwithstanding the great weight given to conserving and enhancing the landscape and scenic beauty of the AONB, I find that the totality of the harm would therefore not be significant.

    In this instance, there is an extant planning permission for a replacement dwelling on the site. Although that scheme was permitted under different circumstances to now, including for example prior to the [name] being made, it could nevertheless be built and the submitted evidence indicates that it would involve the erection of a larger property than the proposed altered and extended building. Although the permitted replacement dwelling, with its pitched rather than flat roofs, would have a different design and would therefore be unlikely to be seen from some vantage points as combining with Lower [site address] to form one larger mass of rectilinear tiered development, it would nevertheless have a notably greater mass than the appeal proposal and considerably more glazing. Accordingly, when considered against this fallback scenario, the effect of the proposed development on the AONB would be neutral. In coming to this view, I have taken into account the design of the extant unbuilt scheme is said to be more in keeping with the properties in the locality and that much of its glazing would be recessed.

    Planning law requires that applications for planning permission be determined in accordance with the development plan unless material considerations indicate otherwise. I place great weight on the purpose of conserving and enhancing the natural beauty of the area. I also attach significant weight to the conflict I have identified with development plan policies and with the provisions in the Framework and the AONB Management Plan. However, in this instance, I find that the above material considerations outweigh the limited harm that I have identified and indicate that the appeal proposal would have a neutral effect on the AONB. This indicates that permission should be granted, notwithstanding that the development does not accord with the above listed development plan policies.

  7. Section 08

    Other matters

    A number of other matters have been raised by interested parties and I have taken them all into account. This includes matters such as precedent setting, the content of various statements in the Design and [name], overlooking/loss of privacy, access issues, loss of boundary treatment and disturbance from construction works. However, whilst I take these representations seriously, I have not been presented with compelling evidence to demonstrate that the appeal proposal would result in unacceptable effects in relation to any of these matters. In addition, the appeal proposal was amended during the Council’s determination of the planning application to include, for example, privacy screens and the obscure glazing of some windows. Consequently, they do not lead me to a different overall conclusion that the appeal should be allowed.

  8. Section 09

    Conclusion and Conditions

    For the above reasons, the appeal is allowed.

    In addition to the standard time limit condition, I have imposed a condition requiring the carrying out of the development in accordance with the approved plans in the interests of certainty. A condition covering external materials is necessary in the interests of the character and appearance of the area. I have however amended the wording to ensure that the details are submitted to and approved by the Council prior to their installation and are provided prior to the first use of the first-floor extension. Given the scale of the proposed development, I have declined to impose a condition relating to construction management and hours as it would neither be reasonable nor necessary.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 954No official casework-database value to compare
    Extracted decision date · page 1
    27 January 2022Matches the official casework database
    Extracted site visit dates
    13 January 2022 (page 1)
  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 954No official casework-database value to compare
    Extracted decision date · page 1
    27 January 2022Matches the official casework database
    Extracted site visit dates
    13 January 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3275394
Application reference
PA20/10849
Lead case reference
Not recorded
Planning authority
Cornwall Council
Planning authority code
E06000052

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Yes
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
19 May 2021
Valid date
19 May 2021
Start date
5 August 2021
Planning authority decision date
26 April 2021
Appeal decision date
27 January 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
9459
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21