Appeal 3275414
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
11 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension: 6.00 metres deep, 3.00 metres maximum height and 3.00 metres high to the eaves.
Section 02
Decision
Appeal A is dismissed, and Appeal B is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters
As set out above, there are two separate appeals on this site, both for similar large rear extensions but Appeal A proposing an extension of 6m depth, and Appeal B proposing a 5m depth. A letter of objection was received for both, and the Council refused both appeals for the same reason.
The Council’s delegated reports repeatedly refer to the impact of the development upon No 6. This appears to be a simple error and should refer to No 8. I have considered it as such.
Section 05
Main Issue
The main issue for both appeals is whether the proposed development would be granted planning permission by Article 3, Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GDPO) and the impact of the proposed development on the amenity of adjoining premises with regard to light and outlook.
Section 06
Appeal A
The appeal property is a mid-terraced dwelling with a large garden to the west. The proposed development would introduce a single storey rear extension onto the property. The plans show the proposed full width extension would extend 6m to the rear and have an eaves height of 3m.
[name].4(1) sets out several limitations which development permitted under Class A which exceeds the limits in paragraph A.1(f) but is allowed by paragraph A.1(g) must adhere to. [name].4(2) to A.4(9) set out procedures for which the prior approval of the Council must be sought before such development under Class A can commence.
[name].4 (7) of the GDPO requires that, where any owner or occupier of an adjoining premises objects to a proposed development that the Local Planning Authority must assess the impact of the proposal on the amenities of any adjoining premises, not only those who have objected, but taking into account any representations made.
I note the comments made with regard to the Residential Design Guide Supplementary Planning Document 2010 (RDGSPD). The RDGSPD sets out that extensions will be considered against, amongst other matters, permitted development rights, site considerations and impact on the amenity of neighbours. I have had regard to the RDGSPD in so far as it relates to the
Section 07
main issue.
I saw on site that the appeal property and No 8 to the north have a small single storey projection on the boundary, providing storage areas, along with a further timber lean-to element, which is not shown on the submitted plans. The appellant states that the brick structure projects a total of approximately 1.5m and the lean-to element a further 2.6m. Whilst dilapidated, this lean to projection includes brick elements and a corrugated sheet roof and as such appears a permanent construction.
The extension would therefore project less than 2m past this structure. The outlook from the rear facing windows of No 8 is set over a good sized garden. I am satisfied that the proposal, by virtue of its minor projection on the boundary past the existing rear projection of this neighbour and limited 3m eaves height, would not be overbearing on the outlook from these windows.
I note that the proposed extension would be sited to the south of this neighbour. However, the limited additional depth means that the additional overshadowing and impact on daylight over the existing boundary structure would again not be significant.
Similarly, the extension would be sited directly north of No 4. As such, the extension would be unlikely to have a significant impact with regards to impact on daylight or overshadowing.
However, No 4 has no structure on its boundary and has a large dining room window in close proximity. The proposed extension would project a full 6m along the boundary at 3m height. Whilst the existing boundary fence is visible, the current outlook from this window takes in the sky above the fence, in addition to views over the garden.
Whilst the garden is a good size and views over it would remain, the occupants of No 4 would be faced with a blank, brick elevation in close proximity which would restrict the existing outlook and be visually dominant, even over the existing boundary wall and fence. It would result in undue harm to the outlook from this neighbouring window, as well as from the garden space of No 4. The development would adversely affect the quality of living conditions available to users of the room served by the window and the garden area as a result.
This impact would be noticeably and demonstrably greater than would be the case from a permitted development extension of 3m depth.
In light of the foregoing, I conclude that the proposed development with regards to Appeal A would, by virtue of its scale and siting, harm the living conditions of the occupiers of the adjoining property (No 4). As a result, the proposed development would conflict with the provisions of Schedule 2, Part 1, Class A, paragraph A.4 of the GPDO. It also conflicts with Policy DM1 of the Development Management Policies Local Plan document (2013).
Section 08
Appeal B
The extension proposed under this appeal is 1m shorter in depth than that proposed under Appeal A. It follows therefore that as I found that the impact of the extension on No 8 is acceptable for a 6m extension, a 5m extension would also be acceptable.
With regards to No 4, again, as the extension would be sited directly north of No 4 it would be unlikely to have a significant impact with regards to impact on daylight or overshadowing.
However, the extension would project 5m along the boundary. This depth of extension, at 3m eaves height, would be demonstrably greater than a permitted development 3m deep extension and would be significantly taller than the existing boundary wall and fence. It would restrict the existing outlook, as set out above, and again would result in a blank, brick elevation in close proximity that would restrict the existing outlook and be visually dominant. It would result in undue harm to the outlook from this neighbouring window, as well as from the garden space of No 4.
In light of the foregoing, I conclude that the proposed development with regards to Appeal B would, by virtue of its scale and siting, harm the living conditions of the occupiers of the adjoining property (No 4). As a result, the proposed development would conflict with the provisions of Schedule 2, Part 1, Class A, paragraph A.4 of the GPDO. It also conflicts with Policy DM1 of the Development Management Policies Local Plan document (2013) to which I have had regard insofar as it relates to amenity.
Section 09
Other Matters
My attention has been drawn to an example at No 12 Lorne Road1 where prior approval has been granted by the Council for proposals that the appellant contends are comparable to this case. I note that no objection was received from a neighbour in this case, and as such the requirement to consider the impact upon neighbouring amenity under paragraph A.4 (7) of the GDPO was not triggered. As such this scheme is not directly comparable. Notwithstanding this, the example does not alter the legislation on which I must base my
Section 10
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that Appeal A and Appeal B should be dismissed.
Section 11
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis Appeal A and Appeal B are dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1218No official casework-database value to compare
- Extracted decision date · page 1
- 3 March 2022Matches the official casework database
- Extracted site visit dates
- 7 February 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3275414
- Application reference
- P/1129/21/PRIOR
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Harrow
- Planning authority code
- E09000015
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Lead
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 27 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 20 May 2021
- Valid date
- 20 May 2021
- Start date
- 11 October 2021
- Planning authority decision date
- 12 May 2021
- Appeal decision date
- 3 March 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 11574
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21