Skip to main content
Official casework recordDismissedCurrent release

Appeal 3275697

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

4 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the installation of a 1.8m high steel railing within existing green hedge along the front and part side boundary and extension to the existing dropped kerb.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are (i) the effect of the proposed boundary treatment on the appearance of the street scene, and (ii) the effect on highway safety.

  3. Section 04

    Reasons

    On the first issue, the houses in [site address] form a development that is based on open plan frontages, and it would appear that the limited exceptions to this are for the most part in the form of shrub and hedge planting.

    However, [site address] already has a frontage hedge that provides a greater degree of enclosure to its front curtilage than the other properties in the Crescent. Subject to its retention at its present height this may well be acceptable, as because of its corner position the dwelling reads with the houses and gardens of [address] as well as those in [site address] .

    However the proposed steel railing is too ‘harsh’ and formal as a means of enclosure and would draw the eye as being harmfully out of character with the open plan Crescent. I note that it would be constructed ‘within’ the existing hedge, but whilst this would ‘soften’ the visual impact of the steel railing, there is no guarantee that the hedge would then remain as a permanent boundary.

    A double width electronic gate of similar materials and height as the proposed fence would have a particularly adverse effect, albeit that any gate at the driveway entrance would be noticeably at odds with its immediate neighbours and the remainder of the Crescent.

    The appellant points out that there is already a similar steel railing fence at the nearby No. [address], but in that case the boundary treatment is in keeping with the street scene of the road. As regards the need for security, this is a matter to be taken into account when the house is purchased and it is not reasonable to expect houses on an open plan estate to have the same degree of security as properties in locations where impenetrable boundaries are visually acceptable.

    The proposal would also have an adverse effect on the setting of the nearby [address] Conservation Area and overall on this issue, I conclude that the installation of a 1.8m high steel railing within the existing hedge along the front and part side boundary would harm the street scene. Accordingly, it would be in conflict with Policy CS5 of the Council’s LDF Core Strategy 2007 and Policies DM9 & DM10 of the LDF Development Management Policies Document 2015 (‘the DMPD’).

    On the second issue, the Highway Authority have requested details of vehicle/pedestrian intervisibility splays as information required before consideration is given to approval of the extension to the existing dropped kerb.

    As far as I can tell from the information before me in this appeal, this has not been provided. And without a commitment to the provision of these splays to ensure that the access over the extended dropped kerb would be used without causing a highway safety hazard, I am also unable to allow the appeal insofar as it relates to the dropped kerb. This part of the appeal scheme would be in conflict with Policies CS1 and CS16 of the [name] and Policies DM10 & DM35 of the DMPD.

    For the reasons explained above, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 204No official casework-database value to compare
    Extracted decision date · page 1
    4 October 2021Matches the official casework database
    Extracted site visit dates
    20 September 2021 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3275697
Application reference
21/00110/FLH
Lead case reference
Not recorded
Planning authority
Epsom and Ewell Borough Council
Planning authority code
E07000208

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
0 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
25 May 2021
Valid date
2 June 2021
Start date
26 August 2021
Planning authority decision date
13 April 2021
Appeal decision date
4 October 2021

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
4212
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21